Sorry I found no matches, Please try again. 176
vid = 3129pws_id = 350179pws_id = 350179
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.59.167 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Crockbaravally Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Crockbaravally Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, Crockbaravally    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 6.9 MW
Approx Date of 1st power generation: February 2017

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

(From TCI)The proposed development consists of three wind turbines up to 99.5m in height,
each of which will generate up to 2.3 megawatts of electricity. Other infrastructure
will include: underground cabling, access tracks, a temporary site storage
compound, site entrance works at Whitebridge Road, a substation and other
ancillary equipment to operate a small wind farm.

 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 65   Avg for all turbines:65 Avg. Elevation: 209
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

Crockbaravally Wind farm Whitebridge Road Sixmilecross BT79 9EW Northern Ireland

 Associated Companies.

Relationship Company (For: Crockbaravally )
DeveloperTCI Renewables
OwnerTCI Renewables

 DECC Data on this Project: Crockbaravally :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Crockbaravally Wind Farm     7.5 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 4255 / EN00637     District:
Applicant: Golden Square Energy     Application : K/2008/1153/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 7.5
Site Address: Whitebridge Road Sixmilecross, Co. Tyrone BT79 9EH
 
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 73750 / 73750
Development Status: Operational
Application Submitted: 1/2/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/1/2016    
Generator Live 2/24/2017 This Record Last Updated: 4/26/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 3/5/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Crockbaravally: Wind :

Site Name: Crockbaravally Wind Farm Limited
Generator Type: On-shore wind (NIRO code = NQ)
Scheme : RO Generator ID: R01058NQNI
Capacity: 7425 Status: Live
Accreditation Date: 1/2/2009    
Commission Date: 2/24/2017    
Applicant: Crockbaravally Wind Farm Ltd
Applicant Address: 138 University Street BELFAST BT7 1HJ Northern Ireland
Address: Crockbaravally Wind farm Whitebridge Road Sixmilecross BT79 9EW Northern Ireland

Site Name: Crockbaravally Wind Farm Limited
Generator Type: Wind
Scheme : REGO Generator ID: G01026NWNI
Capacity: 7425 Status: Live
Accreditation Date: 1/2/2009    
Commission Date: 2/24/2017    
Applicant: Crockbaravally Wind Farm Ltd
Applicant Address: 138 University Street BELFAST BT7 1HJ Northern Ireland
Address: Crockbaravally Wind farm Whitebridge Road Sixmilecross BT79 9EW Northern Ireland
 
Assumptions: Capacity: 7425kW 7.425 MW,
Thus over the month Capacity * 720 hours per month = 5346 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 1098 14.79% Issued
01/03/2018 1701 22.91% Issued
01/02/2018 2021 27.22% Issued
01/01/2018 2674 36.01% Issued
01/12/2017 1850 24.92% Issued
01/11/2017 1561 21.02% Issued
01/10/2017 2076 27.96% Issued
01/09/2017 1700 22.90% Issued
01/08/2017 1135 15.29% Issued
01/07/2017 1079 14.53% Issued
01/06/2017 1295 17.44% Issued
01/05/2017 1031 13.89% Issued
01/04/2017 1260 16.97% Issued
01/03/2017 794 10.69% Issued

 Calculations


Capacity: 13.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/15/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 13.8 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 350179

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School