Viking Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Viking Wind Farm (Wind , Agreed/Planning)

 General Information.

Location in the UK : Scotland, Shetland Islands    
Type of installation: Wind    on/offshore: on
Turbines :103  Capacity : 457 MW
Approx Date of 1st power generation: 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

On April 4, Viking Energy was granted permission to build what will be one of the most productive wind farms in the world.
The wind farm will consist of 103 wind turbines up to 145m tall to the blade tips, set in the central Mainland of Shetland. The consent allows a potential output of up to 457 megawatts, which would make it the third-largest wind farm in Scotland.
If a 3.6MW turbine is used the maximum output would be 370.8MW – enough to meet the electricity needs of up to 335,000 homes[1] while saving 0.61 million tonnes of carbon dioxide (CO2) emissions each year.

Viking Energy, the joint venture between the Shetland community and Scottish and Southern Energy (SSE), submitted its application for a 150-turbine, 540 megawatt wind farm on Shetland to the Scottish Government on Wednesday 20 May 2009.
Viking Energy is a 50:50 partnership between Viking Energy Ltd and SSE Viking Ltd. SSE Viking Ltd is a subsidiary of Scottish and Southern Energy plc. Viking Energy Ltd is the company established to represent the interests of the Shetland community in large-scale windfarm development in Shetland.

 Turbine Make and Specs

Model: Siemens SWT 3.6 103 Start Speed: 5
Capacity: 3.6 Optimal Speed: 15
Rotor Diameter: 103 Stop Speed: 25
Hub Height 90   Avg for all turbines: Avg. Elevation:
Web Page:
Comment:

 Address

 Associated Companies.

Relationship Company (For: Viking )
DeveloperScottish and Southern Energy
DeveloperViking

 DECC Data on this Project: Viking :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Viking Wind Farm     443 MW
Energy Type: Wind Onshore
County: Shetland     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 6828 /     District:
Applicant: Viking Energy Wind Farm     Application : ECU00000723 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 103 Turbine Capacity: 4.2999999999999998
Height of Turbines: 155 Calculated capacity: 442.9
Site Address: Lang Kame, Shetland Island
 
County: Shetland Region: Scotland
OS Coordinates: 443800 / 443800
Development Status: Under Construction
Application Submitted: 11/14/2018 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2020    
Generator Live This Record Last Updated: 1/24/2022
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Viking Wind Farm     370 MW
Energy Type: Wind Onshore
County: Shetland     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4622 / EN00210     District:
Applicant: Viking Energy / Scottish and Southern     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 103 Turbine Capacity: 3.5
Height of Turbines: Calculated capacity: 360.5
Site Address: Lang Kames, Shetland Island
 
County: Shetland Region: Scotland
OS Coordinates: 443800 / 443800
Development Status: Revised
Application Submitted: 5/20/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 6/25/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Viking: Wind : -na-

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio

Project Info
VIKING
A revised application was consented again by Scottish Ministers in May 2019, following approval by Shetland Islands Council in December 2018.

Onshore back in business with 1.5GW win
SSE Renewables netted a contract for 220MW of its VIKING wind farm - half of the Shetland project's 443MW overall capacity - in the round's largest offer. Brockwell Energy’s 212MW North Kyle project in East Ayrshire followed in a close second.

The Project

VIKING Energy

Wiki: VIKING Energy Wind Farm

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School