Loading
Page views this IP this session = 1 of 10 unsubscribed pagesMuirhall Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Muirhall Wind Farm (Wind , Active) Location in the UK : Scotland, Muirhall, Clydesdale Type of installation: Wind on/offshore: on Turbines :6 Capacity : 12.3 MW Approx Date of 1st power generation: Jan 2011
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Muirhall Wind Farm is located in the Clydesdale area of central Scotland, on open plateau ground between the villages of Auchengray and Tarbrax. In January 2008 the windfarm was granted planning approval by South Lanarkshire Council after a period of 34 months in the planning system, and started construcion in March 2010.
An Additional two wind turbines are proposed
Model: |
Senvion MM92
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
12
|
Rotor Diameter: |
92
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:80
|
Avg. Elevation: |
265
|
Web Page: |
http://www.repower.de/wind-power-solutions/wind-turbines/5m/ |
Comment: |
The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.
|
Muirhall Farm, Auchengray, South Lanarkshire ML11 8LL
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Muirhall South 8.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: South Lanarkshire Council
|
Site ID and Reference: |
4281 / B1057
District:
|
Applicant: |
Muirhall Energy
Application :
CL/14/0113
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
3.2000000000000002 |
Height of Turbines: |
147 |
Calculated capacity: |
9.6 |
Site Address: |
Stellashaw Moss, South Lanarkshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
299342 / 299342
|
Development Status: |
Operational
|
Application Submitted: |
3/18/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
11/7/2014
|
Construction Date: |
1/21/2016
|
|
|
Generator Live |
3/17/2016
|
This Record Last Updated: |
3/17/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
12/22/2014 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
11/7/2014 |
Site Name: |
Muirhall Extension 6.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: South Lanarkshire Council
|
Site ID and Reference: |
3873 / B0221
District:
|
Applicant: |
Muirhall Energy
Application :
CL/12/0074
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
3.3999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
6.8 |
Site Address: |
Stellashaw Moss, South Lanarkshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
299342 / 299342
|
Development Status: |
Operational
|
Application Submitted: |
2/21/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
4/30/2014
|
This Record Last Updated: |
6/27/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Muirhall 12.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: South Lanarkshire Council
|
Site ID and Reference: |
4683 / EN00064
District:
|
Applicant: |
Lomond Energy
Application :
CL/05/0209
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
12.3 |
Site Address: |
Stellashaw Moss, South Lanarkshire
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
300605 / 300605
|
Development Status: |
Operational
|
Application Submitted: |
3/30/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/2011
|
This Record Last Updated: |
8/16/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Muirhall WF Extension 1 LTD
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00303SQSC
|
Capacity: |
9600
|
Status: |
Live
|
Accreditation Date: |
3/30/2005
|
|
|
Commission Date: |
3/17/2016
|
|
|
Applicant: |
Muirhall WF Extension 1 LTD
|
Applicant Address: |
Muirhall Farm
Auchengray Carnwath
LANARK
ML11 8LL
Scotland
|
Address: |
Muirhall Farm
Auchengray
Lanark
ML11 8LL
Scotland
|
Site Name: |
Muirhall WF Extension 1 LTD
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02418NWSC
|
Capacity: |
9600
|
Status: |
Live
|
Accreditation Date: |
3/30/2005
|
|
|
Commission Date: |
3/17/2016
|
|
|
Applicant: |
Muirhall WF Extension 1 LTD
|
Applicant Address: |
Muirhall Farm
Auchengray Carnwath
LANARK
ML11 8LL
Scotland
|
Address: |
Muirhall Farm
Auchengray
Lanark
ML11 8LL
Scotland
|
|
Assumptions: Capacity: 9600kW 9.6 MW, Thus over the month Capacity * 720 hours per month = 6912 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 1844 | 19.21% | Issued | 01/04/2018 | | | 2583 | 26.91% | Issued | 01/03/2018 | | | 2784 | 29.00% | Issued | 01/02/2018 | | | 2018 | 21.02% | Issued | 01/01/2018 | | | 2821 | 29.39% | Issued | 01/12/2017 | | | 1981 | 20.64% | Issued | 01/11/2017 | | | 1925 | 20.05% | Issued | 01/10/2017 | | | 3032 | 31.58% | Retired | 01/09/2017 | | | 1619 | 16.86% | Retired | 01/08/2017 | | | 1773 | 18.47% | Retired | 01/07/2017 | | | 1798 | 18.73% | Retired | 01/07/2017 | | | 57 | 0.59% | Issued | 01/06/2017 | | | 2577 | 26.84% | Retired | 01/05/2017 | | | 1916 | 19.96% | Issued | 01/04/2017 | | | 2110 | 21.98% | Issued | 01/03/2017 | | | 2594 | 27.02% | Redeemed | 01/02/2017 | | | 2451 | 25.53% | Redeemed | 01/01/2017 | | | 1937 | 20.18% | Redeemed | Dec-16 | 0 | 2756 | 3062 | 31.90% | Issued | Nov-16 | 0 | 1403 | 1559 | 16.24% | Issued | Oct-16 | 0 | 1569 | 1743 | 18.16% | Issued | Oct-16 | 0 | 0 | 1743 | 18.16% | Issued | Sep-16 | 0 | 2057 | 2285 | 23.80% | Issued | Aug-16 | 0 | 1475 | 1639 | 17.07% | Issued | Jul-16 | 0 | 1527 | 1697 | 17.68% | Issued | Jul-16 | 0 | 1527 | 1697 | 17.68% | Issued | Jun-16 | 0 | 934 | 1044 | 10.88% | Issued | May-16 | 0 | 1520 | 1689 | 17.59% | Issued | Apr-16 | 0 | 1304 | 1449 | 15.09% | Issued | Mar-16 | 0 | 41 | 46 | 0.48% | Issued |
|
Capacity: 25.25 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|