Sorry I found no matches, Please try again. 176
vid = 2075pws_id = 350973pws_id = 350973 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.129.195.254 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Maentwrog

Maentwrog (Hydro , Active)

 General Information.

Location in the UK : Wales, Trawsfynydd reservoir , Gwynedd    
Type of installation: Hydro    on/offshore: on
Turbines :4  Capacity : 33 MW
Approx Date of 1st power generation:

/YES

 Comment

It originally had an 18 megawatt output from three turbines but a fourth was added in 1934, increasing its output to 24 megawatts. It was replanted in 1991 further increasing capacity to 30 megawatts, and is currently operated by Magnox Limited Ltd.

Trawsfynydd reservoir was formed by the construction of four dams. The principal dam, built cross the Afon Prysor (at the northern end of the lake), was the first large arch dam ever built in Britain. The lake covered an area of two square miles and contains over 33 million cubic metres of water.

 Address

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Maentwrog )

 DECC Data on this Project: Maentwrog :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Maentwrog: Hydro :

Project Info
MAENTWROG Hydroelectric Power Station

2012: MAENTWROG Hydroelectric Power Station in rainfall boost
The Met Office has said this April and June was the wettest second quarter in the UK since records began in 1910. And during the rain MAENTWROG Hydroelectric Power Station worked overtime using the extra water to generate extra electricity.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School