Chelveston Solar Farm

Chelveston Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Chelveston Airfield, Northamptonshire    
Type of installation: Solar    on/offshore: on
Solar Panels :25000  Capacity : 19.5 MW
Approx Date of 1st power generation: February 2014

/YES

 Comment

Chelveston Solar Farm
2013 Apr: approved but a revised flood risk assessment required.
The 25,000 solar panels at Chelveston Renewable Energy Park could provide power for more than 2,100 households a year.
10 Hectares.

 Address

Chelveston Airfield, Northamptonshire

 Associated Companies.

Relationship Company (For: Chelveston )
DeveloperChelveston Renewable Energy Park

 DECC Data on this Project: Chelveston :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Chelveston Renewable Energy Park     21 MW
Energy Type: Solar Photovoltaics
County: Northamptonshire     Country: England     LPA: East Northamptonshire Council
Site ID and Reference: 5055 /     District:
Applicant: Wykes Engineering     Application : 15/00489/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Chelveston Renewable Energy Park, Caldecott, Wellingborough, Northamptonshire
  NN9 6AR
County: Northamptonshire Region: East Midlands
OS Coordinates: 499887 / 499887
Development Status: Planning Permission Expired
Application Submitted: 3/11/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 7/19/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 6/30/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Chelveston Renewable Energy Park - Solar Extension     19.5 MW
Energy Type: Solar Photovoltaics
County: Northamptonshire     Country: England     LPA: East Northamptonshire Council
Site ID and Reference: 5258 /     District:
Applicant: FEL Solar     Application : 14/01777/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Chelveston Renewable Energy Park, Chelveston Airfield, Chelveston
  NN9 6AR
County: Northamptonshire Region: East Midlands
OS Coordinates: 500422 / 500422
Development Status: Operational
Application Submitted: 6/23/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/15/2014    
Generator Live 3/20/2015 This Record Last Updated: 6/29/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 10/17/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Chelveston Airfield - extension     3.5 MW
Energy Type: Solar Photovoltaics
County: Bedfordshire     Country: England     LPA: Bedford Borough Council
Site ID and Reference: 1788 / C2823     District:
Applicant: Chelveston Renewable Energy     Application : 14/00469/MAF (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Chelveston Airfield Kimbolton Road Chelveston Northamptonshire
 
County: Bedfordshire Region: Eastern
OS Coordinates: 501045 / 501045
Development Status: Operational
Application Submitted: 3/10/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/30/2014    
Generator Live 9/30/2014 This Record Last Updated: 12/17/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Chelveston Airfield     16 MW
Energy Type: Solar Photovoltaics
County: Bedfordshire     Country: England     LPA: Bedford Borough Council
Site ID and Reference: 1949 / IF1059     District:
Applicant: Chelveston Renewable Energy Limited     Application : 12/02408/MAF (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land South Of Chelveston Base Crescent And East Of Upper Higham Lane Northants
  NN9 6AU
County: Bedfordshire Region: Eastern
OS Coordinates: 500650 / 500650
Development Status: Operational
Application Submitted: 12/19/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/15/2014    
Generator Live 2/28/2014 This Record Last Updated: 6/28/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Chelveston: Solar :

Site Name: FEL Solar
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00487RUEN
Capacity: 22110 Status: Live
Accreditation Date: 12/19/2012    
Commission Date: 3/20/2015    
Applicant: Federal Estates Ltd
Applicant Address: Goosey Lodge Wymington Rushden NN109LU England
Address: Chelveston Renewable Energy Park Chelveston NN96AR England

Site Name: FEL Solar
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G06109PVEN
Capacity: 22110 Status: Live
Accreditation Date: 12/19/2012    
Commission Date: 3/20/2015    
Applicant: Federal Estates Ltd
Applicant Address: Goosey Lodge Wymington Rushden NN109LU England
Address: Chelveston Renewable Energy Park Chelveston NN96AR England
 
Assumptions: Capacity: 22110kW 22.11 MW,
Thus over the month Capacity * 720 hours per month = 15919.2 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 4160 18.82% Issued
01/04/2018 2398 10.85% Issued
01/03/2018 1866 8.44% Issued
01/02/2018 1570 7.10% Issued
01/02/2018 2 0.01% Issued
01/01/2018 650 2.94% Issued
01/12/2017 1 0.00% Issued
01/12/2017 533 2.41% Issued
01/11/2017 996 4.50% Issued
01/11/2017 1 0.00% Issued
01/10/2017 2 0.01% Issued
01/10/2017 1629 7.37% Issued
01/09/2017 2373 10.73% Issued
01/09/2017 2 0.01% Issued
01/08/2017 3019 13.65% Issued
01/08/2017 3 0.01% Issued
01/07/2017 4 0.02% Issued
01/07/2017 3333 15.07% Issued
01/06/2017 3559 16.10% Issued
01/06/2017 4 0.02% Issued
01/05/2017 4 0.02% Issued
01/05/2017 3383 15.30% Issued
01/04/2017 3 0.01% Issued
01/04/2017 3121 14.12% Issued
01/03/2017 3 0.01% Issued
01/03/2017 2399 10.85% Redeemed
01/02/2017 1024 4.63% Redeemed
01/02/2017 1 0.00% Issued
01/01/2017 1 0.00% Issued
01/01/2017 616 2.79% Redeemed
Dec-16 0759 1 0.00% Issued
Nov-16 01287 936 4.23% Issued
Oct-16 02492 1795 8.12% Issued
Oct-16 00 1797 8.13% Issued
Sep-16 03230 2322 10.50% Issued
Aug-16 05097 3637 16.45% Issued
Jul-16 05184 3699 16.73% Issued
Jul-16 05184 4 0.02% Issued
Jun-16 04383 3127 14.14% Issued
May-16 05214 3721 16.83% Issued
Mar-16 02932 2 0.01% Issued
Feb-16 02405 1 0.00% Issued
Dec-15 0653 484 2.19% Redeemed
Nov-15 0871 638 2.89% Redeemed
Oct-15 02309 1 0.00% Issued
Sep-15 04065 2 0.01% Issued
Aug-15 04152 2966 13.41% Redeemed
Jul-15 36385093 3635 16.44% Redeemed
Jun-15 36475105 3647 16.49% Redeemed
May-15 33414678 3340 15.11% Redeemed
Apr-15 31204368 3118 14.10% Redeemed
Mar-15 7791084 779 3.52% Expired

Project Info
Welcome to CHELVESTON Renewable Energy park

CHELVESTON Renewable Energy - home site plus maps etc

planning application - link not working today

Solar installation on the old CHELVESTON airfield: aerial 2014
Geograph

Northamptonshire could become 'wind farm capital'
The government has approved turbines for Bozeat, Kelmarsh, Boddington and Watford Lodge. Best renewable energy Appeals are also pending for wind farms at Sudborough, CHELVESTON, Helmdon, Lilbourne and Winwick.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School