Hadyard Hill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Hadyard Hill Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, South Ayrshire    
Type of installation: Wind    on/offshore: on
Turbines :52  Capacity : 120 MW
Approx Date of 1st power generation: March 2006

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Hadyard Hill, Barr: The wind farm consists of 52 Siemens 2.3MW turbines giving an overall installed capacity of 119.5MW. The turbines have a 60-70metre hub height and a 82 metre rotor diameter. The wind farm is connected to the substation at Maybole by a 132kV wooden pole over head line.

 Turbine Make and Specs

Model: Siemens SWT 2.3 Start Speed: 4.5
Capacity: 2.3 Optimal Speed: 25
Rotor Diameter: 101 Stop Speed: 25
Hub Height 70   Avg for all turbines:70 Avg. Elevation: 236
Web Page: http://tinyurl.com/simens2-3
Comment:

 Address

Hadyard Hill Windfarm Old Dailly By Girvan Ayrshire KA26 9TH

 Associated Companies.

Relationship Company (For: Hadyard Hill )
OperatorScottish and Southern Energy
OwnerScottish and Southern Energy

 DECC Data on this Project: Hadyard Hill :3109

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hadyard Hill extension     88 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 3375 / B1277     District:
Applicant: Scottish and Southern Energy (SSE)     Application : EC00003118 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 22 Turbine Capacity: 4
Height of Turbines: 127 Calculated capacity: 88
Site Address: Hadyard Hill , east of Girvan , South Ayrshire
 
County: Strathclyde Region: Scotland
OS Coordinates: 227000 / 227000
Development Status: Planning Application Withdrawn
Application Submitted: 4/22/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 11/30/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 11/21/2017    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Hadyard Hill     120 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 3109 / N00045W     District:
Applicant: Scottish and Southern Energy (SSE)     Application : 03/01745/DEEM (Go to search to find Application)
For Wind Farms  
Number of Turbines: 52 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 119.6
Site Address: Hadyard Hill , East of Girvan , South Ayrshire
 
County: Strathclyde Region: Scotland
OS Coordinates: 226478 / 226478
Development Status: Operational
Application Submitted: 5/27/2003 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/1/2006    
Generator Live 5/8/2006 This Record Last Updated: 5/6/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hadyard Hill: Wind : R00063SQSC

Site Name: Hadyard Hill Windfarm - A,C
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00063SQSC
Capacity: 99000 Status: Live
Accreditation Date: 5/27/2003    
Commission Date: 11/1/2005    
Applicant: SSE Generation Ltd
Applicant Address: Scottish Hydro Electric plc Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Scotland
Address: Hadyard Hill Windfarm Old Dailly By Girvan KA26 9TH Scotland

 Calculations


Capacity: 243.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 243.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353019

Project Info
HADYARD HILL Wind farm ground works

DP Energy - Inc. Maps and images

HADYARD HILL Wind Farm, Extension

Wind farm misery for property owners
The couple live 745 yards from HADYARD HILL wind farm. It has 52 turbines and is run by Scottish and Southern Energy.

South West Scotland Wind Farms - Turbine maps
covers Arecleoch; Artfield Fell; Assel valley; Breaker Hill; Dersalloch; Glenapp & Loch Ree; Glenchamber; Glenvernoch; HADYARD HILL; Hill of Ochiltree; Kilgallioch; Mark Hill; North Rhins; Straid; Tralorg Hill.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School