Sorry I found no matches, Please try again. 176
vid = 251pws_id = 352530pws_id = 352530
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.191.37.129 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Longhill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Longhill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Longhill Road March Cambridgeshire    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2 MW
Approx Date of 1st power generation: March 2005

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: Senvion MM82 Start Speed: 2.5
Capacity: 2 Optimal Speed: 6
Rotor Diameter: 82 Stop Speed: 12
Hub Height 69   Avg for all turbines:69 Avg. Elevation: 2
Web Page: http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf
Comment: 0

 Address

Longhill Wind Turbine Longhill Wind Turbine Long Hill Road March Camb PE15 0BLEngland

 Associated Companies.

Relationship Company (For: Longhill )
DeveloperWind Prospect

 DECC Data on this Project: Longhill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Long Hill Road     2 MW
Energy Type: Wind Onshore
County: Cambridgeshire     Country: England     LPA: Fenland District Council
Site ID and Reference: 3101 / N00026W     District:
Applicant: Snow Mountain Investment Ltd     Application : S/YR01/1212/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 2
Site Address: Foundry Way Longhill Road March
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 541686 / 541686
Development Status: Operational
Application Submitted: 7/3/2001 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/1/2005 This Record Last Updated: 4/22/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Longhill: Wind :

Site Name: Longhill Wind Turbine - A,C
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00146RQEN
Capacity: 2000 Status: Live
Accreditation Date: 7/3/2001    
Commission Date: 1/1/2005    
Applicant: Longhill Energy Ltd
Applicant Address: Bubblewell Barn Bubblewell Lane Minhinhampton Glos GL6 9AS GL6 9AS
Address: Longhill Wind Turbine Longhill Wind TurbineLong Hill RoadMarchCamb PE15 0BL England

Site Name: Longhill Wind Turbine - A,C
Generator Type: Wind
Scheme : REGO Generator ID: G00736NWEN
Capacity: 2000 Status: Live
Accreditation Date: 7/3/2001    
Commission Date: 1/1/2005    
Applicant: Longhill Energy Ltd
Applicant Address: Bubblewell Barn Bubblewell Lane Minhinhampton Glos GL6 9AS GL6 9AS
Address: Longhill Wind Turbine Longhill Wind TurbineLong Hill RoadMarchCamb PE15 0BL England
 
Assumptions: Capacity: 2000kW 2 MW,
Thus over the month Capacity * 720 hours per month = 1440 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 345 17.25% Issued
01/03/2018 435 21.75% Issued
01/02/2018 382 19.10% Issued
01/01/2018 538 26.90% Issued
01/12/2017 447 22.35% Issued
01/11/2017 383 19.15% Issued
01/10/2017 304 15.20% Issued
01/09/2017 231 11.55% Issued
01/08/2017 169 8.45% Issued
01/07/2017 166 8.30% Issued
01/06/2017 198 9.90% Issued
01/06/2017 88 4.40% Revoked
01/05/2017 217 10.85% Issued
01/04/2017 286 14.30% Issued
01/03/2017 458 22.90% Issued
01/02/2017 314 15.70% Issued
01/01/2017 381 19.05% Issued
Dec-16 0366 366 18.30% Issued
Nov-16 0404 404 20.20% Issued
Oct-16 0281 281 14.05% Issued
Sep-16 0247 248 12.40% Issued
Aug-16 0293 295 14.75% Issued
Jul-16 0212 214 10.70% Issued
Jul-16 0212 214 10.70% Issued
Jun-16 0132 134 6.70% Issued
May-16 0295 295 14.75% Issued
Apr-16 0246 248 12.40% Issued
Mar-16 0391 391 19.55% Issued
Feb-16 0568 568 28.40% Issued
Jan-16 0644 644 32.20% Issued
Dec-15 0522 522 26.10% Issued
Nov-15 0516 516 25.80% Issued
Oct-15 0283 283 14.15% Issued
Sep-15 0232 232 11.60% Issued
Aug-15 0164 166 8.30% Issued
Jul-15 257256 258 12.90% Expired
Jun-15 303303 303 15.15% Expired
May-15 418418 418 20.90% Redeemed
Apr-15 290290 290 14.50% Redeemed
Mar-15 542543 543 27.15% Redeemed
Feb-15 434434 434 21.70% Expired
Jan-15 693693 693 34.65% Expired
Dec-14 727727 727 36.35% Expired
Nov-14 356355 355 17.75% Expired
Oct-14 483484 484 24.20% Expired
Sep-14 123121 123 6.15% Expired
Aug-14 316315 315 15.75% Expired
Jul-14 228227 229 11.45% Expired
Jun-14 159158 159 7.95% Expired
May-14 298297 297 14.85% Expired
Apr-14 281281 281 14.05% Expired
Mar-14 413414 414 20.70% Expired
Feb-14 717717 717 35.85% Expired
Jan-14 623623 623 31.15% Expired
Dec-13 568568 567 28.35% Expired
Nov-13 414414 414 20.70% Redeemed
Oct-13 568569 568 28.40% Redeemed
Sep-13 245244 245 12.25% Redeemed
Aug-13 262261 261 13.05% Redeemed
Jul-13 169168 169 8.45% Redeemed
Jun-13 314314 314 15.70% Redeemed
May-13 389389 389 19.45% Redeemed
Apr-13 489488 488 24.40% Redeemed
Mar-13 340340 340 17.00% Expired
Feb-13 425425 425 21.25% Expired
Jan-13 417417 417 20.85% Redeemed
Dec-12 655654 654 32.70% Redeemed
Nov-12 453453 453 22.65% Redeemed
Oct-12 364364 364 18.20% Redeemed
Sep-12 409409 409 20.45% Redeemed
Aug-12 270271 1 0.05% Redeemed
Jul-12 222220 222 11.10% Redeemed
Jun-12 180178 180 9.00% Redeemed
May-12 313313 313 15.65% Redeemed
Apr-12 416415 415 20.75% Redeemed
Mar-12 298298 298 14.90% Expired
Feb-12 385386 386 19.30% Expired
Jan-12 608608 608 30.40% Expired
Dec-11 858858 858 42.90% Expired
Nov-11 443443 50 2.50% Revoked
Oct-11 564564 564 28.20% Expired
Sep-11 494493 493 24.65% Redeemed
Aug-11 292292 292 14.60% Redeemed
Jul-11 248247 248 12.40% Redeemed
Jun-11 329329 329 16.45% Redeemed
May-11 504505 505 25.25% Redeemed
Apr-11 356356 356 17.80% Redeemed
Mar-11 286286 286 14.30% Redeemed
Feb-11 527527 527 26.35% Redeemed
Jan-11 471471 471 23.55% Redeemed
Dec-10 384384 384 19.20% Redeemed
Nov-10 497498 498 24.90% Redeemed

 Calculations


Capacity: 4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/22/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 352530

Project Info
Seneca Global Energy partners with ENER-G on three landfill gas generation proje
ENER-G will design, build, finance, operate and maintain three renewable energy facilities at Seneca Global Energy's landfill sites at Blaydon, near Newcastle; LONGHILL, Hartlepool; and Gilberdyke, Hull.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School