Old rides Solar Farm

Old rides Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, sheppy    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 8 MW
Acreage:40   or approx Hectares : 16
Approx Date of 1st power generation: January 2014

/YES

 Comment

see vogt website

 Address

Old Rides Farm Eastchurch ME12 4BD England

 Associated Companies.

Relationship Company (For: Old rides )
ContractorG2 Energy
Developervogt solar ltd (sic)
Operatorvogt solar ltd (sic)

 DECC Data on this Project: Old rides :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Old Rides solar Farm     8 MW
Energy Type: Solar Photovoltaics
County: Kent     Country: England     LPA: Swale Borough Council
Site ID and Reference: 1727 / IF1131     District:
Applicant: Sunsave 9 (Old Rides) Ltd/ Vogt solar     Application : SW/12/1448 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Old Rides Farm, Leysdown Road, Eastchurch, Sheerness, Kent, ME12 4BD
 
County: Kent Region: South East
OS Coordinates: 599732 / 599732
Development Status: Operational
Application Submitted: 11/28/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2013    
Generator Live 1/15/2014 This Record Last Updated: 3/26/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Old rides: Solar :

Site Name: Old Rides Solar Farm
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00226RUEN
Capacity: 5985 Status: Live
Accreditation Date: 11/28/2012    
Commission Date: 1/23/2014    
Applicant: Old Rides Solar Ltd
Applicant Address: 14 High Cross c/o Murrell Ashowrth Associates Truro TR1 2AJ England
Address: Old Rides Farm Eastchurch ME12 4BD England

Site Name: Old Rides Solar Farm
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G05328PVEN
Capacity: 5985 Status: Live
Accreditation Date: 11/28/2012    
Commission Date: 1/23/2014    
Applicant: Old Rides Solar Ltd
Applicant Address: 14 High Cross c/o Murrell Ashowrth Associates Truro TR1 2AJ England
Address: Old Rides Farm Eastchurch ME12 4BD England
 
Assumptions: Capacity: 5985kW 5.985 MW,
Thus over the month Capacity * 720 hours per month = 4309.2 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 517 8.64% Issued
01/02/2018 479 8.00% Issued
01/01/2018 198 3.31% Issued
01/12/2017 148 2.47% Issued
01/11/2017 332 5.55% Issued
01/10/2017 514 8.59% Issued
01/09/2017 788 13.17% Issued
01/08/2017 963 16.09% Issued
01/07/2017 1007 16.83% Issued
01/06/2017 1105 18.46% Issued
01/05/2017 1037 17.33% Issued
01/04/2017 1050 17.54% Issued
01/03/2017 774 12.93% Issued
01/02/2017 331 5.53% Issued
01/01/2017 262 4.38% Issued
Dec-16 0298 193 3.22% Issued
Nov-16 0479 305 5.10% Issued
Oct-16 0979 617 10.31% Issued
Sep-16 01124 707 11.81% Issued
Aug-16 01564 978 16.34% Issued
Jul-16 0652 410 6.85% Issued
Jul-16 0652 410 6.85% Issued
Jun-16 01464 915 15.29% Issued
May-16 01878 1174 19.62% Issued
Apr-16 01572 983 16.42% Issued
Mar-16 01156 727 12.15% Redeemed
Feb-16 0691 437 7.30% Redeemed
Jan-16 0398 255 4.26% Redeemed
Dec-15 0230 150 2.51% Redeemed
Nov-15 0325 209 3.49% Redeemed
Oct-15 0822 519 8.67% Redeemed
Sep-15 01408 880 14.70% Redeemed
Aug-15 01421 888 14.84% Redeemed
Jul-15 10171626 1017 16.99% Redeemed
Jun-15 12221955 1222 20.42% Redeemed
May-15 11311810 1131 18.90% Redeemed
Apr-15 11141782 1114 18.61% Redeemed
Mar-15 8211306 821 13.72% Redeemed
Feb-15 445705 446 7.45% Redeemed
Jan-15 239371 238 3.98% Redeemed
Dec-14 209325 209 3.49% Redeemed
Nov-14 274430 274 4.58% Redeemed
Oct-14 548868 548 9.16% Redeemed
Sep-14 8151297 815 13.62% Redeemed
Aug-14 9531525 953 15.92% Redeemed
Jul-14 11421827 1142 19.08% Redeemed
Jun-14 11691871 1169 19.53% Redeemed
May-14 11011761 1100 18.38% Redeemed
Apr-14 9791567 979 16.36% Redeemed
Mar-14 6541039 654 10.93% Redeemed
Feb-14 478756 478 7.99% Redeemed
Jan-14 4972 50 0.84% Redeemed

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School