Loading
Page views this IP this session = 1 of 10 unsubscribed pagesPark Wall Solar Farm
Park Wall Solar Farm (Solar , Active) Location in the UK : England, Bridgewater Type of installation: Solar on/offshore: on Solar Panels :25000 Capacity : 5 MW Acreage:20 or approx Hectares : 8 Approx Date of 1st power generation: March 2013
/YES
The solar farm consists of over 20,000 solar panels. The panels are placed on top of steel frames, which are piled into the ground in a similar fashion to a fencepost. The panel ‘tables’ are positioned at an angle of between 20º and 35º from the ground and have a height of no more than 3.5 m from the ground to the top of the panel table. Park Wall Westonzoyland Road Bridgewater Somerset TA7 0HY England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Park Wall Solar Park 5 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Somerset Country: England LPA: Sedgemoor District Council
|
Site ID and Reference: |
1103 / C1066
District:
|
Applicant: |
Application :
09/11/00010
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land to the east of M5 motorway, and south of A372, Westonzoyland Road, Bridgwater Without, Bridgwater
|
|
|
County: |
Somerset Region: South West
|
OS Coordinates: |
332133 / 332133
|
Development Status: |
Operational
|
Application Submitted: |
3/1/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2012
|
|
|
Generator Live |
3/21/2013
|
This Record Last Updated: |
4/15/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Park Wall Solar Farm
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00130RUEN
|
Capacity: |
3960
|
Status: |
Live
|
Accreditation Date: |
3/1/2011
|
|
|
Commission Date: |
3/28/2013
|
|
|
Applicant: |
Octopus Investments Limited
|
Applicant Address: |
6th Floor, 33 Holborn
London
EC1N 2HT
England
|
Address: |
Park Wall
Westonzoyland Road
Bridgewater
Somerset
TA7 0HY
England
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|