vid = 1951pws_id = 321971pws_id = 321971
--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:8630 Ind:1 IP: 13.58.40.171 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Fullabrook Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Fullabrook Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, North Devon, Barnstaple    
Type of installation: Wind    on/offshore: on
Turbines :22  Capacity : 66 MW
Approx Date of 1st power generation: January 2012

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Devon Wind Power Ltd owns the Fullabrook Wind Farm situated between Barnstaple and Ilfracombe in North Devon. DWP: Devon Wind Power /ESB: Electricity Supply Board. For each turbine foundation, approximately 410 cubic metres of concrete is required. Overall, a total of over 9,000 cubic metres of concrete will be needed for all 22 turbine bases.

 Turbine Make and Specs

Model: Vestas V90 Start Speed: 3.5
Capacity: 3 Optimal Speed: 15
Rotor Diameter: 90 Stop Speed: 25
Hub Height 65   Avg for all turbines:65 Avg. Elevation: 173
Web Page: http://www.vestas.com/en/wind-power-plants/procurement/turbine-overview/v90-3.0-mw.aspx#/vestas-univers
Comment: The V90-3.0 MW is designed to be low weight, making it easier to transport and install and reducing foundation costs thanks to its lower load.

 Address

Fullabrook Wind Farm Burland Cross Bittadon Nr Barnstaple EX31 4HL England

 Associated Companies.

Relationship Company (For: Fullabrook )
DeveloperDevon Wind Power
OperatorDevon Wind Power

 DECC Data on this Project: Fullabrook :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Fullabrook Down Wind Farm     66 MW
Energy Type: Wind Onshore
County: Devon     Country: England     LPA: DECC (S36)
Site ID and Reference: 4033 / N00293W     District:
Applicant: Devon Wind Power Ltd     Application : 38622 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 22 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 66
Site Address: Fullabrook Down, Crackaway, Barton
 
County: Devon Region: South West
OS Coordinates: 253055 / 253055
Development Status: Operational
Application Submitted: 10/18/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/1/2008    
Generator Live 1/24/2012 This Record Last Updated: 4/19/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Fullabrook: Wind :

Site Name: Fullabrook Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00236RQEN
Capacity: 65172 Status: Live
Accreditation Date: 10/18/2004    
Commission Date: 6/1/2011    
Applicant: Devon Wind Power Ltd.
Applicant Address: Aquis Court 31 Fishpool St St Albans AL3 4RF England
Address: Fullabrook Wind Farm Burland Cross Bittadon Nr Barnstaple EX31 4HL England

Site Name: Fullabrook Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01854NWEN
Capacity: 65172 Status: Live
Accreditation Date: 10/18/2004    
Commission Date: 6/1/2011    
Applicant: Devon Wind Power Ltd.
Applicant Address: Aquis Court 31 Fishpool St St Albans AL3 4RF England
Address: Fullabrook Wind Farm Burland Cross Bittadon Nr Barnstaple EX31 4HL England
 
Assumptions: Capacity: 65172kW 65.172 MW,
Thus over the month Capacity * 720 hours per month = 46923.84 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 11303 17.34% Issued
01/03/2018 15076 23.13% Issued
01/02/2018 13754 21.10% Issued
01/01/2018 20688 31.74% Issued
01/12/2017 12505 19.19% Issued
01/11/2017 13759 21.11% Issued
01/10/2017 14385 22.07% Issued
01/09/2017 12066 18.51% Issued
01/08/2017 8334 12.79% Issued
01/07/2017 6072 9.32% Issued
01/06/2017 8970 13.76% Issued
01/06/2017 6 0.01% Revoked
01/05/2017 6129 9.40% Issued
01/04/2017 6881 10.56% Issued
01/04/2017 25 0.04% Revoked
01/03/2017 16317 25.04% Redeemed
01/02/2017 14506 22.26% Redeemed
01/01/2017 12275 18.83% Redeemed
Dec-16 09850 9967 15.29% Issued
Nov-16 012901 12901 19.80% Issued
Oct-16 06546 6587 10.11% Issued
Sep-16 07015 7057 10.83% Issued
Aug-16 09630 9685 14.86% Issued
Jul-16 07972 8024 12.31% Issued
Jul-16 07972 8024 12.31% Pending Tr
Jun-16 05693 5761 8.84% Issued
May-16 07307 7375 11.32% Issued
Apr-16 011260 11260 17.28% Issued
Mar-16 012561 12630 19.38% Redeemed
Feb-16 015659 15659 24.03% Redeemed
Jan-16 019359 19359 29.70% Redeemed
Dec-15 021275 21275 32.64% Redeemed
Nov-15 020682 20682 31.73% Redeemed
Oct-15 08654 8729 13.39% Redeemed
Sep-15 06421 6476 9.94% Redeemed
Aug-15 06568 6658 10.22% Redeemed
Jul-15 1003310033 10094 15.49% Redeemed
Jun-15 85728572 8653 13.28% Redeemed
May-15 1313413176 13176 20.22% Redeemed
Apr-15 86548655 8752 13.43% Redeemed
Mar-15 1287012910 12910 19.81% Redeemed
Feb-15 1099111034 11034 16.93% Redeemed
Jan-15 2004720081 8600 13.20% Redeemed
Dec-14 2139321451 21451 32.91% Redeemed
Nov-14 1195111951 12013 18.43% Redeemed
Oct-14 1382813864 13864 21.27% Redeemed
Sep-14 34683468 3558 5.46% Redeemed
Aug-14 1145911504 11504 17.65% Redeemed
Jul-14 50125012 5139 7.89% Redeemed
Jun-14 40724072 4218 6.47% Redeemed
May-14 89418942 9034 13.86% Redeemed
Apr-14 85598558 8617 13.22% Redeemed
Mar-14 1190111901 11986 18.39% Redeemed
Feb-14 2113921148 21148 32.45% Redeemed
Jan-14 1763417664 1 0.00% Redeemed
Dec-13 1832018354 18353 28.16% Redeemed
Nov-13 1271112769 1 0.00% Redeemed
Oct-13 1657916605 16605 25.48% Redeemed
Sep-13 94339432 9485 14.55% Redeemed
Aug-13 38153815 3852 5.91% Redeemed
Jul-13 56545654 5760 8.84% Redeemed
Jun-13 1245512502 12502 19.18% Redeemed
May-13 1282212884 12884 19.77% Redeemed
Apr-13 1596816006 16006 24.56% Redeemed
Mar-13 1538115434 15434 23.68% Redeemed
Feb-13 1486314887 14887 22.84% Redeemed
Jan-13 1620716253 16253 24.94% Redeemed
Dec-12 2007220092 20092 30.83% Redeemed
Nov-12 1089910941 10941 16.79% Redeemed
Oct-12 1289712949 12949 19.87% Redeemed
Sep-12 1116511210 11210 17.20% Redeemed
Aug-12 97819780 9844 15.10% Redeemed
Jul-12 59075908 5947 9.13% Redeemed
May-12 36513651 3704 5.68% Redeemed
Apr-12 84138413 8465 12.99% Redeemed
Mar-12 75777577 7687 11.79% Redeemed
Feb-12 91949194 9259 14.21% Redeemed
Jan-12 1956919577 19577 30.04% Redeemed
Dec-11 2213422139 22139 33.97% Redeemed
Nov-11 1387313881 13881 21.30% Redeemed
Oct-11 1263912657 12657 19.42% Redeemed
Sep-11 1561415631 15631 23.98% Redeemed
Aug-11 36343652 666 1.02% Redeemed
Jul-11 13351335 1351 2.07% Redeemed

 Calculations


Capacity: 132
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 132 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 321971

Project Info
Devon Wind Power: FULLABROOK

Councils opposition to FULLABROOK

Geotechnics: FULLABROOK

Mysterious object captured hovering above FULLABROOK wind farm in Devon
The mysterious object - which is grey in colour, quite large and oval-shaped - was unintentionally captured by a professional photographer.

FULLABROOK wind farm turbine testing nearly complete
Devon Wind Power said the site at FULLABROOK, between Barnstaple and Braunton, should be fully operational "within days".

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School