Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHare Hill Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Hare Hill Wind Farm (Wind , Active) Location in the UK : Scotland, County Durham, England Type of installation: Wind on/offshore: on Turbines :20 Capacity : 13 MW Approx Date of 1st power generation: November 2000
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
At the time of their construction in 2004, the turbines at Harehill Wind Farm were the largest and most powerful in the UK.
Under the terms of the first of the agreements signed with the Scottish utility1, Gamesa will install and commission 35 G52-850 kW turbines, with heights ranging between 44 and 65 metres, for expansion of the Hare Hill wind farm, a development located close to the Scottish town of New Cumnock.
Model: |
Gamesa G52
|
Start Speed: |
4
|
Capacity: |
0.85
|
Optimal Speed: |
13
|
Rotor Diameter: |
52
|
Stop Speed: |
24
|
Hub Height |
40 Avg for all turbines:39
|
Avg. Elevation: |
519
|
Web Page: |
http://www.gamesacorp.com/en/products-and-services/wind-turbines/gamesa-g52-850-kw-en.html |
Comment: |
|
Hare Hill Wind Farm New Cumnock AyrshireNew Cumnock Ayrshire Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hare Hill Extension 29.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: East Ayrshire Council
|
Site ID and Reference: |
4157 / A0397
District:
|
Applicant: |
Scottish Power Renewables
Application :
07/0809/FL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
35 |
Turbine Capacity: |
0.84999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
29.75 |
Site Address: |
New Cumnock, East Ayreshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
265320 / 265320
|
Development Status: |
Operational
|
Application Submitted: |
9/4/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
10/15/2015
|
|
|
Generator Live |
9/15/2016
|
This Record Last Updated: |
10/2/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hare Hill (East Ayrshire) 13.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: East Ayrshire Council
|
Site ID and Reference: |
2711 / A0237
District:
|
Applicant: |
Scottish Power Renewables
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
20 |
Turbine Capacity: |
0.66000000000000003 |
Height of Turbines: |
|
Calculated capacity: |
13.2 |
Site Address: |
New Cumnock, East Ayreshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
265320 / 265320
|
Development Status: |
Operational
|
Application Submitted: |
2/10/1996
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
5/24/2019
|
Construction Date: |
|
|
|
Generator Live |
11/1/2000
|
This Record Last Updated: |
10/2/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
5/24/2019 |
Site Name: |
Hare Hill Extension
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00310SQSC
|
Capacity: |
29750
|
Status: |
Live
|
Accreditation Date: |
2/10/1996
|
|
|
Commission Date: |
9/21/2016
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
New Cumnock
Kirkconnel
KA18 4NW
Scotland
|
Site Name: |
Hare Hill Extension
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02463NWSC
|
Capacity: |
29750
|
Status: |
Live
|
Accreditation Date: |
2/10/1996
|
|
|
Commission Date: |
9/21/2016
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
New Cumnock
Kirkconnel
KA18 4NW
Scotland
|
|
Assumptions: Capacity: 29750kW 29.75 MW, Thus over the month Capacity * 720 hours per month = 21420 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 7205 | 24.22% | Issued | 01/02/2018 | | | 6648 | 22.35% | Issued | 01/01/2018 | | | 9257 | 31.12% | Issued | 01/12/2017 | | | 7699 | 25.88% | Issued | 01/11/2017 | | | 6428 | 21.61% | Issued | 01/10/2017 | | | 9345 | 31.41% | Issued | 01/09/2017 | | | 5989 | 20.13% | Issued | 01/08/2017 | | | 4913 | 16.51% | Issued | 01/07/2017 | | | 5554 | 18.67% | Issued | 01/06/2017 | | | 5521 | 18.56% | Issued |
|
Capacity: 104.4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 24 m/s (53.688 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|