Barmoor Wind Farm (Wind , Active) Location in the UK : England, Type of installation: Wind on/offshore: on Turbines :6 Capacity : 13.8 MW Approx Date of 1st power generation: Jan 2015
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Barmoor Renewable Energy and Wind Farm Supporters (BREWS) are backing the proposal from Catamount and Force 9 Energy to build 10 turbines, each 360 feet high, at Barmoor South Moor.
Model: |
Vestas V80
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:64
|
Avg. Elevation: |
118
|
Web Page: |
|
Comment: |
|
Barmoor Wind FarmNear LowickBerwick TD15 2QD England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Barmoor South Wind Farm 13.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Northumberland Country: England LPA: Northumberland County Council
|
Site ID and Reference: |
4163 / A0544
District:
|
Applicant: |
EDF
Application :
C/07/00180/CPC
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
13.8 |
Site Address: |
Between Ford And Lowick Bowsden Berwick-upon-Tweed
|
|
|
County: |
Northumberland Region: North East
|
OS Coordinates: |
398519 / 398519
|
Development Status: |
Operational
|
Application Submitted: |
11/22/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/17/2007
|
Construction Date: |
3/1/2014
|
|
|
Generator Live |
1/19/2015
|
This Record Last Updated: |
1/20/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/17/2007 |
Site Name: |
Barmoor 27 MW
|
Energy Type: |
Wind Onshore |
County: |
Northumberland Country: England LPA: Northumberland County Council
|
Site ID and Reference: |
3280 / N00454W
District:
|
Applicant: |
Force 9 Energy/Catamount
Application :
06/B/0148
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
0 |
Height of Turbines: |
|
Calculated capacity: |
|
Site Address: |
NE of Ford
|
|
|
County: |
Northumberland Region: North East
|
OS Coordinates: |
398000 / 398000
|
Development Status: |
Revised
|
Application Submitted: |
3/2/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
3/27/2008
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/10/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
3/27/2008 |
Site Name: |
Barmoor
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00350RQEN
|
Capacity: |
11920
|
Status: |
Live
|
Accreditation Date: |
3/2/2006
|
|
|
Commission Date: |
12/22/2014
|
|
|
Applicant: |
BARMOOR WIND POWER LIMITED
|
Applicant Address: |
40 GROSVENOR PLACE
LONDON
SW1X 7EN
England
|
Address: |
Barmoor Wind Farm
Near Lowick
Berwick
TD15 2QD
England
|
Site Name: |
Barmoor
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02590NWEN
|
Capacity: |
11920
|
Status: |
Live
|
Accreditation Date: |
3/2/2006
|
|
|
Commission Date: |
12/22/2014
|
|
|
Applicant: |
BARMOOR WIND POWER LIMITED
|
Applicant Address: |
40 GROSVENOR PLACE
LONDON
SW1X 7EN
England
|
Address: |
Barmoor Wind Farm
Near Lowick
Berwick
TD15 2QD
England
|
|
Assumptions: Capacity: 11920kW 11.92 MW, Thus over the month Capacity * 720 hours per month = 8582.4 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 3818 | 32.03% | Issued | 01/02/2018 | | | 3033 | 25.44% | Issued | 01/01/2018 | | | 4326 | 36.29% | Issued | 01/12/2017 | | | 4186 | 35.12% | Issued | 01/11/2017 | | | 3879 | 32.54% | Issued | 01/10/2017 | | | 4097 | 34.37% | Issued | 01/09/2017 | | | 2285 | 19.17% | Issued | 01/08/2017 | | | 2435 | 20.43% | Issued | 01/07/2017 | | | 2500 | 20.97% | Issued | 01/06/2017 | | | 2852 | 23.93% | Issued | 01/05/2017 | | | 2150 | 18.04% | Issued | 01/04/2017 | | | 3015 | 25.29% | Issued | 01/03/2017 | | | 3243 | 27.21% | Redeemed | 01/02/2017 | | | 3807 | 31.94% | Redeemed | 01/01/2017 | | | 3650 | 30.62% | Redeemed | Dec-16 | 0 | 3698 | 4109 | 34.47% | Issued | Nov-16 | 0 | 2549 | 2832 | 23.76% | Issued | Oct-16 | 0 | 1807 | 2007 | 16.84% | Issued | Sep-16 | 0 | 2322 | 2580 | 21.64% | Issued | Aug-16 | 0 | 2461 | 2735 | 22.94% | Issued | Jul-16 | 0 | 1995 | 2217 | 18.60% | Issued | Jun-16 | 0 | 1195 | 1344 | 11.28% | Issued | Jun-16 | 0 | 1195 | 1344 | 11.28% | Issued | May-16 | 0 | 1981 | 2214 | 18.57% | Issued | Apr-16 | 0 | 1836 | 2040 | 17.11% | Issued | Mar-16 | 0 | 2002 | 2224 | 18.66% | Redeemed | Feb-16 | 0 | 3009 | 3343 | 28.05% | Redeemed | Jan-16 | 0 | 3780 | 4200 | 35.23% | Redeemed | Dec-15 | 0 | 4255 | 4728 | 39.66% | Redeemed | Nov-15 | 0 | 3741 | 4157 | 34.87% | Redeemed | Oct-15 | 0 | 1753 | 1963 | 16.47% | Redeemed | Sep-15 | 0 | 1413 | 1586 | 13.31% | Redeemed | Aug-15 | 0 | 2194 | 2437 | 20.44% | Redeemed | Jul-15 | 2103 | 1881 | 2102 | 17.63% | Redeemed | Jun-15 | 2564 | 2295 | 2565 | 21.52% | Redeemed | May-15 | 3469 | 3122 | 3469 | 29.10% | Redeemed | Apr-15 | 2415 | 2162 | 2416 | 20.27% | Redeemed | Mar-15 | 4221 | 3798 | 4221 | 35.41% | Expired | Feb-15 | 3603 | 3243 | 3603 | 30.23% | Expired | Jan-15 | 5506 | 4955 | 5506 | 46.19% | Expired | Dec-14 | 983 | 887 | 986 | 8.27% | Expired |
|
Capacity: 36 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|