Loading
Page views this IP this session = 1 of 10 unsubscribed pagesOvenden Moor Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Ovenden Moor Wind Farm (Wind , Active) Location in the UK : England, West Yorkshire Type of installation: Wind on/offshore: on Turbines :9 Capacity : 20.7 MW Approx Date of 1st power generation: January 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
12/00955/WDF | Repowering of wind farm including construction and operation of nine wind turbines (up to 115 metres to blade tip), construction of access tracks, crane hardstanding, temporary construction compound, underground cabling to network, new control building with substation and anemometer, to replace existing twenty three wind turbines, substation, control building and anemometer masts. | Ovenden Moor Windfarm Cold Edge Road Wainstalls Halifax Calderdale Ovenden Moor repowering will replace the 23 smaller turbines with 9 taller and moor effective turbines.
Completed with financial assistance from the European Union under its Thermie programme, which aimed to support the development of green technologies.
Model: |
Gamesa G80
|
Start Speed: |
6
|
Capacity: |
2
|
Optimal Speed: |
13
|
Rotor Diameter: |
80
|
Stop Speed: |
21
|
Hub Height |
75 Avg for all turbines:75
|
Avg. Elevation: |
433
|
Web Page: |
http://www.gamesacorp.com/recursos/doc/productos-servicios/aerogeneradores/catalogo-g9x-20-mw-eng.pdf |
Comment: |
|
Ovenden Moor Wind farm Cold Edge Road Ovenden Halifax West Yorkshire England
Relationship |
Company (For:
Ovenden Moor
) |
Operator | E.on UK | Installer | E.on UK |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Ovenden Moor (Repower) 18 MW
|
Energy Type: |
Wind Onshore |
County: |
West Yorkshire Country: England LPA: Calderdale Metropolitan Borough Council
|
Site ID and Reference: |
4408 / B0593
District:
|
Applicant: |
Yorkshire Windpower
Application :
12/00955/WDF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
115 |
Calculated capacity: |
22.5 |
Site Address: |
Withens Road, Wainstalls, Halifax,
|
|
|
County: |
West Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
404000 / 404000
|
Development Status: |
Operational
|
Application Submitted: |
8/2/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/21/2015
|
|
|
Generator Live |
1/24/2017
|
This Record Last Updated: |
2/2/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Ovenden Moor (Repower) 23 MW
|
Energy Type: |
Wind Onshore |
County: |
West Yorkshire Country: England LPA: Calderdale Metropolitan Borough Council
|
Site ID and Reference: |
3993 / EN00641
District:
|
Applicant: |
Yorkshire Windpower
Application :
09/00073/WDF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
23 |
Site Address: |
Withens Road, Wainstalls, Halifax,
|
|
|
County: |
West Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
404000 / 404000
|
Development Status: |
Revised
|
Application Submitted: |
3/25/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
11/16/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
4/23/2012 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Ovenden Moor WF
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00401RQEN
|
Capacity: |
18000
|
Status: |
Live
|
Accreditation Date: |
3/25/2009
|
|
|
Commission Date: |
1/24/2017
|
|
|
Applicant: |
Yorkshire Windpower Ltd
|
Applicant Address: |
c/o Powergen Renewables Ltd
Westwood Way
Westwood Business Park Coventry
CV4 8LG
|
Address: |
Cold Edge Road
Wainstalls
Halifax
HX2 7UA
England
|
Site Name: |
Ovenden Moor WF
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02998NWEN
|
Capacity: |
18000
|
Status: |
Live
|
Accreditation Date: |
3/25/2009
|
|
|
Commission Date: |
1/24/2017
|
|
|
Applicant: |
Yorkshire Windpower Ltd
|
Applicant Address: |
c/o Powergen Renewables Ltd
Westwood Way
Westwood Business Park Coventry
CV4 8LG
|
Address: |
Cold Edge Road
Wainstalls
Halifax
HX2 7UA
England
|
|
Assumptions: Capacity: 18000kW 18 MW, Thus over the month Capacity * 720 hours per month = 12960 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 4591 | 25.51% | Issued | 01/02/2018 | | | 5410 | 30.06% | Issued | 01/01/2018 | | | 6640 | 36.89% | Issued | 01/12/2017 | | | 6560 | 36.44% | Issued | 01/11/2017 | | | 5770 | 32.06% | Issued | 01/10/2017 | | | 7202 | 40.01% | Issued | 01/09/2017 | | | 3895 | 21.64% | Issued | 01/08/2017 | | | 1524 | 8.47% | Issued | 01/07/2017 | | | 1165 | 6.47% | Issued | 01/06/2017 | | | 2279 | 12.66% | Issued | 01/05/2017 | | | 2877 | 15.98% | Issued | 01/04/2017 | | | 3764 | 20.91% | Issued | 01/03/2017 | | | 4556 | 25.31% | Redeemed | 01/02/2017 | | | 2458 | 13.66% | Redeemed | 01/01/2017 | | | 357 | 1.98% | Issued |
|
Capacity: 41.4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 21 m/s (46.977 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|