Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHaverigg Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Haverigg Wind Farm (Wind , Active) Location in the UK : England, Cumbria Type of installation: Wind on/offshore: on Turbines :4 Capacity : 5.8 MW Approx Date of 1st power generation: December 2004
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
NB Haverigg III is also referred to as Heverigg 3 and 4.
Haverigg III is a replacement of the turbines installed under Haverigg I
Acting for owners Windcluster Ltd, Wind Prospect secured planning permission in August 2002 to replace five 10 year old Vestas V27-225kW turbines with four Vestas V52-850 kW machines. This will substantially increase the power generated from this well-accepted site near Millom in south Cumbria.
Haverigg II is an extension to one of the first co-operatively owned wind power developments in the UK. The site is located on a disused airfield on low lying coastal land near Millom in Cumbria.
Haverigg I The first phase (now known as Haverigg I) was developed by Windcluster Ltd., consisting of five 225kW V27 wind turbines and commissioned in 1992.
Model: |
Vestas V52-850
|
Start Speed: |
2.5
|
Capacity: |
0.85
|
Optimal Speed: |
6.5
|
Rotor Diameter: |
52
|
Stop Speed: |
12
|
Hub Height |
40 Avg for all turbines:47
|
Avg. Elevation: |
12
|
Web Page: |
http://www.nrg-http://www.nrg-systems.hu/dok/V52_UK.pdf |
Comment: |
|
Haverigg Wincluster Haverigg Airfield Hemplands LA18 4JB England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Haverigg Repowering (Haverigg II) 1.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Copeland Borough Council
|
Site ID and Reference: |
3614 / N00001W
District:
|
Applicant: |
Windprospect
Application :
4/02/0505/0
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
0.22 |
Height of Turbines: |
|
Calculated capacity: |
1.1 |
Site Address: |
Kirksanton Airfield Part of Hemplands Farm Haverigg Millom Cumbria
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
313700 / 313700
|
Development Status: |
Operational
|
Application Submitted: |
4/29/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
5/1/2004
|
This Record Last Updated: |
4/11/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Haverigg Extension Wind Farm 2.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Copeland Borough Council
|
Site ID and Reference: |
2626 / 07129W3
District:
|
Applicant: |
The Wind Company
Application :
4/91/0463/0
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
0.59999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.4 |
Site Address: |
Kirksanton Airfield
Part of Hemplands Farm
Haverigg
Millom
Cumbria
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
313700 / 313700
|
Development Status: |
Operational
|
Application Submitted: |
5/29/1991
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
7/1/1998
|
This Record Last Updated: |
4/11/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Haverigg 3 Windcluster
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00143RQEN
|
Capacity: |
1700
|
Status: |
Live
|
Accreditation Date: |
5/29/1991
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Windcluster 2000 Ltd
|
Applicant Address: |
Kings House
Orchard Street
Bristol
BS1 5EH
England
|
Address: |
Haverigg 3 Windcluster
Haverigg WinclusterHaverigg AirfieldHemplands
LA18 4JB
England
|
Site Name: |
Haverigg 4 Windcluster
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00144RQEN
|
Capacity: |
1700
|
Status: |
Live
|
Accreditation Date: |
5/29/1991
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Windcluster 2000 Ltd
|
Applicant Address: |
Kings House
Orchard Street
Bristol
BS1 5EH
England
|
Address: |
Haverigg 4 Windcluster
Haverigg WinclusterHaverigg AirfieldHemplands
LA18 4JB
England
|
Site Name: |
Haverigg 3 Windcluster
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00808NWEN
|
Capacity: |
1700
|
Status: |
Live
|
Accreditation Date: |
5/29/1991
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Windcluster 2000 Ltd
|
Applicant Address: |
Kings House
Orchard Street
Bristol
BS1 5EH
England
|
Address: |
Haverigg 3 Windcluster
Haverigg WinclusterHaverigg AirfieldHemplands
LA18 4JB
England
|
|
Assumptions: Capacity: 1700kW 1.7 MW, Thus over the month Capacity * 720 hours per month = 1224 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 268 | 15.76% | Issued | 01/03/2018 | | | 432 | 25.41% | Issued | 01/02/2018 | | | 404 | 23.76% | Issued | 01/01/2018 | | | 695 | 40.88% | Issued | 01/12/2017 | | | 504 | 29.65% | Issued | 01/11/2017 | | | 554 | 32.59% | Issued | 01/10/2017 | | | 642 | 37.76% | Issued | 01/09/2017 | | | 408 | 24.00% | Issued | 01/09/2017 | | | 14 | 0.82% | Revoked | 01/08/2017 | | | 402 | 23.65% | Issued | 01/07/2017 | | | 394 | 23.18% | Issued | 01/06/2017 | | | 413 | 24.29% | Issued | 01/05/2017 | | | 279 | 16.41% | Issued | 01/04/2017 | | | 424 | 24.94% | Issued | 01/03/2017 | | | 439 | 25.82% | Redeemed | 01/02/2017 | | | 514 | 30.24% | Redeemed | 01/01/2017 | | | 346 | 20.35% | Redeemed | Dec-16 | 0 | 458 | 458 | 26.94% | Issued | Nov-16 | 0 | 291 | 292 | 17.18% | Issued | Oct-16 | 0 | 320 | 320 | 18.82% | Issued | Sep-16 | 0 | 455 | 455 | 26.76% | Issued | Aug-16 | 0 | 449 | 449 | 26.41% | Issued | Jul-16 | 0 | 386 | 386 | 22.71% | Issued | Jul-16 | 0 | 386 | 386 | 22.71% | Issued | Jun-16 | 0 | 154 | 156 | 9.18% | Issued | Jun-16 | 0 | 154 | 156 | 9.18% | Issued | May-16 | 0 | 312 | 312 | 18.35% | Issued | Apr-16 | 0 | 370 | 370 | 21.76% | Issued | Mar-16 | 0 | 282 | 282 | 16.59% | Redeemed | Feb-16 | 0 | 534 | 534 | 31.41% | Redeemed | Dec-15 | 0 | 850 | 765 | 45.00% | Redeemed | Nov-15 | 0 | 720 | 720 | 42.35% | Redeemed | Oct-15 | 0 | 266 | 268 | 15.76% | Redeemed | Sep-15 | 0 | 264 | 264 | 15.53% | Redeemed | Aug-15 | 0 | 367 | 367 | 21.59% | Redeemed | Jul-15 | 390 | 389 | 389 | 22.88% | Redeemed | Jun-15 | 319 | 321 | 321 | 18.88% | Redeemed | May-15 | 622 | 622 | 622 | 36.59% | Redeemed | Apr-15 | 343 | 343 | 343 | 20.18% | Redeemed | Mar-15 | 594 | 594 | 594 | 34.94% | Redeemed | Feb-15 | 447 | 448 | 448 | 26.35% | Redeemed | Jan-15 | 792 | 792 | 792 | 46.59% | Redeemed | Dec-14 | 703 | 703 | 703 | 41.35% | Redeemed | Nov-14 | 397 | 396 | 396 | 23.29% | Redeemed | Oct-14 | 640 | 640 | 640 | 37.65% | Redeemed | Sep-14 | 155 | 156 | 156 | 9.18% | Redeemed | Aug-14 | 555 | 554 | 554 | 32.59% | Redeemed | Jul-14 | 271 | 271 | 271 | 15.94% | Redeemed | Jun-14 | 140 | 140 | 140 | 8.24% | Redeemed | May-14 | 281 | 281 | 281 | 16.53% | Redeemed | Apr-14 | 392 | 392 | 392 | 23.06% | Redeemed | Mar-14 | 509 | 509 | 509 | 29.94% | Redeemed | Feb-14 | 598 | 598 | 598 | 35.18% | Redeemed | Jan-14 | 626 | 626 | 626 | 36.82% | Redeemed | Dec-13 | 758 | 758 | 758 | 44.59% | Redeemed | Nov-13 | 400 | 400 | 1 | 0.06% | Redeemed | Oct-13 | 424 | 424 | 424 | 24.94% | Redeemed | Sep-13 | 405 | 405 | 405 | 23.82% | Redeemed | Aug-13 | 450 | 450 | 450 | 26.47% | Redeemed | Jul-13 | 173 | 173 | 173 | 10.18% | Redeemed | Jun-13 | 256 | 255 | 255 | 15.00% | Redeemed | May-13 | 497 | 498 | 498 | 29.29% | Redeemed | Apr-13 | 486 | 486 | 486 | 28.59% | Redeemed | Mar-13 | 300 | 300 | 300 | 17.65% | Redeemed | Feb-13 | 345 | 345 | 345 | 20.29% | Redeemed | Jan-13 | 459 | 460 | 460 | 27.06% | Redeemed | Dec-12 | 538 | 537 | 537 | 31.59% | Redeemed | Nov-12 | 468 | 469 | 469 | 27.59% | Redeemed | Oct-12 | 403 | 403 | 403 | 23.71% | Redeemed | Sep-12 | 608 | 607 | 607 | 35.71% | Redeemed | Aug-12 | 293 | 293 | 293 | 17.24% | Redeemed | Jul-12 | 325 | 325 | 325 | 19.12% | Redeemed | Jun-12 | 183 | 183 | 183 | 10.76% | Redeemed | May-12 | 324 | 325 | 325 | 19.12% | Redeemed | Apr-12 | 362 | 362 | 1 | 0.06% | Revoked | Mar-12 | 300 | 301 | 301 | 17.71% | Redeemed | Feb-12 | 382 | 382 | 382 | 22.47% | Redeemed | Jan-12 | 634 | 634 | 634 | 37.29% | Redeemed | Dec-11 | 871 | 871 | 871 | 51.24% | Redeemed | Nov-11 | 558 | 558 | 558 | 32.82% | Redeemed | Oct-11 | 617 | 616 | 616 | 36.24% | Redeemed | Sep-11 | 556 | 556 | 556 | 32.71% | Redeemed | Aug-11 | 369 | 369 | 369 | 21.71% | Redeemed | Jul-11 | 233 | 233 | 233 | 13.71% | Redeemed | Jun-11 | 327 | 327 | 327 | 19.24% | Redeemed | May-11 | 696 | 697 | 697 | 41.00% | Redeemed | Apr-11 | 358 | 357 | 357 | 21.00% | Redeemed | Mar-11 | 237 | 238 | 238 | 14.00% | Redeemed | Feb-11 | 410 | 410 | 410 | 24.12% | Redeemed | Jan-11 | 339 | 339 | 339 | 19.94% | Redeemed | Dec-10 | 79 | 79 | 79 | 4.65% | Redeemed | Nov-10 | 329 | 328 | 328 | 19.29% | Redeemed |
|
Capacity: 11.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 16 m/s (35.792 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|