Page views this IP this session = 1 of 10 unsubscribed pagesChelveston Solar Farm
Chelveston Solar Farm (Solar , Active) Location in the UK : England, Chelveston Airfield, Northamptonshire Type of installation: Solar on/offshore: on Solar Panels :25000 Capacity : 19.5 MW Approx Date of 1st power generation: February 2014
/YES
Chelveston Solar Farm
2013 Apr: approved but a revised flood risk assessment required.
The 25,000 solar panels at Chelveston Renewable Energy Park could provide power for more than 2,100 households a year.
10 Hectares. Chelveston Airfield, Northamptonshire
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Chelveston Renewable Energy Park 21 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Northamptonshire Country: England LPA: East Northamptonshire Council
|
Site ID and Reference: |
5055 /
District:
|
Applicant: |
Wykes Engineering
Application :
15/00489/FUL
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Chelveston Renewable Energy Park, Caldecott, Wellingborough, Northamptonshire
|
|
NN9 6AR
|
County: |
Northamptonshire Region: East Midlands
|
OS Coordinates: |
499887 / 499887
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
3/11/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
7/19/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
6/30/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Chelveston Renewable Energy Park - Solar Extension 19.5 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Northamptonshire Country: England LPA: East Northamptonshire Council
|
Site ID and Reference: |
5258 /
District:
|
Applicant: |
FEL Solar
Application :
14/01777/FUL
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Chelveston Renewable Energy Park,
Chelveston Airfield, Chelveston
|
|
NN9 6AR
|
County: |
Northamptonshire Region: East Midlands
|
OS Coordinates: |
500422 / 500422
|
Development Status: |
Operational
|
Application Submitted: |
6/23/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
11/15/2014
|
|
|
Generator Live |
3/20/2015
|
This Record Last Updated: |
6/29/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
10/17/2017 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Chelveston Airfield - extension 3.5 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Bedfordshire Country: England LPA: Bedford Borough Council
|
Site ID and Reference: |
1788 / C2823
District:
|
Applicant: |
Chelveston Renewable Energy
Application :
14/00469/MAF
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Chelveston Airfield Kimbolton Road Chelveston Northamptonshire
|
|
|
County: |
Bedfordshire Region: Eastern
|
OS Coordinates: |
501045 / 501045
|
Development Status: |
Operational
|
Application Submitted: |
3/10/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/30/2014
|
|
|
Generator Live |
9/30/2014
|
This Record Last Updated: |
12/17/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Chelveston Airfield 16 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Bedfordshire Country: England LPA: Bedford Borough Council
|
Site ID and Reference: |
1949 / IF1059
District:
|
Applicant: |
Chelveston Renewable Energy Limited
Application :
12/02408/MAF
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land South Of Chelveston Base Crescent And East Of Upper Higham Lane Northants
|
|
NN9 6AU
|
County: |
Bedfordshire Region: Eastern
|
OS Coordinates: |
500650 / 500650
|
Development Status: |
Operational
|
Application Submitted: |
12/19/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
2/15/2014
|
|
|
Generator Live |
2/28/2014
|
This Record Last Updated: |
6/28/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
FEL Solar
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00487RUEN
|
Capacity: |
22110
|
Status: |
Live
|
Accreditation Date: |
12/19/2012
|
|
|
Commission Date: |
3/20/2015
|
|
|
Applicant: |
Federal Estates Ltd
|
Applicant Address: |
Goosey Lodge
Wymington
Rushden
NN109LU
England
|
Address: |
Chelveston Renewable Energy Park
Chelveston
NN96AR
England
|
Site Name: |
FEL Solar
|
Generator Type: |
Photovoltaic
|
Scheme : |
REGO
|
Generator ID: |
G06109PVEN
|
Capacity: |
22110
|
Status: |
Live
|
Accreditation Date: |
12/19/2012
|
|
|
Commission Date: |
3/20/2015
|
|
|
Applicant: |
Federal Estates Ltd
|
Applicant Address: |
Goosey Lodge
Wymington
Rushden
NN109LU
England
|
Address: |
Chelveston Renewable Energy Park
Chelveston
NN96AR
England
|
|
Assumptions: Capacity: 22110kW 22.11 MW, Thus over the month Capacity * 720 hours per month = 15919.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 4160 | 18.82% | Issued | 01/04/2018 | | | 2398 | 10.85% | Issued | 01/03/2018 | | | 1866 | 8.44% | Issued | 01/02/2018 | | | 1570 | 7.10% | Issued | 01/02/2018 | | | 2 | 0.01% | Issued | 01/01/2018 | | | 650 | 2.94% | Issued | 01/12/2017 | | | 1 | 0.00% | Issued | 01/12/2017 | | | 533 | 2.41% | Issued | 01/11/2017 | | | 996 | 4.50% | Issued | 01/11/2017 | | | 1 | 0.00% | Issued | 01/10/2017 | | | 2 | 0.01% | Issued | 01/10/2017 | | | 1629 | 7.37% | Issued | 01/09/2017 | | | 2373 | 10.73% | Issued | 01/09/2017 | | | 2 | 0.01% | Issued | 01/08/2017 | | | 3019 | 13.65% | Issued | 01/08/2017 | | | 3 | 0.01% | Issued | 01/07/2017 | | | 4 | 0.02% | Issued | 01/07/2017 | | | 3333 | 15.07% | Issued | 01/06/2017 | | | 3559 | 16.10% | Issued | 01/06/2017 | | | 4 | 0.02% | Issued | 01/05/2017 | | | 4 | 0.02% | Issued | 01/05/2017 | | | 3383 | 15.30% | Issued | 01/04/2017 | | | 3 | 0.01% | Issued | 01/04/2017 | | | 3121 | 14.12% | Issued | 01/03/2017 | | | 3 | 0.01% | Issued | 01/03/2017 | | | 2399 | 10.85% | Redeemed | 01/02/2017 | | | 1024 | 4.63% | Redeemed | 01/02/2017 | | | 1 | 0.00% | Issued | 01/01/2017 | | | 1 | 0.00% | Issued | 01/01/2017 | | | 616 | 2.79% | Redeemed | Dec-16 | 0 | 759 | 1 | 0.00% | Issued | Nov-16 | 0 | 1287 | 936 | 4.23% | Issued | Oct-16 | 0 | 2492 | 1795 | 8.12% | Issued | Oct-16 | 0 | 0 | 1797 | 8.13% | Issued | Sep-16 | 0 | 3230 | 2322 | 10.50% | Issued | Aug-16 | 0 | 5097 | 3637 | 16.45% | Issued | Jul-16 | 0 | 5184 | 3699 | 16.73% | Issued | Jul-16 | 0 | 5184 | 4 | 0.02% | Issued | Jun-16 | 0 | 4383 | 3127 | 14.14% | Issued | May-16 | 0 | 5214 | 3721 | 16.83% | Issued | Mar-16 | 0 | 2932 | 2 | 0.01% | Issued | Feb-16 | 0 | 2405 | 1 | 0.00% | Issued | Dec-15 | 0 | 653 | 484 | 2.19% | Redeemed | Nov-15 | 0 | 871 | 638 | 2.89% | Redeemed | Oct-15 | 0 | 2309 | 1 | 0.00% | Issued | Sep-15 | 0 | 4065 | 2 | 0.01% | Issued | Aug-15 | 0 | 4152 | 2966 | 13.41% | Redeemed | Jul-15 | 3638 | 5093 | 3635 | 16.44% | Redeemed | Jun-15 | 3647 | 5105 | 3647 | 16.49% | Redeemed | May-15 | 3341 | 4678 | 3340 | 15.11% | Redeemed | Apr-15 | 3120 | 4368 | 3118 | 14.10% | Redeemed | Mar-15 | 779 | 1084 | 779 | 3.52% | Expired |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|