Sorry I found no matches, Please try again. 176
vid = 307pws_id = 351987pws_id = 351987
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.141.2.191 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Parc-Cynog Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Parc-Cynog Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Carmarthenshire    
Type of installation: Wind    on/offshore: on
Turbines :11  Capacity : 8.4 MW
Approx Date of 1st power generation: Feb 2001 / Nov 2009

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

An additional 4.8MW of Installed Capacity has been added to the 3.6MW already operational, with a combined maximum output of 8.4MW.

 Turbine Make and Specs

Model: Enercon E48 Start Speed: 5
Capacity: 0.8 Optimal Speed: 15
Rotor Diameter: 48 Stop Speed: 25
Hub Height 0   Avg for all turbines:0 Avg. Elevation: 152
Web Page: http://www.enercon.de/en-en/492.htm
Comment: Hub height: 50 m / 55 m / 60 m / 76 m Stated as being ideal machine for any site

 Address

Parc-Cynog Pendine Carmarthenshire Pendine SA33 4PY Wales

 Associated Companies.

Relationship Company (For: Parc-Cynog )
OwnerVattenfall
OperatorVattenfall
DeveloperVattenfall

 DECC Data on this Project: Parc-Cynog :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Parc Cynog Extension     8.4 MW
Energy Type: Wind Onshore
County: Dyfed     Country: Wales     LPA: Carmarthenshire County Council
Site ID and Reference: 2950 / EN00174     District:
Applicant: Nuon     Application : W/12246 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 7.8
Site Address: Parc Cynog, Pendine, Carms
 
County: Dyfed Region: Wales
OS Coordinates: 225230 / 225230
Development Status: Operational
Application Submitted: 2/2/2006 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 11/1/2009 This Record Last Updated: 11/2/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Parc-Cynog Wind Farm     3.6 MW
Energy Type: Wind Onshore
County: Dyfed     Country: Wales     LPA: Carmarthenshire County Council
Site ID and Reference: 2636 / 10019W3     District:
Applicant: Micon Wind Turbines (UK) Limited     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 0.69999999999999996
Height of Turbines: Calculated capacity: 3.5
Site Address: Parc-Cynog Farm Pendine Carmarthenshire
 
County: Dyfed Region: Wales
OS Coordinates: 225500 / 225500
Development Status: Operational
Application Submitted: 5/5/1998 Planning Permission Granted
Application Determined: Permission refused: 2/1/2000
Construction Date:    
Generator Live 2/1/2001 This Record Last Updated: 10/30/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 2/1/2000

 OFGEM Data on this Project: Parc-Cynog: Wind :

Site Name: Pendine Wind Farm Limited
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00186RQWA
Capacity: 4800 Status: Live
Accreditation Date: 5/5/1998    
Commission Date: 6/15/2009    
Applicant: Pendine Wind Farm Limited
Applicant Address: Abbey Warehouse Abbey Slip Penzance TR18 4AR England
Address: Parc Cynog Farm Pendine SA33 4PY Wales

Site Name: Pendine Wind Farm Limited
Generator Type: Wind
Scheme : REGO Generator ID: G01343NWWA
Capacity: 4800 Status: Live
Accreditation Date: 5/5/1998    
Commission Date: 6/15/2009    
Applicant: Pendine Wind Farm Limited
Applicant Address: Abbey Warehouse Abbey Slip Penzance TR18 4AR England
Address: Parc Cynog Farm Pendine SA33 4PY Wales
 
Assumptions: Capacity: 4800kW 4.8 MW,
Thus over the month Capacity * 720 hours per month = 3456 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 1272 26.50% Issued
01/02/2018 1271 26.48% Issued
01/01/2018 1747 36.40% Issued
01/12/2017 1479 30.81% Issued
01/11/2017 1167 24.31% Issued
01/10/2017 1446 30.13% Issued
01/09/2017 1172 24.42% Issued
01/08/2017 845 17.60% Issued
01/07/2017 698 14.54% Issued
01/06/2017 1037 21.60% Issued
01/05/2017 747 15.56% Issued
01/04/2017 737 15.35% Issued
01/03/2017 1333 27.77% Redeemed
01/02/2017 1334 27.79% Redeemed
01/01/2017 1137 23.69% Redeemed
Dec-16 0889 889 18.52% Issued
Nov-16 01057 1057 22.02% Issued
Oct-16 0801 801 16.69% Issued
Sep-16 01159 1159 24.15% Issued
Aug-16 0851 851 17.73% Issued
Jul-16 0745 745 15.52% Issued
Jun-16 0576 576 12.00% Issued
Jun-16 0576 576 12.00% Issued
May-16 0752 752 15.67% Issued
May-16 0752 752 15.67% Issued
Apr-16 01004 1004 20.92% Issued
Mar-16 01002 1002 20.88% Issued
Feb-16 01395 1395 29.06% Issued
Jan-16 01759 1759 36.65% Issued
Dec-15 02349 2349 48.94% Redeemed
Nov-15 01800 1800 37.50% Redeemed
Oct-15 0874 874 18.21% Redeemed
Sep-15 0751 751 15.65% Redeemed
Aug-15 0951 951 19.81% Redeemed
Jul-15 10531053 1053 21.94% Redeemed
Jun-15 834834 834 17.38% Redeemed
May-15 11991200 1200 25.00% Redeemed
Apr-15 876876 876 18.25% Redeemed
Mar-15 14201420 1420 29.58% Redeemed
Feb-15 11921191 1191 24.81% Redeemed
Jan-15 17741775 1775 36.98% Redeemed
Dec-14 17111711 1711 35.65% Redeemed
Nov-14 12401240 241 5.02% Redeemed
Oct-14 15951595 1595 33.23% Expired
Sep-14 396396 396 8.25% Expired
Aug-14 990990 990 20.63% Expired
Jul-14 547546 546 11.38% Expired
Jun-14 622623 623 12.98% Expired
May-14 820819 819 17.06% Expired
Apr-14 760760 760 15.83% Expired
Mar-14 11671167 1167 24.31% Expired
Feb-14 20042004 2004 41.75% Expired
Jan-14 16891689 1689 35.19% Expired
Dec-13 17741774 1774 36.96% Expired
Nov-13 10391039 1 0.02% Expired
Oct-13 15781578 1578 32.88% Redeemed
Sep-13 588588 587 12.23% Redeemed
Aug-13 744744 744 15.50% Redeemed
Jul-13 508508 508 10.58% Redeemed
Jun-13 949948 948 19.75% Redeemed
May-13 13751375 1375 28.65% Redeemed
Apr-13 13151315 1315 27.40% Redeemed
Mar-13 10241025 1025 21.35% Expired
Feb-13 11051105 1105 23.02% Expired
Jan-13 13241324 1324 27.58% Expired
Dec-12 15131513 1513 31.52% Expired
Nov-12 11291129 1129 23.52% Expired
Oct-12 10391038 1038 21.63% Expired
Sep-12 942942 848 17.67% Expired
Aug-12 11881188 1188 24.75% Expired
Jul-12 7730 773 16.10% Expired
Jun-12 11911192 1192 24.83% Expired
May-12 658659 659 13.73% Expired
Apr-12 12361236 1236 25.75% Expired
Mar-12 8130 814 16.96% Expired
Feb-12 882882 1 0.02% Expired
Jan-12 15671567 1565 32.60% Redeemed
Dec-11 20542054 2054 42.79% Redeemed
Nov-11 15741574 1574 32.79% Redeemed
Oct-11 15911590 1590 33.13% Redeemed
Sep-11 13741375 1375 28.65% Redeemed
Aug-11 695695 695 14.48% Redeemed
Jul-11 777777 777 16.19% Redeemed
Jun-11 944944 944 19.67% Redeemed
May-11 15251525 4 0.08% Expired
Apr-11 774774 774 16.13% Redeemed
Mar-11 607607 607 12.65% Expired
Feb-11 13171316 1316 27.42% Expired
Jan-11 10141015 1015 21.15% Redeemed
Dec-10 858857 857 17.85% Redeemed
Nov-10 11281129 1129 23.52% Redeemed

 Calculations


Capacity: 16.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 16.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351987

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School