Page views this IP this session = 1 of 10 unsubscribed pagesLambrigg Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Lambrigg Wind Farm (Wind , Active) Location in the UK : England, Cumbria Type of installation: Wind on/offshore: on Turbines :5 Capacity : 6.5 MW Approx Date of 1st power generation: September 2000
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
At the time of opening September 2000 this 6.5 megawatt (MW) wind farm was the largest to be constructed in England since 1993. Lambriggs five turbines generate enough clean, pollution free electricity each year to meet the average annual needs of around 4,000 homes.
Model: |
Nordex N60/1300
|
Start Speed: |
4.5
|
Capacity: |
1.3
|
Optimal Speed: |
10
|
Rotor Diameter: |
60
|
Stop Speed: |
25
|
Hub Height |
43 Avg for all turbines:43
|
Avg. Elevation: |
277
|
Web Page: |
http://www.nordex-online.com/fileadmin/MEDIA/Produktinfos/EN/Nordex_N60_EN.pdf |
Comment: |
|
Riverside House Meadowbank Furlong Road Bourne End, Buckinghamshire SL8 5AJ
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Lambrigg Wind Farm 6.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: South Lakeland District Council
|
Site ID and Reference: |
3390 / 07057W4
District:
|
Applicant: |
Lambrigg Windfarm Ltd
Application :
5/98/1478
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
6.5 |
Site Address: |
Lambrigg Fell, Off A684, Roan Edge
Cumbria
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
358800 / 358800
|
Development Status: |
Operational
|
Application Submitted: |
6/23/1998
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
9/22/2001
|
This Record Last Updated: |
4/11/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
LAMBRIGG WINDFARM
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00203NWEN
|
Capacity: |
6435
|
Status: |
Live
|
Accreditation Date: |
6/23/1998
|
|
|
Commission Date: |
9/1/2000
|
|
|
Applicant: |
Beaufort Wind Ltd
|
Applicant Address: |
Riverside House
Meadowbank
Furlong Road Bourne End, Buckinghamshire
SL8 5AJ
|
Address: |
Lambrigg Wind Farm
Near Kendal
Kendal
LA8 0AP
England
|
|
Assumptions: Capacity: 6435kW 6.435 MW, Thus over the month Capacity * 720 hours per month = 4633.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 995 | 15.46% | Issued | 01/02/2018 | | | 820 | 12.74% | Issued | 01/01/2018 | | | 1375 | 21.37% | Issued | 01/12/2017 | | | 848 | 13.18% | Issued | 01/11/2017 | | | 787 | 12.23% | Issued | 01/10/2017 | | | 1259 | 19.56% | Issued | 01/09/2017 | | | 594 | 9.23% | Issued | 01/08/2017 | | | 66 | 1.03% | Issued | 01/07/2017 | | | 581 | 9.03% | Issued | 01/06/2017 | | | 932 | 14.48% | Issued | 01/05/2017 | | | 776 | 12.06% | Issued | 01/04/2017 | | | 584 | 9.08% | Issued | 01/03/2017 | | | 968 | 15.04% | Redeemed | 01/02/2017 | | | 947 | 14.72% | Redeemed | 01/01/2017 | | | 375 | 5.83% | Redeemed | Dec-16 | 0 | 673 | 673 | 10.46% | Issued | Nov-16 | 0 | 611 | 615 | 9.56% | Issued | Oct-16 | 0 | 662 | 662 | 10.29% | Issued | Sep-16 | 0 | 675 | 675 | 10.49% | Issued | Aug-16 | 0 | 722 | 722 | 11.22% | Issued | Jul-16 | 0 | 619 | 333 | 5.17% | Issued | Jun-16 | 0 | 327 | 333 | 5.17% | Issued | Jun-16 | 0 | 327 | 333 | 5.17% | Issued | May-16 | 0 | 672 | 672 | 10.44% | Issued | Apr-16 | 0 | 481 | 484 | 7.52% | Issued | Mar-16 | 0 | 516 | 521 | 8.10% | Redeemed | Feb-16 | 0 | 836 | 836 | 12.99% | Redeemed | Jan-16 | 0 | 1022 | 1022 | 15.88% | Redeemed | Dec-15 | 0 | 1376 | 1376 | 21.38% | Redeemed | Nov-15 | 0 | 1175 | 1175 | 18.26% | Redeemed | Oct-15 | 0 | 440 | 445 | 6.92% | Redeemed | Sep-15 | 0 | 290 | 294 | 4.57% | Redeemed | Aug-15 | 0 | 618 | 618 | 9.60% | Redeemed | Jul-15 | 623 | 619 | 623 | 9.68% | Redeemed | Jun-15 | 511 | 507 | 511 | 7.94% | Redeemed | May-15 | 947 | 947 | 947 | 14.72% | Redeemed | Apr-15 | 682 | 677 | 682 | 10.60% | Redeemed | Mar-15 | 1311 | 1311 | 1311 | 20.37% | Redeemed | Feb-15 | 844 | 844 | 844 | 13.12% | Redeemed | Jan-15 | 1437 | 1436 | 1436 | 22.32% | Redeemed | Dec-14 | 1345 | 1345 | 1345 | 20.90% | Redeemed | Nov-14 | 774 | 774 | 774 | 12.03% | Redeemed | Oct-14 | 1279 | 1279 | 1279 | 19.88% | Redeemed | Sep-14 | 171 | 164 | 171 | 2.66% | Redeemed | Aug-14 | 757 | 757 | 757 | 11.76% | Redeemed | Jul-14 | 431 | 426 | 430 | 6.68% | Redeemed | Jun-14 | 207 | 202 | 208 | 3.23% | Redeemed | May-14 | 655 | 651 | 655 | 10.18% | Redeemed | Apr-14 | 814 | 814 | 814 | 12.65% | Redeemed | Mar-14 | 1208 | 1208 | 1208 | 18.77% | Redeemed | Feb-14 | 1898 | 1897 | 1897 | 29.48% | Redeemed | Jan-14 | 1293 | 1294 | 1294 | 20.11% | Redeemed | Dec-13 | 1487 | 1487 | 1487 | 23.11% | Redeemed | Nov-13 | 635 | 630 | 634 | 9.85% | Redeemed | Oct-13 | 1434 | 1434 | 1 | 0.02% | Redeemed | Sep-13 | 487 | 483 | 1 | 0.02% | Redeemed | Aug-13 | 526 | 522 | 526 | 8.17% | Redeemed | Jul-13 | 240 | 233 | 239 | 3.71% | Redeemed | Jun-13 | 213 | 205 | 214 | 3.33% | Redeemed | May-13 | 808 | 807 | 807 | 12.54% | Redeemed | Apr-13 | 863 | 863 | 863 | 13.41% | Redeemed | Mar-13 | 943 | 943 | 943 | 14.65% | Redeemed | Feb-13 | 703 | 702 | 702 | 10.91% | Redeemed | Jan-13 | 719 | 720 | 720 | 11.19% | Redeemed | Dec-12 | 979 | 979 | 979 | 15.21% | Redeemed | Nov-12 | 758 | 758 | 758 | 11.78% | Redeemed | Oct-12 | 645 | 640 | 645 | 10.02% | Redeemed | Sep-12 | 926 | 926 | 926 | 14.39% | Redeemed | Aug-12 | 551 | 548 | 551 | 8.56% | Redeemed | Jul-12 | 574 | 571 | 574 | 8.92% | Redeemed | Jun-12 | 773 | 773 | 773 | 12.01% | Redeemed | May-12 | 720 | 720 | 720 | 11.19% | Redeemed | Apr-12 | 878 | 874 | 878 | 13.64% | Redeemed | Mar-12 | 371 | 367 | 371 | 5.77% | Redeemed | Feb-12 | 639 | 635 | 639 | 9.93% | Redeemed | Jan-12 | 1129 | 1128 | 1128 | 17.53% | Redeemed | Dec-11 | 1458 | 1458 | 1458 | 22.66% | Redeemed | Nov-11 | 1192 | 1192 | 1192 | 18.52% | Redeemed | Oct-11 | 1117 | 1117 | 1117 | 17.36% | Redeemed | Sep-11 | 1036 | 1036 | 1036 | 16.10% | Redeemed | Aug-11 | 416 | 411 | 416 | 6.46% | Redeemed | Jul-11 | 260 | 254 | 260 | 4.04% | Redeemed | Jun-11 | 496 | 492 | 496 | 7.71% | Redeemed | May-11 | 1225 | 1225 | 1225 | 19.04% | Redeemed | Apr-11 | 862 | 862 | 862 | 13.40% | Redeemed | Mar-11 | 530 | 524 | 530 | 8.24% | Redeemed | Feb-11 | 790 | 790 | 790 | 12.28% | Redeemed | Jan-11 | 682 | 682 | 682 | 10.60% | Redeemed | Dec-10 | 284 | 279 | 284 | 4.41% | Redeemed | Nov-10 | 940 | 940 | 940 | 14.61% | Redeemed | Oct-10 | 830 | 830 | 830 | 12.90% | Redeemed |
|
Capacity: 13 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/27/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|