Page views this IP this session = 1 of 10 unsubscribed pagesBeatrice Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Beatrice Wind Farm (Wind , Active) Location in the UK : Scotland, Moray Firth. Type of installation: Wind on/offshore: off Turbines :84 Capacity : 10 MW Approx Date of 1st power generation: May 2019
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The Beatrice Wind Farm is the flagship project for offshore wind energy development in Scotland, the UK and Europe. The €41 million project aims to install two demonstrator wind turbines adjacent to the Beatrice oil field, 25 km off the east coast
of Scotland.
Model: |
Siemens SWT-7.0
|
Start Speed: |
0
|
Capacity: |
7
|
Optimal Speed: |
0
|
Rotor Diameter: |
154
|
Stop Speed: |
25
|
Hub Height |
120 Avg for all turbines:110
|
Avg. Elevation: |
0
|
Web Page: |
https://www.siemens.com/global/en/home/markets/wind/turbines-and-services/swt-7-0-154.html |
Comment: |
Siemens Gamesa
|
Beatrice Operations Focal Point Mid North Sea Dept Talisman House 163 Holburn Street Aberdeen AB10 6BZ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Beatrice 588 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
2521 / A0275
District:
|
Applicant: |
Scottish & Southern Energy (SSE) / Repsol / CIP
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
84 |
Turbine Capacity: |
7 |
Height of Turbines: |
|
Calculated capacity: |
588 |
Site Address: |
Offshore Scottish borders
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
344074 / 344074
|
Development Status: |
Operational
|
Application Submitted: |
4/25/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/2/2017
|
|
|
Generator Live |
8/5/2019
|
This Record Last Updated: |
5/31/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Beatrice Demonstrator 10 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
2485 / EN00028
District:
|
Applicant: |
Talisman Energy
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
5 |
Height of Turbines: |
|
Calculated capacity: |
10 |
Site Address: |
Beatrice Offshore Platform
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
347955 / 347955
|
Development Status: |
Operational
|
Application Submitted: |
1/23/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/1/2006
|
|
|
Generator Live |
7/17/2007
|
This Record Last Updated: |
5/31/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Beatrice Offshore Windfarm
|
Generator Type: |
Off-shore wind (ROS code = SP)
|
Scheme : |
RO
|
Generator ID: |
R00001SPSC
|
Capacity: |
10000
|
Status: |
Live
|
Accreditation Date: |
1/23/2006
|
|
|
Commission Date: |
5/8/2007
|
|
|
Applicant: |
REPSOL SINOPEC RESOURCES UK LIMITED
|
Applicant Address: |
talisman House
163 Holbourn Street
Aberdeen
AB10 6BZ
Scotland
|
Address: |
Beatrice Operations Focal Point
Mid North Sea Dept
Talisman House 163 Holburn Street
Aberdeen
AB10 6BZ
Scotland
|
Site Name: |
Beatrice Offshore Windfarm
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G00002FWSC
|
Capacity: |
10000
|
Status: |
Live
|
Accreditation Date: |
1/23/2006
|
|
|
Commission Date: |
5/8/2007
|
|
|
Applicant: |
REPSOL SINOPEC RESOURCES UK LIMITED
|
Applicant Address: |
talisman House
163 Holbourn Street
Aberdeen
AB10 6BZ
Scotland
|
Address: |
Beatrice Operations Focal Point
Mid North Sea Dept
Talisman House 163 Holburn Street
Aberdeen
AB10 6BZ
Scotland
|
|
Assumptions: Capacity: 10000kW 10 MW, Thus over the month Capacity * 720 hours per month = 7200 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Jan-15 | 95 | 118 | 95 | 0.95% | Redeemed | Dec-14 | 16 | 0 | 16 | 0.16% | Redeemed | Nov-14 | 863 | 1264 | 863 | 8.63% | Redeemed | Oct-14 | 1579 | 2352 | 1578 | 15.78% | Redeemed | Sep-14 | 1364 | 2033 | 1365 | 13.65% | Redeemed | Aug-14 | 2253 | 3380 | 2253 | 22.53% | Redeemed | Jul-14 | 1514 | 2254 | 1513 | 15.13% | Redeemed | Jun-14 | 1253 | 1866 | 1253 | 12.53% | Redeemed | May-14 | 1737 | 2588 | 1737 | 17.37% | Redeemed | Mar-14 | 546 | 776 | 546 | 5.46% | Redeemed | Feb-14 | 1577 | 2345 | 1577 | 15.77% | Redeemed | Jan-14 | 1602 | 2386 | 1601 | 16.01% | Redeemed | Dec-13 | 2011 | 3017 | 2011 | 20.11% | Redeemed | Nov-13 | 1955 | 2914 | 1955 | 19.55% | Redeemed | Oct-13 | 2231 | 3346 | 1 | 0.01% | Redeemed | Sep-13 | 1784 | 2675 | 1784 | 17.84% | Redeemed | Aug-13 | 1670 | 2492 | 1671 | 16.71% | Redeemed | Jul-13 | 1205 | 1790 | 1205 | 12.05% | Redeemed | Jun-13 | 495 | 716 | 495 | 4.95% | Redeemed | May-13 | 2002 | 3003 | 2002 | 20.02% | Redeemed | Apr-13 | 1928 | 2891 | 1928 | 19.28% | Redeemed | Mar-13 | 868 | 1274 | 868 | 8.68% | Redeemed | Feb-13 | 1608 | 2398 | 1608 | 16.08% | Redeemed | Jan-13 | 2900 | 4350 | 2900 | 29.00% | Redeemed | Dec-12 | 2130 | 3195 | 2130 | 21.30% | Redeemed | Nov-12 | 1847 | 2771 | 1847 | 18.47% | Redeemed | Oct-12 | 1968 | 2952 | 1968 | 19.68% | Redeemed | Sep-12 | 2753 | 4130 | 2753 | 27.53% | Redeemed | Aug-12 | 1377 | 2047 | 1376 | 13.76% | Redeemed | Jul-12 | 1015 | 1503 | 1015 | 10.15% | Redeemed | Jun-12 | 1195 | 1779 | 1195 | 11.95% | Redeemed | May-12 | 1050 | 1557 | 1050 | 10.50% | Redeemed | Apr-12 | 2343 | 3514 | 2343 | 23.43% | Redeemed | Mar-12 | 2303 | 3455 | 2303 | 23.03% | Redeemed | Feb-12 | 2128 | 3192 | 2128 | 21.28% | Redeemed | Jan-12 | 1293 | 1919 | 1294 | 12.94% | Redeemed | Dec-11 | 589 | 846 | 588 | 5.88% | Redeemed | Nov-11 | 2430 | 3645 | 2430 | 24.30% | Redeemed | Oct-11 | 3204 | 4805 | 3204 | 32.04% | Redeemed | Sep-11 | 3299 | 4949 | 3299 | 32.99% | Redeemed | Aug-11 | 2208 | 3312 | 2208 | 22.08% | Redeemed | Jul-11 | 2224 | 3337 | 2225 | 22.25% | Redeemed | Jun-11 | 964 | 1423 | 963 | 9.63% | Redeemed | May-11 | 2519 | 3779 | 2519 | 25.19% | Redeemed | Apr-11 | 2563 | 3845 | 2563 | 25.63% | Redeemed | Mar-11 | 2522 | 3783 | 2522 | 25.22% | Redeemed | Feb-11 | 3659 | 5488 | 3659 | 36.59% | Redeemed | Jan-11 | 4089 | 6134 | 4089 | 40.89% | Redeemed | Dec-10 | 2505 | 3758 | 2505 | 25.05% | Redeemed | Nov-10 | 2383 | 3574 | 2383 | 23.83% | Redeemed | Oct-10 | 3309 | 4963 | 3309 | 33.09% | Redeemed |
|
Capacity: 1218 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|