Ark Hill Wind Farm (Wind , Active) Location in the UK : Scotland, forfar Type of installation: Wind on/offshore: on Turbines :8 Capacity : 6.4 MW Approx Date of 1st power generation: March 2013
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Ark Hill Wind Farm, developed by RES, was consented by Angus Council in February 2009. RES sold the project to Greencat Renewables and Ark Hill Wind farm became operational in March 2013.
Model: |
Enercon E48
|
Start Speed: |
5
|
Capacity: |
0.8
|
Optimal Speed: |
15
|
Rotor Diameter: |
48
|
Stop Speed: |
25
|
Hub Height |
50 Avg for all turbines:50
|
Avg. Elevation: |
287
|
Web Page: |
http://www.enercon.de/en-en/492.htm |
Comment: |
Hub height: 50 m / 55 m / 60 m / 76 m
Stated as being ideal machine for any site
|
Ark Hill Wind Farm Chamberwells Farm Glenogilvy Forfar DD8 1UP Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Ark Hill 6.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Tayside Country: Scotland LPA: Angus Council
|
Site ID and Reference: |
4062 / S0046W3
District:
|
Applicant: |
Green Cat Renewables
Application :
03/00831/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
8 |
Turbine Capacity: |
0.80000000000000004 |
Height of Turbines: |
|
Calculated capacity: |
6.4 |
Site Address: |
Chamberwells, Glamis, Tayside
|
|
|
County: |
Tayside Region: Scotland
|
OS Coordinates: |
335700 / 335700
|
Development Status: |
Operational
|
Application Submitted: |
7/7/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/17/2012
|
|
|
Generator Live |
3/29/2013
|
This Record Last Updated: |
12/18/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Ark Hill Wind Farm
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00204SQSC
|
Capacity: |
6256
|
Status: |
Live
|
Accreditation Date: |
7/7/2003
|
|
|
Commission Date: |
3/5/2013
|
|
|
Applicant: |
Ark Hill Wind Farm Ltd
|
Applicant Address: |
Covington Mill Farm
Thankerton
BIGGAR
ML12 6NE
Scotland
|
Address: |
Ark Hill Wind Farm
Chamberwells Farm
Glenogilvy
Forfar
DD8 1UP
Scotland
|
Capacity: 12.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/1/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Defford Aerodrome solar farm
Date and Time of entry: Monday, December 30, 2024 00:00
Croome : Huge solar farm approved in Defford near Pershore amid concerns A PLAN to build a solar farm on a former airfield was backed by councillors amid concerns it would damage views from one of the county’s most historic parks. Date and Time of entry: Monday, December 30, 2024 00:00
Power plant profile: Hatherden Solar PV Park, UK Hatherden Solar PV Park is a 49.9MW solar PV power project. It is planned in England, the UK. Date and Time of entry: Monday, December 30, 2024 00:00
Campaigners step up opposition to solar farm Residents near Darlington, County Durham, are opposed to the planned Byers Gill Solar Farm, which could power 70,000 homes if approved. Source: bbc, Date and Time of entry: Monday, December 30, 2024 00:00
Turbine installation underway at Scots wind farm
Source: renews, Date and Time of entry: Sunday, December 29, 2024 00:00
|
|