On April 4, Viking Energy was granted permission to build what will be one of the most productive wind farms in the world.
The wind farm will consist of 103 wind turbines up to 145m tall to the blade tips, set in the central Mainland of Shetland. The consent allows a potential output of up to 457 megawatts, which would make it the third-largest wind farm in Scotland.
If a 3.6MW turbine is used the maximum output would be 370.8MW – enough to meet the electricity needs of up to 335,000 homes[1] while saving 0.61 million tonnes of carbon dioxide (CO2) emissions each year.
Viking Energy, the joint venture between the Shetland community and Scottish and Southern Energy (SSE), submitted its application for a 150-turbine, 540 megawatt wind farm on Shetland to the Scottish Government on Wednesday 20 May 2009.
Viking Energy is a 50:50 partnership between Viking Energy Ltd and SSE Viking Ltd. SSE Viking Ltd is a subsidiary of Scottish and Southern Energy plc. Viking Energy Ltd is the company established to represent the interests of the Shetland community in large-scale windfarm development in Shetland.
Model: |
Siemens SWT 3.6 103
|
Start Speed: |
5
|
Capacity: |
3.6
|
Optimal Speed: |
15
|
Rotor Diameter: |
103
|
Stop Speed: |
25
|
Hub Height |
90 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
|
Comment: |
|
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Viking Wind Farm 443 MW
|
Energy Type: |
Wind Onshore |
County: |
Shetland Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
6828 /
District:
|
Applicant: |
Viking Energy Wind Farm
Application :
ECU00000723
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
103 |
Turbine Capacity: |
4.2999999999999998 |
Height of Turbines: |
155 |
Calculated capacity: |
442.9 |
Site Address: |
Lang Kame, Shetland Island
|
|
|
County: |
Shetland Region: Scotland
|
OS Coordinates: |
443800 / 443800
|
Development Status: |
Under Construction
|
Application Submitted: |
11/14/2018
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2020
|
|
|
Generator Live |
|
This Record Last Updated: |
1/24/2022
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Viking Wind Farm 370 MW
|
Energy Type: |
Wind Onshore |
County: |
Shetland Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4622 / EN00210
District:
|
Applicant: |
Viking Energy / Scottish and Southern
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
103 |
Turbine Capacity: |
3.5 |
Height of Turbines: |
|
Calculated capacity: |
360.5 |
Site Address: |
Lang Kames, Shetland Island
|
|
|
County: |
Shetland Region: Scotland
|
OS Coordinates: |
443800 / 443800
|
Development Status: |
Revised
|
Application Submitted: |
5/20/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/25/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|