Page views this IP this session = 1 of 10 unsubscribed pagesDrax Biomass Energy
Drax (Biomass , Active) Location in the UK : England, Selby, North Yorkshire Type of installation: Biomass on/offshore: on Turbines :3 Capacity : 585 MW Approx Date of 1st power generation:
/YES
Drax plans to convert three of its six generating units to run on sustainable biomass; the first unit was converted in the second quarter of 2013, and the second and third will be converted in April 2015, and at the earliest the fourth quarter of 2015, respectively. In the meantime, Drax will operate one of our coal units as an enhanced co-firing unit from May 2014; it is this unit that will be converted in April 2015.
(As a coal fired power station) Its generating capacity of 3,960 megawatts is the highest of any power station in the United Kingdom and Western Europe, providing about 7% of the United Kingdom's electricity supply.
I do not have any information on the MW output / capacity based on Biomass. Estimated as 585MW being one biomass unit.
Drax plans to spend as much as 700 million pounds ($1.13 billion) through 2017 upgrading its boilers at Selby, northern England, ordering millions of tons of biomass from around the world and building facilities to store the fuel, including four silos each bigger than London’s Royal Albert Hall, a 135-foot (41-meter) high concert venue with an 800-foot circumference.
The utility has hired farmers and foresters, designed special railway carriages and is investigating building wood pellet plants in North America, Thompson said.
Relationship |
Company (For:
Drax
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Drax Biomass Power Station - Unit 1 645 MW
|
Energy Type: |
Biomass (co-firing) |
County: |
North Yorkshire Country: England LPA: DECC (S36)
|
Site ID and Reference: |
174 / EN00567
District:
|
Applicant: |
Drax Power
Application :
|
(Go to search to find Application) |
Site Address: |
Near Selby in North Yorkshire
|
|
|
County: |
North Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
466650 / 466650
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2013
|
|
|
Generator Live |
7/30/2013
|
This Record Last Updated: |
6/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Drax Biomass Power Station - Unit 2 645 MW
|
Energy Type: |
Biomass (dedicated) |
County: |
North Yorkshire Country: England LPA: DECC (S36)
|
Site ID and Reference: |
192 / EN00567a
District:
|
Applicant: |
Drax Power
Application :
|
(Go to search to find Application) |
Site Address: |
Near Selby in North Yorkshire
|
|
|
County: |
North Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
466650 / 466650
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
5/30/2014
|
This Record Last Updated: |
6/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Drax Biomass Power Station - Unit 3 645 MW
|
Energy Type: |
Biomass (dedicated) |
County: |
North Yorkshire Country: England LPA: DECC (S36)
|
Site ID and Reference: |
175 / EN00567b
District:
|
Applicant: |
Drax Power
Application :
|
(Go to search to find Application) |
Site Address: |
Near Selby in North Yorkshire
|
|
|
County: |
North Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
466650 / 466650
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2017
|
|
|
Generator Live |
7/20/2017
|
This Record Last Updated: |
6/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Drax Biomass Power Station - Unit 4 645 MW
|
Energy Type: |
Biomass (dedicated) |
County: |
North Yorkshire Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
6659 /
District:
|
Applicant: |
Drax Power
Application :
|
(Go to search to find Application) |
Site Address: |
Near Selby in North Yorkshire
|
|
|
County: |
North Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
466650 / 466650
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/6/2018
|
|
|
Generator Live |
8/21/2018
|
This Record Last Updated: |
9/3/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Drax Power Station (RB) - A,C,E
|
Generator Type: |
Fuelled
|
Scheme : |
RO
|
Generator ID: |
R00083RAEN
|
Capacity: |
3237500
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
1/1/1974
|
|
|
Applicant: |
Drax Power Ltd
|
Applicant Address: |
Drax Power Station
Drax Power Limited
Selby
YO8 8PH
England
|
Address: |
Drax Power Station
Drax Power Ltd
Selby
YO8 8PH
England
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|