Loading
Page views this IP this session = 1 of 10 unsubscribed pagesDarracott Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Darracott Wind Farm (Wind , Active) Location in the UK : England, Great Torrington Type of installation: Wind on/offshore: on Turbines :3 Capacity : 2.55 MW Approx Date of 1st power generation: May 2011
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Higher Darracott Wind Farm, situated near Great Torrington, Devon is expected to generate enough clean electricity to power over 1,300 homes.
Model: |
Gamesa G58
|
Start Speed: |
6
|
Capacity: |
0.85
|
Optimal Speed: |
13
|
Rotor Diameter: |
58
|
Stop Speed: |
24
|
Hub Height |
50 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
http://www.gamesacorp.com/en/products-and-services/gamesa-g58-850-kw-en.html |
Comment: |
|
Darracott Moor Windfarm nr Great Torrington EX38 7HL England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Darracott Moor 2.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Devon Country: England LPA: North Devon District Council
|
Site ID and Reference: |
3450 / N00111W
District:
|
Applicant: |
Gresham House
Application :
1/1345/2002/24
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
0.84999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.55 |
Site Address: |
Torrington, Devon, EX38
|
|
|
County: |
Devon Region: South West
|
OS Coordinates: |
223500 / 223500
|
Development Status: |
Operational
|
Application Submitted: |
7/18/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
2/25/2003
|
Construction Date: |
10/1/2006
|
|
|
Generator Live |
5/6/2011
|
This Record Last Updated: |
6/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
2/25/2003 |
Site Name: |
Darracott Moor Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00256RQEN
|
Capacity: |
2550
|
Status: |
Live
|
Accreditation Date: |
7/18/2002
|
|
|
Commission Date: |
5/2/2011
|
|
|
Applicant: |
WIND ENERGY RENEWABLES LLP
|
Applicant Address: |
Time Investments
6th Floor
Euston Road
LONDON
NW1 3BG
England
|
Address: |
Darracott Moor Windfarm
nr Great Torrington
EX38 7HL
England
|
Site Name: |
Darracott Moor Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01848NWEN
|
Capacity: |
2550
|
Status: |
Live
|
Accreditation Date: |
7/18/2002
|
|
|
Commission Date: |
5/2/2011
|
|
|
Applicant: |
WIND ENERGY RENEWABLES LLP
|
Applicant Address: |
Time Investments
6th Floor
Euston Road
LONDON
NW1 3BG
England
|
Address: |
Darracott Moor Windfarm
nr Great Torrington
EX38 7HL
England
|
|
Assumptions: Capacity: 2550kW 2.55 MW, Thus over the month Capacity * 720 hours per month = 1836 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 458 | 17.96% | Issued | 01/03/2018 | | | 582 | 22.82% | Issued | 01/02/2018 | | | 546 | 21.41% | Issued | 01/01/2018 | | | 801 | 31.41% | Issued | 01/12/2017 | | | 580 | 22.75% | Issued | 01/11/2017 | | | 463 | 18.16% | Issued | 01/10/2017 | | | 428 | 16.78% | Issued | 01/09/2017 | | | 425 | 16.67% | Issued | 01/08/2017 | | | 266 | 10.43% | Issued | 01/07/2017 | | | 181 | 7.10% | Issued | 01/06/2017 | | | 388 | 15.22% | Issued | 01/05/2017 | | | 346 | 13.57% | Issued | 01/04/2017 | | | 221 | 8.67% | Issued | 01/03/2017 | | | 659 | 25.84% | Redeemed | 01/02/2017 | | | 586 | 22.98% | Redeemed | 01/01/2017 | | | 519 | 20.35% | Redeemed | Dec-16 | 0 | 410 | 410 | 16.08% | Issued | Nov-16 | 0 | 429 | 429 | 16.82% | Issued | Oct-16 | 0 | 367 | 367 | 14.39% | Issued | Sep-16 | 0 | 338 | 338 | 13.25% | Issued | Aug-16 | 0 | 350 | 350 | 13.73% | Issued | Jul-16 | 0 | 252 | 254 | 9.96% | Issued | Jul-16 | 0 | 252 | 254 | 9.96% | Issued | Jun-16 | 0 | 192 | 194 | 7.61% | Issued | Jun-16 | 0 | 192 | 194 | 7.61% | Issued | May-16 | 0 | 292 | 294 | 11.53% | Issued | Apr-16 | 0 | 446 | 446 | 17.49% | Issued | Mar-16 | 0 | 506 | 506 | 19.84% | Redeemed | Feb-16 | 0 | 489 | 489 | 19.18% | Redeemed | Jan-16 | 0 | 816 | 816 | 32.00% | Redeemed | Dec-15 | 0 | 935 | 935 | 36.67% | Redeemed | Nov-15 | 0 | 687 | 687 | 26.94% | Redeemed | Oct-15 | 0 | 233 | 235 | 9.22% | Redeemed | Sep-15 | 0 | 332 | 332 | 13.02% | Redeemed | Aug-15 | 0 | 238 | 240 | 9.41% | Redeemed | Jul-15 | 390 | 391 | 391 | 15.33% | Redeemed | Jun-15 | 233 | 234 | 2 | 0.08% | Redeemed | May-15 | 458 | 459 | 1 | 0.04% | Redeemed | Apr-15 | 336 | 337 | 336 | 13.18% | Redeemed | Mar-15 | 432 | 433 | 433 | 16.98% | Redeemed | Feb-15 | 412 | 413 | 1 | 0.04% | Redeemed | Jan-15 | 770 | 771 | 770 | 30.20% | Redeemed | Dec-14 | 721 | 722 | 1 | 0.04% | Redeemed | Nov-14 | 312 | 314 | 312 | 12.24% | Redeemed | Oct-14 | 445 | 445 | 445 | 17.45% | Redeemed | Sep-14 | 167 | 167 | 167 | 6.55% | Redeemed | Aug-14 | 252 | 252 | 2 | 0.08% | Redeemed | Jul-14 | 171 | 170 | 171 | 6.71% | Redeemed | Jun-14 | 180 | 180 | 3 | 0.12% | Redeemed | May-14 | 346 | 347 | 346 | 13.57% | Redeemed | Apr-14 | 302 | 301 | 1 | 0.04% | Redeemed | Mar-14 | 409 | 411 | 411 | 16.12% | Redeemed | Feb-14 | 639 | 639 | 639 | 25.06% | Redeemed | Jan-14 | 560 | 561 | 560 | 21.96% | Redeemed | Dec-13 | 576 | 578 | 1 | 0.04% | Expired | Nov-13 | 389 | 389 | 390 | 15.29% | Redeemed | Oct-13 | 556 | 558 | 556 | 21.80% | Redeemed | Sep-13 | 326 | 326 | 326 | 12.78% | Redeemed | Aug-13 | 218 | 219 | 218 | 8.55% | Redeemed | Jul-13 | 190 | 189 | 191 | 7.49% | Redeemed | Jun-13 | 344 | 345 | 344 | 13.49% | Redeemed | May-13 | 219 | 220 | 219 | 8.59% | Redeemed | Apr-13 | 451 | 450 | 451 | 17.69% | Redeemed | Mar-13 | 348 | 348 | 352 | 13.80% | Redeemed | Feb-13 | 518 | 519 | 519 | 20.35% | Redeemed | Jan-13 | 540 | 542 | 542 | 21.25% | Redeemed | Dec-12 | 616 | 617 | 617 | 24.20% | Redeemed | Nov-12 | 225 | 225 | 227 | 8.90% | Redeemed | Oct-12 | 422 | 424 | 424 | 16.63% | Redeemed | Sep-12 | 314 | 315 | 1 | 0.04% | Redeemed | Aug-12 | 369 | 371 | 368 | 14.43% | Redeemed | Jul-12 | 281 | 282 | 281 | 11.02% | Redeemed | Jun-12 | 517 | 518 | 1 | 0.04% | Redeemed | May-12 | 292 | 292 | 3 | 0.12% | Redeemed | Apr-12 | 512 | 513 | 513 | 20.12% | Redeemed | Mar-12 | 359 | 361 | 361 | 14.16% | Redeemed | Feb-12 | 347 | 348 | 348 | 13.65% | Redeemed | Jan-12 | 701 | 702 | 702 | 27.53% | Redeemed | Dec-11 | 827 | 828 | 828 | 32.47% | Redeemed | Nov-11 | 515 | 516 | 516 | 20.24% | Redeemed | Oct-11 | 576 | 578 | 578 | 22.67% | Redeemed | Sep-11 | 469 | 470 | 470 | 18.43% | Redeemed | Aug-11 | 172 | 172 | 13 | 0.51% | Revoked | Jul-11 | 234 | 234 | 237 | 9.29% | Redeemed | Jun-11 | 293 | 294 | 294 | 11.53% | Redeemed | May-11 | 225 | 225 | 229 | 8.98% | Redeemed |
|
Capacity: 1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|