Loading
Page views this IP this session = 1 of 5 unsubscribed pagesWave
Wave (Wave , Active) Location in the UK : England, Offshore St Ives Type of installation: Wave on/offshore: on Turbines :0 Capacity : 20 MW Approx Date of 1st power generation: September 2010
/YES
Wave Hub is a grid-connected offshore facility in South West England for the large scale testing of technologies that generate electricity from the power of the waves. It holds a 25 year lease of 8 sq km of sea bed connected to the grid by a 11/33kv subsea cable. 10 miles off shore Hayle, Cornwall coast
Relationship |
Company (For:
Wave
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hayle Wave Hub (Test Site) 23 MW
|
Energy Type: |
Shoreline Wave |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2457 / A0184
District:
|
Applicant: |
Wave Hub
Application :
S36
|
(Go to search to find Application) |
Site Address: |
10 miles off shore Hayle, Cornwall coast
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
154466 / 154466
|
Development Status: |
Operational
|
Application Submitted: |
2/17/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/1/2010
|
|
|
Generator Live |
9/1/2010
|
This Record Last Updated: |
7/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|