East Anglia 1 Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

East Anglia 1 Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Lowestoft    
Type of installation: Wind    on/offshore: off
Turbines :102  Capacity : 714 MW
Approx Date of 1st power generation: August 2020

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Feb 2015 CfD auction: One of the two successful offshore wind projects was ScottishPower Renewables’s East Anglia 1 farm off the Suffolk coast. It will get a contract for 714 MW of capacity.

The initial plans were for the project to install up to 325 offshore turbines in a 300 kilometre square zone over 43 kilometres off the coast, delivering around 1.2GW of capacity.

However, the use of larger turbines means that the project will now see up to 240 turbines installed, while still delivering the expected 1.2GW of capacity.

ScottishPower Renewables has connected the East Anglia ONE offshore wind farm to the UK’s electricity grid. With a capacity of 714MW, the windfarm will be fully operational and producing clean, renewable energy in 2020.

 Turbine Make and Specs

Model: Siemens SWT-7.0 Start Speed: 0
Capacity: 7 Optimal Speed: 0
Rotor Diameter: 154 Stop Speed: 25
Hub Height 120   Avg for all turbines:120 Avg. Elevation: 0
Web Page: https://www.siemens.com/global/en/home/markets/wind/turbines-and-services/swt-7-0-154.html
Comment: Siemens Gamesa

 Address

 Associated Companies.

Relationship Company (For: East Anglia 1 )
DeveloperScottish Power Renewables
OwnerScottish Power Renewables
OwnerVattenfall
DeveloperVattenfall

 DECC Data on this Project: East Anglia 1 :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: East Anglia 1 (EA 1)     714 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: The Planning Inspectorate - National Infrastructure
Site ID and Reference: 2524 / B0262     District:
Applicant: Scottish Power Renewables     Application : ENO10025 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 102 Turbine Capacity: 7
Height of Turbines: Calculated capacity: 714
Site Address: Offshore, East of England
  NR32
County: Offshore Region: Offshore
OS Coordinates: 685500 / 685500
Development Status: Operational
Application Submitted: 11/21/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/24/2018    
Generator Live 7/28/2020 This Record Last Updated: 8/20/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: East Anglia 1: Wind :

Site Name:
Generator Type:
Scheme : Generator ID:
Capacity: Status:
Accreditation Date: 11/21/2012    
Commission Date:    
Applicant:
Applicant Address:
Address:

 Calculations


Capacity: 728
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/24/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 728 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 0

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School