Page views this IP this session = 1 of 10 unsubscribed pagesHill of Easterton Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Hill of Easterton Wind Farm (Wind , Active) Location in the UK : Scotland, Aberdeenshire Type of installation: Wind on/offshore: on Turbines :3 Capacity : 2.5 MW Approx Date of 1st power generation: July 2007
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Mackies Dairy
Ice cream manufacturers Mackie's of Scotland have their own energy supply - three Vestas V52 wind turbines - referred to as "Mackie's", "Ice" and "Cream". Each of these graceful machines have a 45 metre turbine and three 25 metre blades on the turning propeller and capacity to produce 850KW of power - so a total capacity at the farm of 2.5 MW.
Wind turbines are not a new sight on the farm, Mac's father Maitland previously installed a smaller turbine which powered the business's former piggery unit until 1997. That was one of the first grid connected wind turbines in the UK but did not have a very large output.
Model: |
Vestas V52-850
|
Start Speed: |
2.5
|
Capacity: |
0.85
|
Optimal Speed: |
6.5
|
Rotor Diameter: |
52
|
Stop Speed: |
12
|
Hub Height |
45 Avg for all turbines:45
|
Avg. Elevation: |
222
|
Web Page: |
http://www.nrg-http://www.nrg-systems.hu/dok/V52_UK.pdf |
Comment: |
|
Mackies Hill of Easterton Wind Turbine - D Hill of Easterton Scotland
Relationship |
Company (For:
Hill of Easterton
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hill of Easterton Extension 2 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3812 / AA420
District:
|
Applicant: |
Mackies Limited
Application :
APP/2011/2120
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.3 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
375650 / 375650
|
Development Status: |
Planning Permission Refused
|
Application Submitted: |
6/15/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/24/2012
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
1/25/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/24/2012 |
Site Name: |
Hill of Easterton Extension 2 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
4056 / N00419W
District:
|
Applicant: |
Mackies
Application :
APP/2005/3308
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
1 |
Height of Turbines: |
|
Calculated capacity: |
2 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
376449 / 376449
|
Development Status: |
Operational
|
Application Submitted: |
9/28/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
7/31/2007
|
This Record Last Updated: |
10/8/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hill of Easterton 2.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3532 / EN00082
District:
|
Applicant: |
Mackies
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
2.5 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
376449 / 376449
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/2005
|
This Record Last Updated: |
10/1/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Mackies Hill of Easterton Wind Turbine - D
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00054SQSC
|
Capacity: |
2550
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
1/1/2005
|
|
|
Applicant: |
Mackies Limited
|
Applicant Address: |
Mackies Of Scotland
Westertown
Rothienorman
Inverurie
AB51 8US
Scotland
|
Address: |
Mackies Hill of Easterton Wind Turbine - D
Hill of EastertonScotland
Scotland
|
Site Name: |
Mackies Hill of Easterton Wind Turbine - D
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00267NWSC
|
Capacity: |
2550
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
1/1/2005
|
|
|
Applicant: |
Mackies Limited
|
Applicant Address: |
Mackies Of Scotland
Westertown
Rothienorman
Inverurie
AB51 8US
Scotland
|
Address: |
Mackies Hill of Easterton Wind Turbine - D
Hill of EastertonScotland
Scotland
|
|
Assumptions: Capacity: 2550kW 2.55 MW, Thus over the month Capacity * 720 hours per month = 1836 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 468 | 18.35% | Issued | 01/04/2018 | | | 222 | 8.71% | Issued | 01/04/2018 | | | 152 | 5.96% | Issued | 01/03/2018 | | | 218 | 8.55% | Issued | 01/02/2018 | | | 270 | 10.59% | Issued | 01/01/2018 | | | 233 | 9.14% | Issued | 01/12/2017 | | | 247 | 9.69% | Issued | 01/11/2017 | | | 519 | 20.35% | Issued | 01/11/2017 | | | 256 | 10.04% | Issued | 01/10/2017 | | | 248 | 9.73% | Issued | 01/10/2017 | | | 489 | 19.18% | Issued | 01/09/2017 | | | 233 | 9.14% | Issued | 01/09/2017 | | | 354 | 13.88% | Issued | 01/08/2017 | | | 194 | 7.61% | Issued | 01/08/2017 | | | 158 | 6.20% | Issued | 01/07/2017 | | | 184 | 7.22% | Issued | 01/07/2017 | | | 198 | 7.76% | Issued | 01/06/2017 | | | 258 | 10.12% | Issued | 01/06/2017 | | | 220 | 8.63% | Issued | 01/05/2017 | | | 216 | 8.47% | Issued | 01/05/2017 | | | 217 | 8.51% | Issued | 01/04/2017 | | | 380 | 14.90% | Issued | 01/04/2017 | | | 304 | 11.92% | Issued | 01/03/2017 | | | 486 | 19.06% | Redeemed | 01/02/2017 | | | 768 | 30.12% | Redeemed | 01/01/2017 | | | 725 | 28.43% | Redeemed | Dec-16 | 0 | 662 | 662 | 25.96% | Issued | Nov-16 | 0 | 537 | 537 | 21.06% | Issued | Oct-16 | 0 | 493 | 493 | 19.33% | Issued | Oct-16 | 0 | 0 | 493 | 19.33% | Issued | Sep-16 | 0 | 511 | 511 | 20.04% | Issued | Aug-16 | 0 | 459 | 459 | 18.00% | Issued | Jul-16 | 0 | 200 | 202 | 7.92% | Issued | Jul-16 | 0 | 200 | 202 | 7.92% | Issued | Jun-16 | 0 | 455 | 455 | 17.84% | Issued | May-16 | 0 | 562 | 562 | 22.04% | Issued | Apr-16 | 0 | 538 | 538 | 21.10% | Issued | Feb-16 | 0 | 670 | 670 | 26.27% | Redeemed | Jan-16 | 0 | 886 | 886 | 34.75% | Redeemed | Dec-15 | 0 | 960 | 960 | 37.65% | Redeemed | Nov-15 | 0 | 629 | 629 | 24.67% | Redeemed | Oct-15 | 0 | 450 | 453 | 17.76% | Redeemed | Sep-15 | 0 | 563 | 563 | 22.08% | Redeemed | Aug-15 | 0 | 537 | 537 | 21.06% | Redeemed | Jul-15 | 451 | 453 | 453 | 17.76% | Redeemed | Jun-15 | 403 | 404 | 404 | 15.84% | Redeemed | May-15 | 603 | 604 | 604 | 23.69% | Redeemed | Apr-15 | 434 | 434 | 437 | 17.14% | Redeemed | Mar-15 | 603 | 605 | 605 | 23.73% | Redeemed | Feb-15 | 742 | 743 | 743 | 29.14% | Redeemed | Jan-15 | 965 | 966 | 966 | 37.88% | Redeemed | Dec-14 | 768 | 768 | 768 | 30.12% | Redeemed | Nov-14 | 572 | 574 | 574 | 22.51% | Redeemed | Oct-14 | 723 | 724 | 724 | 28.39% | Redeemed | Sep-14 | 283 | 283 | 285 | 11.18% | Redeemed | Aug-14 | 533 | 535 | 535 | 20.98% | Redeemed | Jul-14 | 295 | 296 | 299 | 11.73% | Redeemed | Jun-14 | 248 | 248 | 250 | 9.80% | Redeemed | May-14 | 301 | 302 | 303 | 11.88% | Redeemed | Apr-14 | 431 | 431 | 431 | 16.90% | Redeemed | Mar-14 | 606 | 608 | 608 | 23.84% | Redeemed | Feb-14 | 863 | 863 | 863 | 33.84% | Expired | Jan-14 | 932 | 933 | 933 | 36.59% | Redeemed | Dec-13 | 923 | 924 | 924 | 36.24% | Redeemed | Nov-13 | 618 | 618 | 618 | 24.24% | Redeemed | Oct-13 | 689 | 690 | 689 | 27.02% | Redeemed | Sep-13 | 553 | 555 | 555 | 21.76% | Redeemed | Aug-13 | 349 | 349 | 352 | 13.80% | Redeemed | Jul-13 | 233 | 233 | 236 | 9.25% | Redeemed | Jun-13 | 277 | 277 | 280 | 10.98% | Redeemed | May-13 | 738 | 739 | 739 | 28.98% | Redeemed | Apr-13 | 621 | 623 | 623 | 24.43% | Redeemed | Mar-13 | 599 | 600 | 600 | 23.53% | Redeemed | Feb-13 | 519 | 521 | 521 | 20.43% | Redeemed | Jan-13 | 481 | 482 | 482 | 18.90% | Redeemed | Dec-12 | 791 | 792 | 792 | 31.06% | Redeemed | Nov-12 | 578 | 579 | 579 | 22.71% | Redeemed | Oct-12 | 373 | 375 | 375 | 14.71% | Redeemed | Sep-12 | 547 | 549 | 549 | 21.53% | Redeemed | Aug-12 | 396 | 396 | 398 | 15.61% | Redeemed | Jul-12 | 341 | 341 | 342 | 13.41% | Redeemed | Jun-12 | 396 | 398 | 398 | 15.61% | Redeemed | May-12 | 341 | 341 | 343 | 13.45% | Redeemed | Apr-12 | 491 | 493 | 493 | 19.33% | Redeemed | Mar-12 | 546 | 548 | 548 | 21.49% | Redeemed | Feb-12 | 723 | 724 | 724 | 28.39% | Redeemed | Jan-12 | 840 | 841 | 841 | 32.98% | Redeemed | Dec-11 | 786 | 787 | 787 | 30.86% | Redeemed | Nov-11 | 816 | 816 | 816 | 32.00% | Redeemed | Oct-11 | 826 | 826 | 826 | 32.39% | Redeemed | Sep-11 | 678 | 680 | 680 | 26.67% | Redeemed | Aug-11 | 403 | 402 | 405 | 15.88% | Redeemed | Jul-11 | 458 | 460 | 460 | 18.04% | Redeemed | Jun-11 | 319 | 319 | 321 | 12.59% | Redeemed | May-11 | 646 | 647 | 647 | 25.37% | Redeemed | Apr-11 | 408 | 410 | 410 | 16.08% | Redeemed | Mar-11 | 535 | 535 | 535 | 20.98% | Redeemed | Feb-11 | 743 | 745 | 745 | 29.22% | Redeemed | Jan-11 | 448 | 448 | 448 | 17.57% | Redeemed | Dec-10 | 553 | 555 | 555 | 21.76% | Redeemed | Nov-10 | 679 | 680 | 680 | 26.67% | Redeemed |
|
Capacity: 5.1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|