Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCantelupe Solar Farm
Cantelupe Solar Farm (Solar , Active) Location in the UK : England, Haslingfield, Cambridgeshire Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 4.4 MW Acreage:28 or approx Hectares : 11.2 Approx Date of 1st power generation: February 2013
/YES
Cantelupe Farm sees the final stages of construction to a 28 acre (17 hectare) solar farm in 2012. On Green Belt Land (see Bloombridge Dev Ptnrs).
Casestudy and photo on Belectric site.
Alectron Investments Ltd (not Belectric?).
Commissioned in 2013 after a Construction Period of just 7 Weeks Cantelupe Solar Farm Trumpington Estate Cantelupe Road Haslingfield CB23 1LY England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Cantelupe Solar Farm 5 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Cambridgeshire Country: England LPA: South Cambridgeshire District Council
|
Site ID and Reference: |
1034 / AA232
District:
|
Applicant: |
Innogy (previously - Belectric (previously Alectron Investments Ltd))
Application :
S/0154/11
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land to West of Cantelupe Road, Cantelupe Farm, Haslingfield, Cambridgeshire
|
|
|
County: |
Cambridgeshire Region: Eastern
|
OS Coordinates: |
541469 / 541469
|
Development Status: |
Operational
|
Application Submitted: |
1/28/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/1/2012
|
|
|
Generator Live |
2/28/2013
|
This Record Last Updated: |
2/2/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Cantelupe Solar Farm
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00075RUEN
|
Capacity: |
4400
|
Status: |
Live
|
Accreditation Date: |
1/28/2011
|
|
|
Commission Date: |
2/21/2013
|
|
|
Applicant: |
McEwan Solar Holdco (1) Limited
|
Applicant Address: |
5th Floor
20 St James's Street
London
SW1A 1ES
England
|
Address: |
Cantelupe Solar Farm
Trumpington Estate
Cantelupe Road
Haslingfield
CB23 1LY
England
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|