Glenkerie Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Glenkerie Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Peebles    
Type of installation: Wind    on/offshore: on
Turbines :11  Capacity : 22 MW
Approx Date of 1st power generation: Feb 2012

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Glenkerie wind farm in the Scottish Borders has an installed capacity of 22MW and has been generating since February 2012.
Infinis received a CEEQUAL Whole Project Award in July 2011 for Glenkerie wind farm

Originally proposed by Novera

 Turbine Make and Specs

Model: Vestas V80 Start Speed: 4
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 80 Stop Speed: 25
Hub Height 70   Avg for all turbines:70 Avg. Elevation: 446
Web Page:
Comment:

 Address

 Associated Companies.

Relationship Company (For: Glenkerie )
Developerinfinis
Operatorinfinis

 DECC Data on this Project: Glenkerie :3538

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Glenkerie Wind Farm Extension     15 MW
Energy Type: Wind Onshore
County: Borders     Country: Scotland     LPA: Scottish Borders Council
Site ID and Reference: 4578 / B0556     District:
Applicant: Muirhall Energy (formerly Infinis)     Application : 13/00552/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 15
Site Address: Kingledores Farm, Broughton, Biggar, Strathclyde
  ML12 6QL
County: Borders Region: Scotland
OS Coordinates: 310453 / 310453
Development Status: Planning Permission Expired
Application Submitted: 5/14/2013 Planning Permission Granted
Application Determined: Permission refused: 12/1/2014
Construction Date:    
Generator Live This Record Last Updated: 9/23/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 7/29/2018    
Secretary of State - Appeal Lodged: 3/5/2015
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 12/1/2014

Site Name: Glenkerie Wind Farm     22 MW
Energy Type: Wind Onshore
County: Borders     Country: Scotland     LPA: Scottish Borders Council
Site ID and Reference: 3538 / A0037     District:
Applicant: Novera Energy     Application : 07/02478/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 11 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 22
Site Address: Kingledores Farm, Broughton, Biggar, Strathclyde. ML12 6QL
 
County: Borders Region: Scotland
OS Coordinates: 310453 / 310453
Development Status: Operational
Application Submitted: 12/20/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/1/2011    
Generator Live 2/1/2012 This Record Last Updated: 3/6/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Glenkerie: Wind : -na-

 Calculations


Capacity: 44
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 44 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371544

Project Info
Infinis: GLENKERIE wind farm

GLENKERIE Wind Farm, Non technical Summary

Borders councillors reject GLENKERIE wind farm extension
Councillors have rejected plans for a six-turbine extension to a wind farm in the Scottish Borders.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School