Inverlael (Hydro , Active) Location in the UK : Scotland, Loch Broom, Wester Ross Type of installation: Hydro on/offshore: on Turbines :0 Capacity : 2.5 MW Approx Date of 1st power generation: May 2009
/YES
The Inverlael Hydroelectric Scheme is 2.5 megawatt (MW) run-of-river development built within existing forestry plantation by Loch Broom near Wester Ross in the North West Highlands of Scotland.
The scheme utilises the waters of the Allt Mor and River Lael. An intake in each river abstracts water and passes it through two pipes which combine before entering the powerhouse. The abstracted water is then fed through twin Francis turbines, generating up to 2.5MW of electricity before being returned to the watercourse. Inverlael Hydropower Station inverlael Ullapool IV23 2RG Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Inverlael Hydro 2.5 MW
|
Energy Type: |
Small Hydro |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
426 / N00023H
District:
|
Applicant: |
RWE npower
Application :
05/00206/FULRC
|
(Go to search to find Application) |
Site Address: |
Loch Broom
Near Ullapool
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
218650 / 218650
|
Development Status: |
Operational
|
Application Submitted: |
3/14/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/1/2008
|
|
|
Generator Live |
8/5/2009
|
This Record Last Updated: |
11/23/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Inverlael Hydro Electric Generating Station
|
Generator Type: |
Hydro 20MW DNC or less (ROS code = SE)
|
Scheme : |
RO
|
Generator ID: |
R00138SESC
|
Capacity: |
2500
|
Status: |
Live
|
Accreditation Date: |
3/14/2005
|
|
|
Commission Date: |
5/22/2009
|
|
|
Applicant: |
Innogy Renewables UK Limited (Hydro)
|
Applicant Address: |
Innogy Renewables UK Ltd
Dolgarrog Power Station
Dolgarrog
CONWY
LL32 8QE
Wales
|
Address: |
Inverlael Hydropower Station
inverlael
Ullapool
IV23 2RG
Scotland
|
Site Name: |
Inverlael Hydro Electric Generating Station
|
Generator Type: |
Hydro
|
Scheme : |
REGO
|
Generator ID: |
G01475HYSC
|
Capacity: |
2500
|
Status: |
Live
|
Accreditation Date: |
3/14/2005
|
|
|
Commission Date: |
5/22/2009
|
|
|
Applicant: |
Innogy Renewables UK Limited (Hydro)
|
Applicant Address: |
Innogy Renewables UK Ltd
Dolgarrog Power Station
Dolgarrog
CONWY
LL32 8QE
Wales
|
Address: |
Inverlael Hydropower Station
inverlael
Ullapool
IV23 2RG
Scotland
|
|
Assumptions: Capacity: 2500kW 2.5 MW, Thus over the month Capacity * 720 hours per month = 1800 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 441 | 17.64% | Issued | 01/02/2018 | | | 279 | 11.16% | Issued | 01/01/2018 | | | 545 | 21.80% | Issued | 01/12/2017 | | | 868 | 34.72% | Issued | 01/11/2017 | | | 833 | 33.32% | Issued | 01/10/2017 | | | 790 | 31.60% | Issued | 01/09/2017 | | | 434 | 17.36% | Issued | 01/08/2017 | | | 386 | 15.44% | Issued | 01/07/2017 | | | 212 | 8.48% | Issued | 01/06/2017 | | | 308 | 12.32% | Issued | 01/05/2017 | | | 3 | 0.12% | Issued | 01/04/2017 | | | 432 | 17.28% | Issued | 01/03/2017 | | | 393 | 15.72% | Redeemed | 01/02/2017 | | | 224 | 8.96% | Redeemed | 01/01/2017 | | | 527 | 21.08% | Redeemed | Dec-16 | 0 | 348 | 348 | 13.92% | Issued | Nov-16 | 0 | 583 | 583 | 23.32% | Issued | Oct-16 | 0 | 137 | 139 | 5.56% | Issued | Sep-16 | 0 | 157 | 159 | 6.36% | Issued | Aug-16 | 0 | 440 | 440 | 17.60% | Issued | Jul-16 | 0 | 655 | 655 | 26.20% | Issued | Jun-16 | 0 | 33 | 35 | 1.40% | Issued | May-16 | 0 | 240 | 241 | 9.64% | Issued | Apr-16 | 0 | 70 | 72 | 2.88% | Issued | Feb-16 | 0 | 351 | 351 | 14.04% | Redeemed | Jan-16 | 0 | 545 | 545 | 21.80% | Redeemed | Dec-15 | 0 | 980 | 980 | 39.20% | Retired | Nov-15 | 0 | 777 | 777 | 31.08% | Retired | Oct-15 | 0 | 120 | 122 | 4.88% | Retired | Sep-15 | 0 | 276 | 277 | 11.08% | Retired | Aug-15 | 0 | 162 | 163 | 6.52% | Retired | Jul-15 | 238 | 236 | 238 | 9.52% | Expired | Jun-15 | 353 | 354 | 354 | 14.16% | Expired | May-15 | 659 | 658 | 658 | 26.32% | Expired | Apr-15 | 469 | 469 | 469 | 18.76% | Expired | Mar-15 | 656 | 656 | 656 | 26.24% | Expired | Feb-15 | 650 | 649 | 649 | 25.96% | Redeemed | Jan-15 | 773 | 774 | 774 | 30.96% | Redeemed | Dec-14 | 680 | 679 | 679 | 27.16% | Redeemed | Nov-14 | 237 | 236 | 238 | 9.52% | Redeemed | Oct-14 | 617 | 617 | 617 | 24.68% | Redeemed | Sep-14 | 43 | 41 | 43 | 1.72% | Redeemed | Aug-14 | 587 | 587 | 587 | 23.48% | Redeemed | Jul-14 | 42 | 40 | 42 | 1.68% | Redeemed | Jun-14 | 225 | 224 | 225 | 9.00% | Redeemed | May-14 | 310 | 310 | 310 | 12.40% | Redeemed | Apr-14 | 260 | 258 | 260 | 10.40% | Redeemed | Mar-14 | 629 | 629 | 629 | 25.16% | Expired | Feb-14 | 544 | 544 | 544 | 21.76% | Expired | Jan-14 | 459 | 459 | 459 | 18.36% | Redeemed | Dec-13 | 961 | 961 | 1 | 0.04% | Expired | Nov-13 | 789 | 789 | 789 | 31.56% | Redeemed | Oct-13 | 401 | 401 | 401 | 16.04% | Redeemed | Sep-13 | 440 | 440 | 440 | 17.60% | Redeemed | Aug-13 | 206 | 204 | 206 | 8.24% | Redeemed | Jul-13 | 62 | 60 | 62 | 2.48% | Redeemed | Jun-13 | 149 | 147 | 149 | 5.96% | Redeemed | May-13 | 695 | 695 | 695 | 27.80% | Redeemed | Apr-13 | 518 | 518 | 518 | 20.72% | Redeemed | Mar-13 | 83 | 82 | 83 | 3.32% | Redeemed | Feb-13 | 421 | 422 | 422 | 16.88% | Redeemed | Jan-13 | 410 | 409 | 409 | 16.36% | Redeemed | Dec-12 | 565 | 566 | 566 | 22.64% | Redeemed | Nov-12 | 581 | 580 | 580 | 23.20% | Redeemed | Oct-12 | 548 | 549 | 549 | 21.96% | Redeemed | Sep-12 | 702 | 701 | 701 | 28.04% | Redeemed | Aug-12 | 146 | 145 | 146 | 5.84% | Redeemed | Jul-12 | 232 | 230 | 231 | 9.24% | Redeemed | Jun-12 | 73 | 72 | 74 | 2.96% | Redeemed | May-12 | 185 | 183 | 185 | 7.40% | Redeemed | Apr-12 | 536 | 536 | 536 | 21.44% | Redeemed | Mar-12 | 157 | 155 | 157 | 6.28% | Redeemed | Feb-12 | 524 | 524 | 524 | 20.96% | Redeemed | Jan-12 | 378 | 378 | 378 | 15.12% | Redeemed | Dec-11 | 877 | 877 | 877 | 35.08% | Redeemed | Nov-11 | 311 | 311 | 311 | 12.44% | Redeemed | Oct-11 | 595 | 595 | 595 | 23.80% | Redeemed | Sep-11 | 656 | 655 | 655 | 26.20% | Redeemed | Aug-11 | 454 | 454 | 281 | 11.24% | Redeemed | Jul-11 | 173 | 171 | 173 | 6.92% | Redeemed | Jun-11 | 197 | 195 | 197 | 7.88% | Redeemed | May-11 | 529 | 529 | 529 | 21.16% | Redeemed | Apr-11 | 244 | 241 | 244 | 9.76% | Redeemed | Mar-11 | 309 | 305 | 309 | 12.36% | Redeemed | Feb-11 | 380 | 378 | 380 | 15.20% | Redeemed | Jan-11 | 497 | 494 | 497 | 19.88% | Redeemed | Dec-10 | 177 | 171 | 177 | 7.08% | Redeemed | Nov-10 | 220 | 216 | 221 | 8.84% | Redeemed | Oct-10 | 348 | 345 | 348 | 13.92% | Redeemed |
|
Project Info |
INVERLAEL INVERLAEL is a run of river hydroelectric scheme, which is located within the Lael Forest at the South end of Loch Broom, 10 miles from Ullapool in Wester Ross, Scotland.
RWE Innogy INVERLAEL
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|