Sorry I found no matches, Please try again. 176
vid = 2074pws_id = 350523pws_id = 350523
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.118.162.8 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

The Hollies Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

The Hollies Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, burgh le marsh, lincolnshire    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 2.6 MW
Approx Date of 1st power generation: July 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Now fully operational both turbines produce enough green energy to meet the equivalent annual electricity needs of some 1,300 homes each year. With a tip height of 91 metres, the turbines are capable of generating 1.3 megawatts each giving the site a maximum combined power of up to 2.6 megawatts.

 Turbine Make and Specs

Model: Nordex N60/1300 Start Speed: 4.5
Capacity: 1.3 Optimal Speed: 10
Rotor Diameter: 60 Stop Speed: 25
Hub Height 0   Avg for all turbines:60 Avg. Elevation: 3
Web Page: http://www.nordex-online.com/fileadmin/MEDIA/Produktinfos/EN/Nordex_N60_EN.pdf
Comment:

 Address

The Hollies Wind FarmHigh LaneCroft PE24 4SH England

 Associated Companies.

Relationship Company (For: The Hollies )
DeveloperRWE Innogy
OwnerRWE Innogy
OperatorRWE Innogy

 DECC Data on this Project: The Hollies :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: The Hollies     2.6 MW
Energy Type: Wind Onshore
County: Lincolnshire     Country: England     LPA: East Lindsey District Council
Site ID and Reference: 3186 / N00179W     District:
Applicant: National Wind Power     Application : S/039/711/02 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 2.6
Site Address: The Hollies High Lane Croft Skegness pe24 4sh
 
County: Lincolnshire Region: East Midlands
OS Coordinates: 549995 / 549995
Development Status: Operational
Application Submitted: 7/2/2002 Planning Permission Granted
Application Determined: Permission refused: 10/29/2004
Construction Date: 9/1/2007    
Generator Live 1/1/2008 This Record Last Updated: 1/6/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 10/29/2004

 OFGEM Data on this Project: The Hollies: Wind : -na-

 Calculations


Capacity: 5.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350523

Project Info
RWE Innogy

Lightsource purchases 12.5MW of projects from juwi Renewable Energies
The two solar farms included in the deal are: Ninnis Solar Farm (3.88MW) located in Cornwall and THE HOLLIES (8.61MW) located in Lincolnshire.

juwi submits a planning application to build a solar PV park near Skegness
Birmingham, 09 July, 2012. THE HOLLIES Solar Park will be about 10MW comprising 875 photovoltaic (PV) solar arrays in an area of about 21 hectares (55 acres), and uses just under 42,000 panels.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School