Four Burrows Solar Farm

Four Burrows Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Four Burrows Blackwater Cornwall TR4 8JB    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 7 MW
Acreage:25   or approx Hectares : 10
Approx Date of 1st power generation: February 2014

/YES

 Comment

PA13/01195 | Solar photovoltaic (PV) farm for up to 7MW - application accompanied by an environmental statement | Four Burrows Farm Four Burrows Blackwater Cornwall TR4 8JB

 Address

Four Burrows, Four Burrows Farm, Blackwater Cornwall TR4 8JB

 Associated Companies.

Relationship Company (For: Four Burrows )
InstallerOskomera
DeveloperRenewable Energy Systems Ltd
OperatorRES Renewable Energy Systems Ltd

 DECC Data on this Project: Four Burrows :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Four Burrows Farm (Extension 2)     6.3 MW
Energy Type: Solar Photovoltaics
County: Cornwall     Country: England     LPA: Cornwall Council
Site ID and Reference: 1655 / C1008     District:
Applicant: Renewable Energy Systems (RES)     Application : PA13/01195 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Four Burrows Farm Four Burrows Blackwater Cornwall
  TR4 8JB
County: Cornwall Region: South West
OS Coordinates: 176498 / 176498
Development Status: Operational
Application Submitted: 2/20/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/23/2014    
Generator Live 11/3/2014 This Record Last Updated: 12/17/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Four Burrows Solar farm (Extension 1)     1.5 MW
Energy Type: Solar Photovoltaics
County: Cornwall     Country: England     LPA: Cornwall Council
Site ID and Reference: 1726 / IF1099     District:
Applicant: Inazin Power Ltd     Application : PA12/02338 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land East Of Little Lambriggan Farm (South West Of Higher Callestick Farm) Callestick Cornwall
 
County: Cornwall Region: South West
OS Coordinates: 176618 / 176618
Development Status: Operational
Application Submitted: 3/28/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/23/2014 This Record Last Updated: 2/26/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Four Burrows Solar farm     7.2 MW
Energy Type: Solar Photovoltaics
County: Cornwall     Country: England     LPA: Cornwall Council
Site ID and Reference: 1595 / AA893     District:
Applicant: TRIG     Application : PA10/07942 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Little Lambriggan Penhallow Truro Cornwall
  TR4 9NG
County: Cornwall Region: South West
OS Coordinates: 176400 / 176400
Development Status: Operational
Application Submitted: 12/2/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/1/2014    
Generator Live 1/12/2015 This Record Last Updated: 3/30/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Four Burrows: Solar :

Site Name: Kenwyn Solar
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G05908PVEN
Capacity: 5400 Status: Live
Accreditation Date: 12/2/2010    
Commission Date: 12/10/2014    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Four Burrows Farm Blackwater Truro TR4 8JB England
 
Assumptions: Capacity: 5400kW 5.4 MW,
Thus over the month Capacity * 720 hours per month = 3888 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/02/2018 427 7.91% Issued
01/01/2018 231 4.28% Issued
01/12/2017 176 3.26% Issued
01/11/2017 268 4.96% Issued
01/10/2017 363 6.72% Issued
01/09/2017 620 11.48% Issued
01/08/2017 849 15.72% Issued
01/07/2017 909 16.83% Issued
01/06/2017 769 14.24% Issued
01/05/2017 925 17.13% Issued
01/04/2017 1008 18.67% Issued
01/03/2017 482 8.93% Redeemed
01/02/2017 317 5.87% Redeemed
01/01/2017 220 4.07% Redeemed
Dec-16 0216 154 2.85% Issued
Nov-16 0358 261 4.83% Issued
Oct-16 0747 538 9.96% Issued
Sep-16 0818 588 10.89% Issued
Aug-16 01256 897 16.61% Issued
Jul-16 01351 965 17.87% Issued
Jun-16 01297 926 17.15% Issued
Jun-16 01297 926 17.15% Pending Tr
May-16 01388 991 18.35% Issued
Apr-16 01143 816 15.11% Issued
Mar-16 0896 644 11.93% Redeemed
Feb-16 0358 261 4.83% Redeemed
Jan-16 0233 325 6.02% Revoked
Dec-15 0146 110 2.04% Redeemed
Nov-15 0222 163 3.02% Redeemed
Oct-15 0689 496 9.19% Redeemed
Sep-15 01067 762 14.11% Redeemed
Aug-15 01134 810 15.00% Redeemed
Jul-15 9771368 977 18.09% Redeemed
Jun-15 11471606 1147 21.24% Redeemed
May-15 9821374 982 18.19% Redeemed
Apr-15 10471466 1047 19.39% Redeemed
Mar-15 687956 686 12.70% Redeemed
Feb-15 334462 334 6.19% Redeemed
Jan-15 221305 181 3.35% Redeemed
Dec-14 83115 83 1.54% Expired

Project Info
FOUR BURROWS solar farm extension 2 layout

RES enters PV market with first UK solar farm - FOUR BURROWS
The project represents the renewable energy giant’s first foray into the UK utility-scale PV market and is located next to the company’s FOUR BURROWS Wind Farm.

planning permission for FOUR BURROWS Farm

planning application for FOUR BURROWS Farm

(2013) RES to add solar at FOUR BURROWS
RES has won a planning nod from Cornwall Council on plans to build a 6.3MW solar array next to its existing 4.5MW FOUR BURROWS wind farm.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School