Loading
Page views this IP this session = 1 of 10 unsubscribed pagesKingspan Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Kingspan Wind Farm (Wind , Active) Location in the UK : Wales, flintshire Type of installation: Wind on/offshore: on Turbines :2 Capacity : 1.8 MW Approx Date of 1st power generation: January 2019
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Wind Direct are proposing to develop two wind turbines at Kingspan’s Holywell site, which would add to the company’s current portfolio of energy saving and environmentally sustainable activities.
Model: |
aa 2mw turbine
|
Start Speed: |
5
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
6
|
Web Page: |
|
Comment: |
For proposed projects where turbine yet to be agreed
|
Relationship |
Company (For:
Kingspan
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Kingspan 1.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Flintshire Country: Wales LPA: Flintshire County Council
|
Site ID and Reference: |
4790 /
District:
|
Applicant: |
Kingspan
Application :
52922
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
0.90000000000000002 |
Height of Turbines: |
78 |
Calculated capacity: |
1.8 |
Site Address: |
Kingspan Ltd, 2-4 Bagillt Road, Greenfield, Holywell
|
|
CH8 7GJ
|
County: |
Flintshire Region: Wales
|
OS Coordinates: |
320053 / 320053
|
Development Status: |
Operational
|
Application Submitted: |
11/19/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
3/19/2018
|
|
|
Generator Live |
1/11/2019
|
This Record Last Updated: |
1/22/2019
|
RO Banding (ROC/MWh) |
0.9
|
FiT Tariff (p/kWh): |
3
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
4/14/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 3.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|