Loscar Wind Farm (Wind , Active) Location in the UK : England, harthill Type of installation: Wind on/offshore: on Turbines :3 Capacity : 4.5 MW Approx Date of 1st power generation: January 2011
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Loscar Wind Farm, located near Harthill, Yorkshire, began generating clean energy in 2010.
The three Acciona turbines, measuring 95m to tip, have a total generating capacity of 4.5MW.
Model: |
Acciona AW77
|
Start Speed: |
3.5
|
Capacity: |
1.5
|
Optimal Speed: |
11.1
|
Rotor Diameter: |
77
|
Stop Speed: |
25
|
Hub Height |
58 Avg for all turbines:58
|
Avg. Elevation: |
128
|
Web Page: |
http://www.acciona-energia.com/media/315810/AW1500_brochure.pdf |
Comment: |
|
Loscar Farm Packman Lane Harthill Rotherham S26 7XY England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Loscar Farm 4.5 MW
|
Energy Type: |
Wind Onshore |
County: |
South Yorkshire Country: England LPA: Rotherham Metropolitan Borough Council
|
Site ID and Reference: |
3247 / N00331W
District:
|
Applicant: |
REG Windpower (previously Cornwall Light and Power)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
3.9 |
Site Address: |
Loscar Farm, Packman Lane, Harthill
|
|
|
County: |
South Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
451000 / 451000
|
Development Status: |
Operational
|
Application Submitted: |
11/1/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2010
|
|
|
Generator Live |
1/1/2011
|
This Record Last Updated: |
7/4/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 9 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|