Red Tile Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Red Tile Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Cambridgeshire    
Type of installation: Wind    on/offshore: on
Turbines :12  Capacity : 24 MW
Approx Date of 1st power generation: March 2007

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Red Tile Wind Farm consists of twelve 2MW wind turbines which will generate as much electricity each year as is used by 13,500 homes. Regionally, the output from Red Tile will contribute significantly to the East of England’s 2010 targets for renewable energy production.

 Turbine Make and Specs

Model: Senvion MM82 Start Speed: 2.5
Capacity: 2 Optimal Speed: 6
Rotor Diameter: 82 Stop Speed: 12
Hub Height 59   Avg for all turbines:59 Avg. Elevation: 0
Web Page: http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf
Comment: 0

 Address

Red Tile Wind Farm 1 - A Tick Fen Warboys Huntingdon Cambridgeshire England

 Associated Companies.

Relationship Company (For: Red Tile )
OperatorEDF Energy Renewables
OwnerEDF Energy Renewables
DeveloperWind Prospect

 DECC Data on this Project: Red Tile :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Red Tile     24 MW
Energy Type: Wind Onshore
County: Cambridgeshire     Country: England     LPA: Huntingdonshire District Council
Site ID and Reference: 3608 / N00280W     District:
Applicant: Wind Prospect Developments     Application : 0302827FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 12 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 24
Site Address: Land Adjacent to Broadpool Farm High Fen Straight Drove Warboys Huntingdon
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 534086 / 534086
Development Status: Operational
Application Submitted: 10/15/2003 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/1/2006    
Generator Live 12/1/2006 This Record Last Updated: 12/4/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Red Tile: Wind :

Site Name: Red Tile Wind Farm 2 - A
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00169RQEN
Capacity: 14000 Status: Live
Accreditation Date: 10/15/2003    
Commission Date: 12/1/2006    
Applicant: Fenland Windfarms Ltd
Applicant Address: Fenland Windfarms Ltd Bryn Isel 10A Short Bridge Street Newrown, Powys SY16 2LW
Address: Red Tile Wind Farm 2 - A Tick FenWarboysHuntingdonCambridgeshire England

Site Name: Red Tile Wind Farm 1 - A
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00168RQEN
Capacity: 10000 Status: Live
Accreditation Date: 10/15/2003    
Commission Date: 12/1/2006    
Applicant: Fenland Windfarms Ltd
Applicant Address: Fenland Windfarms Ltd Bryn Isel 10A Short Bridge Street Newrown, Powys SY16 2LW
Address: Red Tile Wind Farm 1 - A Tick FenWarboysHuntingdonCambridgeshire England

Site Name: Red Tile Wind Farm 1 - A
Generator Type: Wind
Scheme : REGO Generator ID: G00861NWEN
Capacity: 10000 Status: Live
Accreditation Date: 10/15/2003    
Commission Date: 12/1/2006    
Applicant: Fenland Windfarms Ltd
Applicant Address: Fenland Windfarms Ltd Bryn Isel 10A Short Bridge Street Newrown, Powys SY16 2LW
Address: Red Tile Wind Farm 1 - A Tick FenWarboysHuntingdonCambridgeshire England
 
Assumptions: Capacity: 10000kW 10 MW,
Thus over the month Capacity * 720 hours per month = 7200 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 1897 18.97% Issued
01/02/2018 1912 19.12% Issued
01/01/2018 2958 29.58% Issued
01/12/2017 2821 28.21% Issued
01/11/2017 2057 20.57% Issued
01/10/2017 2616 26.16% Issued
01/09/2017 1348 13.48% Issued
01/08/2017 1256 12.56% Issued
01/07/2017 1207 12.07% Issued
01/06/2017 1624 16.24% Issued
01/05/2017 1311 13.11% Issued
01/04/2017 1277 12.77% Issued
01/03/2017 2193 21.93% Redeemed
01/02/2017 2001 20.01% Redeemed
01/01/2017 1521 15.21% Redeemed
Dec-16 01537 1537 15.37% Issued
Nov-16 01844 1844 18.44% Issued
Oct-16 01417 1417 14.17% Issued
Sep-16 01460 1460 14.60% Issued
Aug-16 01557 1557 15.57% Issued
Jul-16 01103 1103 11.03% Issued
Jun-16 01117 1117 11.17% Issued
Jun-16 01117 1117 11.17% Issued
May-16 01452 1452 14.52% Issued
May-16 01452 1452 14.52% Issued
Apr-16 01262 785 7.85% Issued
Mar-16 01924 1924 19.24% Redeemed
Feb-16 02355 2355 23.55% Redeemed
Jan-16 02817 735 7.35% Redeemed
Dec-15 03935 3935 39.35% Redeemed
Nov-15 03179 3179 31.79% Redeemed
Oct-15 01221 1221 12.21% Redeemed
Sep-15 01052 1052 10.52% Redeemed
Aug-15 01234 1234 12.34% Redeemed
Jul-15 14411441 1441 14.41% Redeemed
Jun-15 13491349 1349 13.49% Redeemed
May-15 20232023 2023 20.23% Redeemed
Apr-15 13681368 1368 13.68% Redeemed
Mar-15 26512651 2651 26.51% Redeemed
Feb-15 20522052 2052 20.52% Redeemed
Jan-15 32533253 3253 32.53% Redeemed
Dec-14 31193119 3119 31.19% Redeemed
Nov-14 14841484 1484 14.84% Redeemed
Oct-14 20742074 2074 20.74% Redeemed
Sep-14 349346 349 3.49% Redeemed
Aug-14 14801480 1480 14.80% Redeemed
Jul-14 949944 949 9.49% Redeemed
Jun-14 658652 658 6.58% Redeemed
May-14 14441444 1444 14.44% Redeemed
Apr-14 13451345 1345 13.45% Redeemed
Mar-14 17661766 1766 17.66% Redeemed
Feb-14 19721972 1972 19.72% Redeemed
Jan-14 18191819 1819 18.19% Redeemed
Dec-13 26742674 1 0.01% Redeemed
Nov-13 18231823 1822 18.22% Redeemed
Oct-13 24032403 2403 24.03% Redeemed
Sep-13 453450 453 4.53% Redeemed
Aug-13 689689 689 6.89% Redeemed
Jul-13 424419 424 4.24% Redeemed
Jun-13 14541454 1454 14.54% Redeemed
May-13 14331433 1433 14.33% Redeemed
Apr-13 24542455 2455 24.55% Redeemed
Mar-13 20872087 2087 20.87% Redeemed
Feb-13 19411941 1941 19.41% Redeemed
Jan-13 18571858 1858 18.58% Redeemed
Dec-12 28722871 2871 28.71% Redeemed
Nov-12 18411841 1841 18.41% Redeemed
Oct-12 17841784 1784 17.84% Redeemed
Sep-12 18371837 1837 18.37% Redeemed
Aug-12 11221122 1122 11.22% Redeemed
Jul-12 998998 998 9.98% Redeemed
Jun-12 20442044 2044 20.44% Redeemed
May-12 10991100 1100 11.00% Redeemed
Apr-12 15661566 1566 15.66% Redeemed
Mar-12 12501244 1250 12.50% Redeemed
Feb-12 16441644 1644 16.44% Redeemed
Jan-12 26122612 2612 26.12% Redeemed
Dec-11 37473747 3747 37.47% Redeemed
Nov-11 17411741 1741 17.41% Redeemed
Oct-11 26312631 2631 26.31% Redeemed
Sep-11 19671967 1967 19.67% Redeemed
Aug-11 12991298 1298 12.98% Redeemed
Jul-11 11011101 1101 11.01% Redeemed
Jun-11 14261426 1426 14.26% Redeemed
May-11 21982199 2199 21.99% Redeemed
Apr-11 15411540 1540 15.40% Redeemed
Mar-11 10611062 1062 10.62% Redeemed
Feb-11 18931893 1893 18.93% Redeemed
Jan-11 20122012 2012 20.12% Redeemed
Dec-10 14971496 1496 14.96% Redeemed
Nov-10 21962197 2197 21.97% Redeemed
Oct-10 18241824 1824 18.24% Redeemed

 Calculations


Capacity: 48
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/24/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 48 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 353559

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School