Sorry I found no matches, Please try again. 176
vid = 213pws_id = 354157pws_id = 354157
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.119.192.146 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Hill of Easterton Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Hill of Easterton Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Aberdeenshire    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 2.5 MW
Approx Date of 1st power generation: July 2007

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Mackies Dairy
Ice cream manufacturers Mackie's of Scotland have their own energy supply - three Vestas V52 wind turbines - referred to as "Mackie's", "Ice" and "Cream". Each of these graceful machines have a 45 metre turbine and three 25 metre blades on the turning propeller and capacity to produce 850KW of power - so a total capacity at the farm of 2.5 MW.
Wind turbines are not a new sight on the farm, Mac's father Maitland previously installed a smaller turbine which powered the business's former piggery unit until 1997. That was one of the first grid connected wind turbines in the UK but did not have a very large output.

 Turbine Make and Specs

Model: Vestas V52-850 Start Speed: 2.5
Capacity: 0.85 Optimal Speed: 6.5
Rotor Diameter: 52 Stop Speed: 12
Hub Height 45   Avg for all turbines:45 Avg. Elevation: 222
Web Page: http://www.nrg-http://www.nrg-systems.hu/dok/V52_UK.pdf
Comment:

 Address

Mackies Hill of Easterton Wind Turbine - D Hill of Easterton Scotland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Hill of Easterton )

 DECC Data on this Project: Hill of Easterton :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hill of Easterton Extension 2     2.3 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3812 / AA420     District:
Applicant: Mackies Limited     Application : APP/2011/2120 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 2.3
Site Address: Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
 
County: Grampian Region: Scotland
OS Coordinates: 375650 / 375650
Development Status: Planning Permission Refused
Application Submitted: 6/15/2011 Planning Permission Granted
Application Determined: Permission refused: 12/24/2012
Construction Date:    
Generator Live This Record Last Updated: 1/25/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 12/24/2012

Site Name: Hill of Easterton Extension     2 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 4056 / N00419W     District:
Applicant: Mackies     Application : APP/2005/3308 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 1
Height of Turbines: Calculated capacity: 2
Site Address: Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
 
County: Grampian Region: Scotland
OS Coordinates: 376449 / 376449
Development Status: Operational
Application Submitted: 9/28/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 7/31/2007 This Record Last Updated: 10/8/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Hill of Easterton     2.5 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3532 / EN00082     District:
Applicant: Mackies     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 2.5
Site Address: Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
 
County: Grampian Region: Scotland
OS Coordinates: 376449 / 376449
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/1/2005 This Record Last Updated: 10/1/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hill of Easterton: Wind :

Site Name: Mackies Hill of Easterton Wind Turbine - D
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00054SQSC
Capacity: 2550 Status: Live
Accreditation Date:    
Commission Date: 1/1/2005    
Applicant: Mackies Limited
Applicant Address: Mackies Of Scotland Westertown Rothienorman Inverurie AB51 8US Scotland
Address: Mackies Hill of Easterton Wind Turbine - D Hill of EastertonScotland Scotland

Site Name: Mackies Hill of Easterton Wind Turbine - D
Generator Type: Wind
Scheme : REGO Generator ID: G00267NWSC
Capacity: 2550 Status: Live
Accreditation Date:    
Commission Date: 1/1/2005    
Applicant: Mackies Limited
Applicant Address: Mackies Of Scotland Westertown Rothienorman Inverurie AB51 8US Scotland
Address: Mackies Hill of Easterton Wind Turbine - D Hill of EastertonScotland Scotland
 
Assumptions: Capacity: 2550kW 2.55 MW,
Thus over the month Capacity * 720 hours per month = 1836 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 468 18.35% Issued
01/04/2018 222 8.71% Issued
01/04/2018 152 5.96% Issued
01/03/2018 218 8.55% Issued
01/02/2018 270 10.59% Issued
01/01/2018 233 9.14% Issued
01/12/2017 247 9.69% Issued
01/11/2017 256 10.04% Issued
01/11/2017 519 20.35% Issued
01/10/2017 489 19.18% Issued
01/10/2017 248 9.73% Issued
01/09/2017 354 13.88% Issued
01/09/2017 233 9.14% Issued
01/08/2017 194 7.61% Issued
01/08/2017 158 6.20% Issued
01/07/2017 184 7.22% Issued
01/07/2017 198 7.76% Issued
01/06/2017 258 10.12% Issued
01/06/2017 220 8.63% Issued
01/05/2017 216 8.47% Issued
01/05/2017 217 8.51% Issued
01/04/2017 380 14.90% Issued
01/04/2017 304 11.92% Issued
01/03/2017 486 19.06% Redeemed
01/02/2017 768 30.12% Redeemed
01/01/2017 725 28.43% Redeemed
Dec-16 0662 662 25.96% Issued
Nov-16 0537 537 21.06% Issued
Oct-16 00 493 19.33% Issued
Oct-16 0493 493 19.33% Issued
Sep-16 0511 511 20.04% Issued
Aug-16 0459 459 18.00% Issued
Jul-16 0200 202 7.92% Issued
Jul-16 0200 202 7.92% Issued
Jun-16 0455 455 17.84% Issued
May-16 0562 562 22.04% Issued
Apr-16 0538 538 21.10% Issued
Feb-16 0670 670 26.27% Redeemed
Jan-16 0886 886 34.75% Redeemed
Dec-15 0960 960 37.65% Redeemed
Nov-15 0629 629 24.67% Redeemed
Oct-15 0450 453 17.76% Redeemed
Sep-15 0563 563 22.08% Redeemed
Aug-15 0537 537 21.06% Redeemed
Jul-15 451453 453 17.76% Redeemed
Jun-15 403404 404 15.84% Redeemed
May-15 603604 604 23.69% Redeemed
Apr-15 434434 437 17.14% Redeemed
Mar-15 603605 605 23.73% Redeemed
Feb-15 742743 743 29.14% Redeemed
Jan-15 965966 966 37.88% Redeemed
Dec-14 768768 768 30.12% Redeemed
Nov-14 572574 574 22.51% Redeemed
Oct-14 723724 724 28.39% Redeemed
Sep-14 283283 285 11.18% Redeemed
Aug-14 533535 535 20.98% Redeemed
Jul-14 295296 299 11.73% Redeemed
Jun-14 248248 250 9.80% Redeemed
May-14 301302 303 11.88% Redeemed
Apr-14 431431 431 16.90% Redeemed
Mar-14 606608 608 23.84% Redeemed
Feb-14 863863 863 33.84% Expired
Jan-14 932933 933 36.59% Redeemed
Dec-13 923924 924 36.24% Redeemed
Nov-13 618618 618 24.24% Redeemed
Oct-13 689690 689 27.02% Redeemed
Sep-13 553555 555 21.76% Redeemed
Aug-13 349349 352 13.80% Redeemed
Jul-13 233233 236 9.25% Redeemed
Jun-13 277277 280 10.98% Redeemed
May-13 738739 739 28.98% Redeemed
Apr-13 621623 623 24.43% Redeemed
Mar-13 599600 600 23.53% Redeemed
Feb-13 519521 521 20.43% Redeemed
Jan-13 481482 482 18.90% Redeemed
Dec-12 791792 792 31.06% Redeemed
Nov-12 578579 579 22.71% Redeemed
Oct-12 373375 375 14.71% Redeemed
Sep-12 547549 549 21.53% Redeemed
Aug-12 396396 398 15.61% Redeemed
Jul-12 341341 342 13.41% Redeemed
Jun-12 396398 398 15.61% Redeemed
May-12 341341 343 13.45% Redeemed
Apr-12 491493 493 19.33% Redeemed
Mar-12 546548 548 21.49% Redeemed
Feb-12 723724 724 28.39% Redeemed
Jan-12 840841 841 32.98% Redeemed
Dec-11 786787 787 30.86% Redeemed
Nov-11 816816 816 32.00% Redeemed
Oct-11 826826 826 32.39% Redeemed
Sep-11 678680 680 26.67% Redeemed
Aug-11 403402 405 15.88% Redeemed
Jul-11 458460 460 18.04% Redeemed
Jun-11 319319 321 12.59% Redeemed
May-11 646647 647 25.37% Redeemed
Apr-11 408410 410 16.08% Redeemed
Mar-11 535535 535 20.98% Redeemed
Feb-11 743745 745 29.22% Redeemed
Jan-11 448448 448 17.57% Redeemed
Dec-10 553555 555 21.76% Redeemed
Nov-10 679680 680 26.67% Redeemed

 Calculations


Capacity: 5.1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5.1 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 354157

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School