Sorry I found no matches, Please try again. 176
vid = 1995pws_id = 352687pws_id = 352687 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.15.228.162 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Blackburn Meadows Biomass Energy

Blackburn Meadows (Biomass , Active)

 General Information.

Location in the UK : England, Tinsley, Sheffield, West Yorkshire    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 30 MW
Approx Date of 1st power generation:

/YES

 Comment

Final plans for a £120m biomass power plant to be built in South Yorkshire on the site of the old Tinsley cooling towers have been unveiled.

Once built, the new power station will produce enough power for around 40,000 homes and displace the emission of around 80,000 tonnes of carbon dioxide every year, by burning carbon neutral fuel, such as willow or elephant grass, in place of traditional fuels like coal and gas.

Construction is expected to commence in November 2011.

 Address

Alsing Road Sheffield S9 1HF England

 Associated Companies.

Relationship Company (For: Blackburn Meadows )
DeveloperE.on UK

 DECC Data on this Project: Blackburn Meadows :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Blackburn Meadows Biomass Plant     30 MW
Energy Type: Biomass (dedicated)
County: South Yorkshire     Country: England     LPA: Sheffield City Council
Site ID and Reference: 166 / EN00529     District:
Applicant: E.ON UK     Application : 08/01225/OUT (Go to search to find Application)
Site Address: Blackburn Meadows in Sheffield,
 
County: South Yorkshire Region: Yorkshire and Humber
OS Coordinates: 440075 / 440075
Development Status: Operational
Application Submitted: 3/1/2008 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/1/2011    
Generator Live 7/7/2014 This Record Last Updated: 11/2/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Blackburn Meadows: Biomass :

Site Name: Blackburn Meadows Renewable Energy Plant
Generator Type: Fuelled
Scheme : RO Generator ID: R00147RAEN
Capacity: 32000 Status: Live
Accreditation Date: 3/1/2008    
Commission Date: 6/24/2014    
Applicant: EON UK plc
Applicant Address: Powergen Renewables Ltd Westwood Way Westwood Business Park Coventry CV4 8LG England
Address: Alsing Road Sheffield S9 1HF England

Site Name: Blackburn Meadows Renewable Energy Plant
Generator Type: Biomass (e.g. Plant or animal matter)
Scheme : REGO Generator ID: G01530BWEN
Capacity: 32000 Status: Live
Accreditation Date: 3/1/2008    
Commission Date: 6/24/2014    
Applicant: EON UK plc
Applicant Address: Powergen Renewables Ltd Westwood Way Westwood Business Park Coventry CV4 8LG England
Address: Alsing Road Sheffield S9 1HF England
 
Assumptions: Capacity: 32000kW 32 MW,
Thus over the month Capacity * 720 hours per month = 23040 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 22225 69.45% Issued
01/02/2018 20005 62.52% Issued
01/01/2018 18815 58.80% Issued
01/12/2017 22282 69.63% Issued
01/11/2017 21484 67.14% Issued
01/10/2017 22670 70.84% Issued
01/09/2017 581 1.82% Issued
01/09/2017 21136 66.05% Issued
01/08/2017 21549 67.34% Issued
01/08/2017 601 1.88% Issued
01/07/2017 424 1.33% Issued
01/07/2017 21612 67.54% Issued
01/06/2017 11465 35.83% Issued
01/05/2017 22305 69.70% Issued
01/04/2017 21355 66.73% Issued
01/03/2017 16279 50.87% Redeemed
01/02/2017 17159 53.62% Redeemed
01/01/2017 15527 48.52% Redeemed
Dec-16 038097 21316 66.61% Issued
Nov-16 036421 20449 63.90% Issued
Oct-16 040205 22570 70.53% Issued
Sep-16 038138 21452 67.04% Issued
Aug-16 036149 20355 63.61% Issued
Jul-16 023202 13201 41.25% Issued
Jun-16 028808 16285 50.89% Issued
Jun-16 028808 16285 50.89% Issued
May-16 037042 20844 65.14% Issued
Apr-16 039775 22165 69.27% Issued
Mar-16 041057 22900 71.56% Redeemed
Feb-16 038513 21463 67.07% Redeemed
Jan-16 040795 22787 71.21% Redeemed
Dec-15 040815 22839 71.37% Redeemed
Nov-15 039257 22046 68.89% Redeemed
Oct-15 040439 22609 70.65% Redeemed
Sep-15 034764 21904 68.45% Redeemed
Aug-15 029938 22418 70.06% Redeemed
Jul-15 1740525964 19497 60.93% Redeemed
Jun-15 1866127918 20814 65.04% Redeemed
May-15 1890928245 21120 66.00% Redeemed
Apr-15 2002330020 22303 69.70% Redeemed
Mar-15 1194017501 13303 41.57% Redeemed
Feb-15 843812428 9374 29.29% Redeemed
Jan-15 2050330753 22786 71.21% Redeemed
Dec-14 1805726882 19993 62.48% Redeemed
Nov-14 2008330100 22251 69.53% Redeemed
Oct-14 1293919117 14343 44.82% Redeemed
Sep-14 817411955 9053 28.29% Redeemed
Aug-14 1376520029 15070 47.09% Redeemed
Jul-14 1163416300 12407 38.77% Redeemed

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School