East Anglia 1 Wind Farm (Wind , Active) Location in the UK : England, Lowestoft Type of installation: Wind on/offshore: off Turbines :102 Capacity : 714 MW Approx Date of 1st power generation: August 2020
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Feb 2015 CfD auction: One of the two successful offshore wind projects was ScottishPower Renewables’s East Anglia 1 farm off the Suffolk coast. It will get a contract for 714 MW of capacity.
The initial plans were for the project to install up to 325 offshore turbines in a 300 kilometre square zone over 43 kilometres off the coast, delivering around 1.2GW of capacity.
However, the use of larger turbines means that the project will now see up to 240 turbines installed, while still delivering the expected 1.2GW of capacity.
ScottishPower Renewables has connected the East Anglia ONE offshore wind farm to the UK’s electricity grid. With a capacity of 714MW, the windfarm will be fully operational and producing clean, renewable energy in 2020.
Model: |
Siemens SWT-7.0
|
Start Speed: |
0
|
Capacity: |
7
|
Optimal Speed: |
0
|
Rotor Diameter: |
154
|
Stop Speed: |
25
|
Hub Height |
120 Avg for all turbines:120
|
Avg. Elevation: |
0
|
Web Page: |
https://www.siemens.com/global/en/home/markets/wind/turbines-and-services/swt-7-0-154.html |
Comment: |
Siemens Gamesa
|
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
East Anglia 1 (EA 1) 714 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
2524 / B0262
District:
|
Applicant: |
Scottish Power Renewables
Application :
ENO10025
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
102 |
Turbine Capacity: |
7 |
Height of Turbines: |
|
Calculated capacity: |
714 |
Site Address: |
Offshore, East of England
|
|
NR32
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
685500 / 685500
|
Development Status: |
Operational
|
Application Submitted: |
11/21/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/24/2018
|
|
|
Generator Live |
7/28/2020
|
This Record Last Updated: |
8/20/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
|
Generator Type: |
|
Scheme : |
|
Generator ID: |
|
Capacity: |
|
Status: |
|
Accreditation Date: |
11/21/2012
|
|
|
Commission Date: |
|
|
|
Applicant: |
|
Applicant Address: |
|
Address: |
|
Capacity: 728 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|