Brechfa Forest West Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Brechfa Forest West Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Between Carmarthen and Lampeter    
Type of installation: Wind    on/offshore: on
Turbines :28  Capacity : 56 MW
Approx Date of 1st power generation: January 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Brechfa Forest West Wind Farm, centred around the Afon Pib valley, east of Alltwalis. Npower Renewables studies suggest this location could acommodate 28 turbines.

 Turbine Make and Specs

Model: Senvion MM92 Start Speed: 4
Capacity: 2 Optimal Speed: 12
Rotor Diameter: 92 Stop Speed: 25
Hub Height 100   Avg for all turbines:3217 Avg. Elevation: 314
Web Page: http://www.repower.de/wind-power-solutions/wind-turbines/5m/
Comment: The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.

 Address

rechfa Forest West Wind Farm Gwyddgrug Pencader SA39 9AU Wales

 Associated Companies.

Relationship Company (For: Brechfa Forest West )
DeveloperRWE Innogy

 DECC Data on this Project: Brechfa Forest West :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Brechfa Forest West     57.4 MW
Energy Type: Wind Onshore
County: Dyfed     Country: Wales     LPA: The Planning Inspectorate - National Infrastructure
Site ID and Reference: 3695 / A0225     District:
Applicant: RWE Npower Renewables     Application : EN010008 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 28 Turbine Capacity: 2.0499999999999998
Height of Turbines: Calculated capacity: 57.4
Site Address: centred around the Afon Pib Valley, east of Alltwalis and the second area around Banc Llywelau, south of Rhydcymerau.
 
County: Dyfed Region: Wales
OS Coordinates: 254202 / 254202
Development Status: Operational
Application Submitted: 11/4/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/24/2016    
Generator Live 1/18/2018 This Record Last Updated: 9/4/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Brechfa Forest West: Wind :

Site Name: Brechfa Forest West Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00218RQWA
Capacity: 56826 Status: Live
Accreditation Date: 11/4/2011    
Commission Date: 1/18/2018    
Applicant: Innogy Renewables UK Limited (Wind)
Applicant Address: Windmill Hill Business Park Whitehill Way Swindon SN5 6PB England
Address: Brechfa Forest West Wind Farm Gwyddgrug Pencader SA39 9AU Wales

Site Name: Brechfa Forest West Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01679NWWA
Capacity: 56826 Status: Live
Accreditation Date: 11/4/2011    
Commission Date: 1/18/2018    
Applicant: Innogy Renewables UK Limited (Wind)
Applicant Address: Windmill Hill Business Park Whitehill Way Swindon SN5 6PB England
Address: Brechfa Forest West Wind Farm Gwyddgrug Pencader SA39 9AU Wales
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 56826kW 56.826 MW,
Thus over the month Capacity * 720 hours per month = 40914.72 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

 Calculations


Capacity: 112
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 112 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352765

Project Info
Senvion grabs RWE contract
RWE has confirmed it has awarded a contract to German turbine supplier Senvion to supply all 28 turbines to its 57.4MW BRECHFA FOREST WEST Wind Farm in Wales.

Work to start on Brechfa West wind farm
CONSTRUCTION of a 28 turbine wind farm in BRECHFA FOREST WEST, is expected to start within weeks and will take up to 20 months to complete.

Brecha Forest West: Non technical Summary

RWE gets nod on 84MW Brechfa
The UK government has approved RWE npower renewables’ 84MW BRECHFA FOREST WEST wind farm in Carmarthenshire, south-west Wales.

Npower Renewables: Brecha Forest

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School