Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBrigg Biomass Energy
Brigg (Biomass , Active) Location in the UK : Scotland, Lincolnshire Type of installation: Biomass on/offshore: on Turbines :0 Capacity : 40 MW Approx Date of 1st power generation:
/YES
This plant has been refused planning permission and is subject to a public inquiry sometime in 2011.
Brigg Renewable Energy Project: Will use straw, sourced from local farms, to generate some 300 million units of electricity annually, equivalent to the average needs of 65,000 households. The ash will be returned to the farms to be ploughed in as a fertilizer.
The generation of an estimated quarter of a million tonnes of carbon dioxide could be avoided each year.
While the soil conditioning aspect of straw being ploughed back into the soil will be lost, the overall level of sustainability within this project is high, however there will be a high volume of lorry traffic created by this scheme, apparently an alternative, being the use of barges has been dismissed.
An application for planning permission to build Brigg Renewable Energy Plant was first submitted in 2008. After consultation, these plans were withdrawn to allow Eco2 to reconsider its proposals for dealing with flood risk at the site.
Eco2 re-submitted a planning application which has taken into account Environment Agency concerns surrounding flood mitigation. The new plans included flood plain compensation and a surface water storage system that are designed specifically for the Brigg REP site. If the plans go ahead, the scheme would reduce the extent of flooding in the local area.
Relationship |
Company (For:
Brigg
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Brigg Renewable Energy Plant 40 MW
|
Energy Type: |
Biomass (dedicated) |
County: |
Humberside Country: England LPA: North Lincolnshire Council
|
Site ID and Reference: |
150 / AA440
District:
|
Applicant: |
Eco2
Application :
PA/2009/0334
|
(Go to search to find Application) |
Site Address: |
British Sugar Corporation Ltd, Access roads to power station, Scawby
|
|
DN20 9LT
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
498860 / 498860
|
Development Status: |
Operational
|
Application Submitted: |
3/23/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
4/7/2010
|
Construction Date: |
6/19/2014
|
|
|
Generator Live |
2/23/2016
|
This Record Last Updated: |
11/2/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
4/7/2010 |
Site Name: |
Brigg Renewable Energy Plant 40 MW
|
Energy Type: |
Biomass (dedicated) |
County: |
Humberside Country: England LPA: North Lincolnshire Council
|
Site ID and Reference: |
42 / EN00573
District:
|
Applicant: |
Private Developer
Application :
PA/2008/0793
|
(Go to search to find Application) |
Site Address: |
British Sugar Corporation Ltd, Access roads to power station, Scawby
|
|
DN20 9LT
|
County: |
Humberside Region: Yorkshire and Humber
|
OS Coordinates: |
498860 / 498860
|
Development Status: |
Revised
|
Application Submitted: |
5/22/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
8/18/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
9/15/2008 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Brigg REP
|
Generator Type: |
Biomass (e.g. Plant or animal matter)
|
Scheme : |
REGO
|
Generator ID: |
G01715BWEN
|
Capacity: |
43000
|
Status: |
Live
|
Accreditation Date: |
5/22/2008
|
|
|
Commission Date: |
10/20/2015
|
|
|
Applicant: |
BWSC North Lincs Limited
|
Applicant Address: |
Suite 1, 3rd Floor
11-12 St. James's Square
London
SW1Y 4LB
England
|
Address: |
Brigg Renewable Energy Plant
Scawby Brook
Brigg
DN20 9LT
England
|
|
Assumptions: Capacity: 43000kW 43 MW, Thus over the month Capacity * 720 hours per month = 30960 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 9796 | 22.78% | Issued | 01/02/2018 | | | 8800 | 20.47% | Issued | 01/01/2018 | | | 15218 | 35.39% | Issued | 01/12/2017 | | | 23521 | 54.70% | Issued | 01/11/2017 | | | 25245 | 58.71% | Retired | 01/10/2017 | | | 26057 | 60.60% | Retired | 01/09/2017 | | | 27690 | 64.40% | Retired | 01/08/2017 | | | 27813 | 64.68% | Retired | 01/07/2017 | | | 27750 | 64.53% | Retired | 01/06/2017 | | | 28340 | 65.91% | Retired | 01/05/2017 | | | 18217 | 42.37% | Issued | 01/04/2017 | | | 28567 | 66.43% | Issued | 01/03/2017 | | | 29401 | 68.37% | Issued | 01/02/2017 | | | 25518 | 59.34% | Issued | 01/01/2017 | | | 27886 | 64.85% | Issued | Dec-16 | 0 | 39139 | 25552 | 59.42% | Issued | Nov-16 | 0 | 33386 | 21427 | 49.83% | Pending Tr | Oct-16 | 0 | 43404 | 28265 | 65.73% | Pending Tr | Sep-16 | 0 | 41768 | 26884 | 62.52% | Pending Tr | Aug-16 | 0 | 41410 | 26695 | 62.08% | Pending Tr | Jul-16 | 0 | 41267 | 26105 | 60.71% | Pending Tr | Jun-16 | 0 | 24365 | 15587 | 36.25% | Pending Tr | May-16 | 0 | 36652 | 23622 | 54.93% | Pending Tr | Apr-16 | 0 | 38304 | 24765 | 57.59% | Pending Tr | Mar-16 | 0 | 37713 | 24250 | 56.40% | Redeemed | Feb-16 | 0 | 38949 | 25435 | 59.15% | Redeemed | Jan-16 | 0 | 31041 | 20520 | 47.72% | Redeemed | Dec-15 | 0 | 22855 | 15416 | 35.85% | Redeemed | Nov-15 | 0 | 4196 | 3025 | 7.03% | Redeemed |
|
Project Info |
Fears over green power plant plan (2008)Plans for a "green" power station near BRIGG in North Lincolnshire have sparked protests from local residents.
STRAW POLL IS ALL WE CAN OFFER (Feb 2010) It was good of the Scunthorpe Telegraph to inform us this week that the BRIGG Biomass power plant scheme has been amended and re-submitted for council consideration.
Planning Application (Resubmission) This page contains a listing of every document that formed part of the BRIGG planning application pack. The document comprised four volumes:
Cameron backs BRIGG biomass plant (2008) Conservative Party leader David Cameron MP said he supported a planned biomass in BRIGG, when he attended a special public meeting last night.
Anti-biomass campaign banner stolen (2009) CAMPAIGNERS who are fighting to block Eco2's plans to build the BRIGG biomass plant say they are not going to give up – despite having all of their banners removed.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|