Loading
Page views this IP this session = 1 of 10 unsubscribed pagesFour Burrows Solar Farm
Four Burrows Solar Farm (Solar , Active) Location in the UK : England, Four Burrows Blackwater Cornwall TR4 8JB Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 7 MW Acreage:25 or approx Hectares : 10 Approx Date of 1st power generation: February 2014
/YES
PA13/01195 | Solar photovoltaic (PV) farm for up to 7MW - application accompanied by an environmental statement | Four Burrows Farm Four Burrows Blackwater Cornwall TR4 8JB Four Burrows, Four Burrows Farm, Blackwater Cornwall TR4 8JB
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Four Burrows Farm (Extension 2) 6.3 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Cornwall Country: England LPA: Cornwall Council
|
Site ID and Reference: |
1655 / C1008
District:
|
Applicant: |
Renewable Energy Systems (RES)
Application :
PA13/01195
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Four Burrows Farm Four Burrows Blackwater Cornwall
|
|
TR4 8JB
|
County: |
Cornwall Region: South West
|
OS Coordinates: |
176498 / 176498
|
Development Status: |
Operational
|
Application Submitted: |
2/20/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
2/23/2014
|
|
|
Generator Live |
11/3/2014
|
This Record Last Updated: |
12/17/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Four Burrows Solar farm (Extension 1) 1.5 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Cornwall Country: England LPA: Cornwall Council
|
Site ID and Reference: |
1726 / IF1099
District:
|
Applicant: |
Inazin Power Ltd
Application :
PA12/02338
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land East Of Little Lambriggan Farm (South West Of Higher Callestick Farm) Callestick Cornwall
|
|
|
County: |
Cornwall Region: South West
|
OS Coordinates: |
176618 / 176618
|
Development Status: |
Operational
|
Application Submitted: |
3/28/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/23/2014
|
This Record Last Updated: |
2/26/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Four Burrows Solar farm 7.2 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Cornwall Country: England LPA: Cornwall Council
|
Site ID and Reference: |
1595 / AA893
District:
|
Applicant: |
TRIG
Application :
PA10/07942
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Little Lambriggan Penhallow Truro Cornwall
|
|
TR4 9NG
|
County: |
Cornwall Region: South West
|
OS Coordinates: |
176400 / 176400
|
Development Status: |
Operational
|
Application Submitted: |
12/2/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
7/1/2014
|
|
|
Generator Live |
1/12/2015
|
This Record Last Updated: |
3/30/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Kenwyn Solar
|
Generator Type: |
Photovoltaic
|
Scheme : |
REGO
|
Generator ID: |
G05908PVEN
|
Capacity: |
5400
|
Status: |
Live
|
Accreditation Date: |
12/2/2010
|
|
|
Commission Date: |
12/10/2014
|
|
|
Applicant: |
RES Ltd
|
Applicant Address: |
Beaufort Court
Egg Farm Lane
Kings Langley
WD4 8LR
England
|
Address: |
Four Burrows Farm
Blackwater
Truro
TR4 8JB
England
|
|
Assumptions: Capacity: 5400kW 5.4 MW, Thus over the month Capacity * 720 hours per month = 3888 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/02/2018 | | | 427 | 7.91% | Issued | 01/01/2018 | | | 231 | 4.28% | Issued | 01/12/2017 | | | 176 | 3.26% | Issued | 01/11/2017 | | | 268 | 4.96% | Issued | 01/10/2017 | | | 363 | 6.72% | Issued | 01/09/2017 | | | 620 | 11.48% | Issued | 01/08/2017 | | | 849 | 15.72% | Issued | 01/07/2017 | | | 909 | 16.83% | Issued | 01/06/2017 | | | 769 | 14.24% | Issued | 01/05/2017 | | | 925 | 17.13% | Issued | 01/04/2017 | | | 1008 | 18.67% | Issued | 01/03/2017 | | | 482 | 8.93% | Redeemed | 01/02/2017 | | | 317 | 5.87% | Redeemed | 01/01/2017 | | | 220 | 4.07% | Redeemed | Dec-16 | 0 | 216 | 154 | 2.85% | Issued | Nov-16 | 0 | 358 | 261 | 4.83% | Issued | Oct-16 | 0 | 747 | 538 | 9.96% | Issued | Sep-16 | 0 | 818 | 588 | 10.89% | Issued | Aug-16 | 0 | 1256 | 897 | 16.61% | Issued | Jul-16 | 0 | 1351 | 965 | 17.87% | Issued | Jun-16 | 0 | 1297 | 926 | 17.15% | Issued | Jun-16 | 0 | 1297 | 926 | 17.15% | Pending Tr | May-16 | 0 | 1388 | 991 | 18.35% | Issued | Apr-16 | 0 | 1143 | 816 | 15.11% | Issued | Mar-16 | 0 | 896 | 644 | 11.93% | Redeemed | Feb-16 | 0 | 358 | 261 | 4.83% | Redeemed | Jan-16 | 0 | 233 | 325 | 6.02% | Revoked | Dec-15 | 0 | 146 | 110 | 2.04% | Redeemed | Nov-15 | 0 | 222 | 163 | 3.02% | Redeemed | Oct-15 | 0 | 689 | 496 | 9.19% | Redeemed | Sep-15 | 0 | 1067 | 762 | 14.11% | Redeemed | Aug-15 | 0 | 1134 | 810 | 15.00% | Redeemed | Jul-15 | 977 | 1368 | 977 | 18.09% | Redeemed | Jun-15 | 1147 | 1606 | 1147 | 21.24% | Redeemed | May-15 | 982 | 1374 | 982 | 18.19% | Redeemed | Apr-15 | 1047 | 1466 | 1047 | 19.39% | Redeemed | Mar-15 | 687 | 956 | 686 | 12.70% | Redeemed | Feb-15 | 334 | 462 | 334 | 6.19% | Redeemed | Jan-15 | 221 | 305 | 181 | 3.35% | Redeemed | Dec-14 | 83 | 115 | 83 | 1.54% | Expired |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|