Page views this IP this session = 1 of 10 unsubscribed pagesBrechfa Forest West Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Brechfa Forest West Wind Farm (Wind , Active) Location in the UK : Wales, Between Carmarthen and Lampeter Type of installation: Wind on/offshore: on Turbines :28 Capacity : 56 MW Approx Date of 1st power generation: January 2018
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Brechfa Forest West Wind Farm, centred around the Afon Pib valley, east of Alltwalis. Npower Renewables studies suggest this location could acommodate 28 turbines.
Model: |
Senvion MM92
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
12
|
Rotor Diameter: |
92
|
Stop Speed: |
25
|
Hub Height |
100 Avg for all turbines:3217
|
Avg. Elevation: |
314
|
Web Page: |
http://www.repower.de/wind-power-solutions/wind-turbines/5m/ |
Comment: |
The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.
|
rechfa Forest West Wind Farm Gwyddgrug Pencader SA39 9AU Wales
Relationship |
Company (For:
Brechfa Forest West
) |
Developer | RWE Innogy |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Brechfa Forest West 57.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Dyfed Country: Wales LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
3695 / A0225
District:
|
Applicant: |
RWE Npower Renewables
Application :
EN010008
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
28 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
57.4 |
Site Address: |
centred around the Afon Pib Valley, east of Alltwalis and the second area around Banc Llywelau, south of Rhydcymerau.
|
|
|
County: |
Dyfed Region: Wales
|
OS Coordinates: |
254202 / 254202
|
Development Status: |
Operational
|
Application Submitted: |
11/4/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
11/24/2016
|
|
|
Generator Live |
1/18/2018
|
This Record Last Updated: |
9/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Brechfa Forest West Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00218RQWA
|
Capacity: |
56826
|
Status: |
Live
|
Accreditation Date: |
11/4/2011
|
|
|
Commission Date: |
1/18/2018
|
|
|
Applicant: |
Innogy Renewables UK Limited (Wind)
|
Applicant Address: |
Windmill Hill Business Park
Whitehill Way
Swindon
SN5 6PB
England
|
Address: |
Brechfa Forest West Wind Farm
Gwyddgrug
Pencader
SA39 9AU
Wales
|
Site Name: |
Brechfa Forest West Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01679NWWA
|
Capacity: |
56826
|
Status: |
Live
|
Accreditation Date: |
11/4/2011
|
|
|
Commission Date: |
1/18/2018
|
|
|
Applicant: |
Innogy Renewables UK Limited (Wind)
|
Applicant Address: |
Windmill Hill Business Park
Whitehill Way
Swindon
SN5 6PB
England
|
Address: |
Brechfa Forest West Wind Farm
Gwyddgrug
Pencader
SA39 9AU
Wales
|
|
Assumptions: Capacity: 56826kW 56.826 MW, Thus over the month Capacity * 720 hours per month = 40914.72 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Sorry I found no matches, Please try again.
|
Capacity: 112 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/27/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|