Loading
Page views this IP this session = 1 of 10 unsubscribed pagesEdinbane Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Edinbane Wind Farm (Wind , Active) Location in the UK : Scotland, Skye Type of installation: Wind on/offshore: on Turbines :18 Capacity : 41.4 MW Approx Date of 1st power generation: June 2010
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
•The Edinbane wind farm consists of 18 Enercon 2.3 MW wind turbines, with a maximum tip height of 100 metres.
•The substation has been constructed on site by Scottish and Southern Energy.
•Preliminary construction commenced in early 2008, whilst main site works commenced during August 2008.
•Wind turbines started to arrive during late summer 2009 and construction completed during June 2010.
•Vattenfall expects this 41.4 MW development to generate more than 128 gigawatt hours of green electricity every year.
Model: |
Enercon E70
|
Start Speed: |
4
|
Capacity: |
2.3
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
71
|
Stop Speed: |
31
|
Hub Height |
50 Avg for all turbines:50
|
Avg. Elevation: |
159
|
Web Page: |
http://www.enercon.de/en-en/61.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
Edinbane Wind Farm Glen Vic Askil Struan IV56 8FH
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Edinbane Wind Farm 41.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
4674 / A0004
District:
|
Applicant: |
Vattenfall
Application :
02/00089/FULSL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
41.4 |
Site Address: |
Cruachan Brinn Mhicaskill, Edinbane, Portree, Highlands
|
|
IV51 9PW
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
134353 / 134353
|
Development Status: |
Operational
|
Application Submitted: |
2/28/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2008
|
|
|
Generator Live |
6/21/2010
|
This Record Last Updated: |
12/2/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 82.7999999999999 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/4/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|