Page views this IP this session = 1 of 10 unsubscribed pagesHook Moor Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Hook Moor Wind Farm (Wind , Active) Location in the UK : England, Garforth Type of installation: Wind on/offshore: on Turbines :5 Capacity : 15 MW Approx Date of 1st power generation: January 2016
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Planning permission granted at public inquiry on 11 October 2011, decision issued 9 December 2011.
Model: |
Senvion MM92
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
12
|
Rotor Diameter: |
92
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:80
|
Avg. Elevation: |
64
|
Web Page: |
http://www.repower.de/wind-power-solutions/wind-turbines/5m/ |
Comment: |
The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.
|
Hook Moor Wind Farm Collier Lane Aberford Leeds LS25 3EB England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hook Moor 10.3 MW
|
Energy Type: |
Wind Onshore |
County: |
West Yorkshire Country: England LPA: Leeds City Council
|
Site ID and Reference: |
4658 / EN00422
District:
|
Applicant: |
Banks Renewables
Application :
08/01118/FU
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
125 |
Calculated capacity: |
6.15 |
Site Address: |
Land at Hook Moor
, Micklefield
, Leeds
|
|
|
County: |
West Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
443851 / 443851
|
Development Status: |
Operational
|
Application Submitted: |
2/26/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
8/4/2009
|
Construction Date: |
3/11/2015
|
|
|
Generator Live |
1/15/2016
|
This Record Last Updated: |
2/26/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
8/4/2009 |
Site Name: |
Hook Moor Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00363RQEN
|
Capacity: |
9871
|
Status: |
Live
|
Accreditation Date: |
2/26/2008
|
|
|
Commission Date: |
11/18/2015
|
|
|
Applicant: |
Banks Renewables (Hook Moor Wind Farm) Ltd
|
Applicant Address: |
Inkerman House
St Johns Road
Meadowfield
DURHAM
DH7 8XL
England
|
Address: |
Hook Moor Wind Farm
Collier Lane
Aberford
Leeds
LS25 3EB
England
|
Site Name: |
Hook Moor Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02885NWEN
|
Capacity: |
9871
|
Status: |
Live
|
Accreditation Date: |
2/26/2008
|
|
|
Commission Date: |
11/18/2015
|
|
|
Applicant: |
Banks Renewables (Hook Moor Wind Farm) Ltd
|
Applicant Address: |
Inkerman House
St Johns Road
Meadowfield
DURHAM
DH7 8XL
England
|
Address: |
Hook Moor Wind Farm
Collier Lane
Aberford
Leeds
LS25 3EB
England
|
|
Assumptions: Capacity: 9871kW 9.871 MW, Thus over the month Capacity * 720 hours per month = 7107.12 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 2314 | 23.44% | Issued | 01/03/2018 | | | 2815 | 28.52% | Issued | 01/02/2018 | | | 2207 | 22.36% | Issued | 01/01/2018 | | | 3342 | 33.86% | Issued | 01/12/2017 | | | 3434 | 34.79% | Issued | 01/11/2017 | | | 2723 | 27.59% | Issued | 01/11/2017 | | | 107 | 1.08% | Issued | 01/10/2017 | | | 3297 | 33.40% | Issued | 01/09/2017 | | | 1868 | 18.92% | Issued | 01/08/2017 | | | 1983 | 20.09% | Issued | 01/07/2017 | | | 1768 | 17.91% | Issued | 01/06/2017 | | | 2488 | 25.21% | Issued | 01/05/2017 | | | 1963 | 19.89% | Issued | 01/04/2017 | | | 1990 | 20.16% | Issued | 01/03/2017 | | | 2539 | 25.72% | Redeemed | 01/02/2017 | | | 2544 | 25.77% | Redeemed | 01/01/2017 | | | 2072 | 20.99% | Redeemed | Dec-16 | 0 | 1796 | 1995 | 20.21% | Issued | Nov-16 | 0 | 2037 | 2264 | 22.94% | Issued | Oct-16 | 0 | 1493 | 1659 | 16.81% | Issued | Sep-16 | 0 | 1353 | 1504 | 15.24% | Issued | Aug-16 | 0 | 628 | 1260 | 12.76% | Revoked | Jul-16 | 0 | 1621 | 1801 | 18.25% | Issued | Jul-16 | 0 | 1621 | 1801 | 18.25% | Issued | Jun-16 | 0 | 1072 | 1192 | 12.08% | Issued | May-16 | 0 | 1827 | 2031 | 20.58% | Issued | Apr-16 | 0 | 1833 | 2037 | 20.64% | Issued | Mar-16 | 0 | 1766 | 1962 | 19.88% | Issued | Feb-16 | 0 | 2435 | 2705 | 27.40% | Issued | Jan-16 | 0 | 2811 | 3124 | 31.65% | Issued | Dec-15 | 0 | 3544 | 107 | 1.08% | Revoked | Nov-15 | 0 | 407 | 456 | 4.62% | Pending Tr |
|
Capacity: 30 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/25/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|