Broughshane Wind Farm (Wind , Active) Location in the UK : N.Ireland, BT43 7HR Type of installation: Wind on/offshore: on Turbines :11 Capacity : 22.7 MW Approx Date of 1st power generation: March 2018
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Enercon E70
|
Start Speed: |
4
|
Capacity: |
2.3
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
71
|
Stop Speed: |
31
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
242
|
Web Page: |
http://www.enercon.de/en-en/61.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
Elginny Hill/Coreen Hill Tullymore Road Broughshane BT43 7HR Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Rathsherry 21 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Antrim Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4558 / AA710
District:
|
Applicant: |
Energia (formerly Brookfield Renewable Energy Group)
Application :
G/2011/0162/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
20.7 |
Site Address: |
lands in the townland of Rathsherry, east of Tullymore Road and south and north of Longmore Road, Broughshane, Ballymena
|
|
|
County: |
Co. Antrim Region: Northern Ireland
|
OS Coordinates: |
132735 / 132735
|
Development Status: |
Operational
|
Application Submitted: |
4/11/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
12/15/2016
|
|
|
Generator Live |
2/15/2018
|
This Record Last Updated: |
2/23/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
3/26/2020 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Broughshane Wind Farm
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R01231NQNI
|
Capacity: |
22733.56
|
Status: |
Live
|
Accreditation Date: |
4/11/2011
|
|
|
Commission Date: |
2/18/2018
|
|
|
Applicant: |
Antrim Wind Energy Limited
|
Applicant Address: |
16 Eden Terrace
STRABANE
BT82 8EN
Northern Ireland
|
Address: |
Elginny Hill/Coreen Hill
Tullymore Road
Broughshane
BT43 7HR
Northern Ireland
|
Site Name: |
Broughshane Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01285NWNI
|
Capacity: |
22733.56
|
Status: |
Live
|
Accreditation Date: |
4/11/2011
|
|
|
Commission Date: |
2/18/2018
|
|
|
Applicant: |
Antrim Wind Energy Limited
|
Applicant Address: |
16 Eden Terrace
STRABANE
BT82 8EN
Northern Ireland
|
Address: |
Elginny Hill/Coreen Hill
Tullymore Road
Broughshane
BT43 7HR
Northern Ireland
|
|
Assumptions: Capacity: 22733.56kW 22.73356 MW, Thus over the month Capacity * 720 hours per month = 16368.1632 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 2448 | 10.77% | Issued | 01/03/2018 | | | 1450 | 6.38% | Issued | 01/02/2018 | | | 133 | 0.59% | Issued |
|
Capacity: 50.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/27/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|