Harlock Hill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Harlock Hill Wind Farm (Wind , Closed)

 General Information.

Location in the UK : England, Cumbria    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 2.5 MW
Approx Date of 1st power generation: January 1997

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Also see Furness WInd Farm
The first share offer in 1996/97 raised 1.2 million to buy two turbines at the Harlock Hill wind farm. In 1998/99 the second share offer raised a further 670,000 to buy one turbine at the Haverigg II wind farm site. Preference was shown for local investors, so that the community shares the economic benefits from their local wind farm. Around 40% of existing Baywind shareholders live either in Cumbria or North Lancashire with a wider number from the Northwest Region.

 Turbine Make and Specs

Model: Wind World W3700/500 Start Speed: 0
Capacity: 0.5 Optimal Speed: 0
Rotor Diameter: 37 Stop Speed: 0
Hub Height 40   Avg for all turbines: Avg. Elevation:
Web Page:
Comment:

 Address

Harlock Hill Pennington Ulverston LA12 7SA England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Harlock Hill )

 DECC Data on this Project: Harlock Hill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Harlock Hill Wind Farm     2.5 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: South Lakeland District Council
Site ID and Reference: 2617 / 07056W3     District:
Applicant: The Wind Company     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 0.5
Height of Turbines: Calculated capacity: 2.5
Site Address: Harlock Hill Wind Farm , Pennington , Near Ulverston , Cumbria
  LA12 0
County: Cumbria Region: North West
OS Coordinates: 325300 / 325300
Development Status: Operational
Application Submitted: 2/3/1995 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/1/1997 This Record Last Updated: 8/1/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Harlock Hill: Wind :

Site Name: Harlock Hill Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00395RQEN
Capacity: 4560 Status: Live
Accreditation Date: 2/3/1995    
Commission Date: 6/1/2016    
Applicant: High Winds Community Energy Society
Applicant Address: Energy 4 All Unit 26 Barrow-in-Furness LA14 2PN England
Address: Harlock Hill Pennington Near Ulverston LA12 7SB England

Site Name: Harlock Hill Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02943NWEN
Capacity: 4560 Status: Live
Accreditation Date: 2/3/1995    
Commission Date: 6/1/2016    
Applicant: High Winds Community Energy Society
Applicant Address: Energy 4 All Unit 26 Barrow-in-Furness LA14 2PN England
Address: Harlock Hill Pennington Near Ulverston LA12 7SB England
 
Assumptions: Capacity: 4560kW 4.56 MW,
Thus over the month Capacity * 720 hours per month = 3283.2 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 802 17.59% Issued
01/03/2018 1246 27.32% Issued
01/02/2018 983 21.56% Issued
01/01/2018 1680 36.84% Issued
01/12/2017 1216 26.67% Issued
01/11/2017 1151 25.24% Issued
01/10/2017 1584 34.74% Issued
01/09/2017 817 17.92% Issued
01/09/2017 26 0.57% Issued
01/08/2017 104 2.28% Issued
01/08/2017 631 13.84% Issued
01/07/2017 721 15.81% Issued
01/06/2017 755 16.56% Issued
01/05/2017 702 15.39% Issued
01/04/2017 834 18.29% Issued
01/03/2017 928 20.35% Redeemed
01/02/2017 1247 27.35% Redeemed
01/01/2017 879 19.28% Redeemed
Dec-16 0946 1052 23.07% Issued
Nov-16 0684 760 16.67% Issued
Oct-16 0666 740 16.23% Issued
Sep-16 0373 414 9.08% Issued
Aug-16 0357 397 8.71% Issued
Jul-16 0331 367 8.05% Issued
Jun-16 095 108 2.37% Issued

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351157

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School