Sorry I found no matches, Please try again. 176
vid = 2824pws_id = 351804pws_id = 351804 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.116.86.160 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Hope Solar Farm

Hope Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Hope Farm, Gwithian Rd    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 5 MW
Acreage:46   or approx Hectares : 18.4
Approx Date of 1st power generation: January 2014

/YES

 Comment

PA10/08338
Planning no:- PA12/00827 27th jan 2012
PA12/10952 20th Nov 2012.

Adjacent to existing Nanterrow Solar Farm

 Address

Trevarnon Farm Gwithian Hayle TR27 5EB England

 Associated Companies.

Relationship Company (For: Hope )
Operatorlow carbon (sic)

 DECC Data on this Project: Hope :1601

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hope Solar Farm     7.3 MW
Energy Type: Solar Photovoltaics
County: Cornwall     Country: England     LPA: Cornwall Council
Site ID and Reference: 1601 / AA926     District:
Applicant: Hope Solar Park Ltd     Application : PA12/00827 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Seven Adjoining Fields Situated Off Gwithian Road Approximately 500M North Of The A30
 
County: Cornwall Region: South West
OS Coordinates: 159932 / 159932
Development Status: Operational
Application Submitted: 2/1/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/23/2014 This Record Last Updated: 5/22/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hope: Solar : R00209RUEN

Site Name: Hope Solar Park
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00209RUEN
Capacity: 5250 Status: Live
Accreditation Date: 2/1/2012    
Commission Date: 1/23/2014    
Applicant: Hope Solar Park Limited
Applicant Address: 2nd Floor 13 Berkeley Street London W1J8DU England
Address: Trevarnon Farm Gwithian Hayle TR27 5EB England

Project Info
400 jobs HOPE as offshore wind farm manufacturer signs up for Humber Bank site
South Korean monopile producer SeAH is looking to create 400 jobs at the North Killingholme site, after confirming its intention to establish a facility.

Solar farm to power NI Water plant
Northern Ireland Water has started building a £7m solar farm to power one of its key water treatment plants. It is HOPEd the facility, on the shores of Lough Neagh, will be finished by March 2018.

Solar farm to power NI Water plant Dunore
Northern Ireland Water has started building a £7m solar farm to power one of its key water treatment plants.It is HOPEd the facility, on the shores of Lough Neagh, will be finished by March 2018.

Wind farm will have environmental benefits but conditions must be met
Britain faces an energy crisis. And Happisburgh faces an erosion crisis. We need investment in renewable energy and we need investment in coastal defences. The proposed new wind farm off the north east Norfolk coast offers HOPE on both fronts.

Five-turbine Garth windfarm opens in Yell
It is HOPEd that the 4.5 megawatt project at Garth, which is located between Basta Voe and Gloup, could eventually bring in over £1 million to the community once bank loans have been repaid.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School