ONDBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 3628718142 between ipint_start and ipint_end
Sorry I found no matches, Please try again. 176
DBUG:SQL Command = select top 1 * from [energymaplocs].[dbo].[vhost_user] where 3628718142 between ipint_start and ipint_end
DEBUG: sql = insert into [energymaplocs].dbo.visitor (visitorip, visitorint, vREMOTE_HOST,visitdate, visitpage, getdatevisit, visitproject, visitorindustryid, [host_id]) values ('216.73.216.62', '3628718142', '216.73.216.62' ,'20251018 19:30:54','/project.asp?pageid=212&pagename=Hill+of+Balquhindachy+Wind+Farm' ,getdate() ,212 , 0, 1)
winddate 1 =
vid = 212select top 1 * from [energymaplocs].[dbo].vmain where id=212
pws_id = 351716pws_id = 351716
--------------------------------------------------------
Loading
Page views this IP this session = 2 of 10 unsubscribed pagesHill of Balquhindachy Wind Farm Click here for Generation Forecast for wind farms based on Met office data
Hill of Balquhindachy Wind Farm (Wind , Active) DEBUG comment: caniedit 2 = public DEBUG comment SQL: select * from [energymaplocs].[dbo].vmycomment where main_id=212 and typeofcomment <> 'delete' and ( added_by = 0 or typeofcomment = 'public' ) Wind Farm developed in 2 stages. 1st stage with 1 wind turbine, 2nd stage added a further 2 turbines. (2008) Greenspan Electrics wind turbine at Hill of Balquhindachy has been operational for a year. The Vestas 850 kW turbine generated over 2,500 MWh of green electricity over the twelve months, all of which was bought by Marks and Spencer plc to offset the power used in their Eco-store in Pollok. Over the course of the year, the turbine has offset over 2,000 tonnes of CO2 that would have been emitted by a conventional power station generating the same amount of electricity. DEBUG generator SQL: select * from [energymaplocs].[dbo].technology where tech_id=7
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted. got here Got here pop 2 projectid = 212 vdeccref = -na- DEBUG decclib sql = select *, [Installed Capacity (Elec)] as installed_capacity, [Contractor (/Applicant)] as contractor from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'DECC' and dop_project = '212' order by [planning application submitted] desc
DEBUG Ofgemlib sql = select * from energymaplocs.dbo.ofgem1 where GeneratorID = '-na-' Capacity: 5.1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph) Local Weather Station: Elevation of Weather Station: Date for Wind forecast: 10/18/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
|