Beinneun Wind Farm (Wind , Active) Location in the UK : Scotland, IV63 7YJ Type of installation: Wind on/offshore: on Turbines :32 Capacity : 108.8 MW Approx Date of 1st power generation: February 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The Beinneun Wind Farm at 85MW will be Blue Energy’s largest UK wind project
Capacity
Up to 85MW
Turbine
In 3MW – 3.4MW range
The Beinneun project was consented within one year of registration, with no formal objections from either statutory bodies or the local community.
Model: |
Senvion M104
|
Start Speed: |
4
|
Capacity: |
3.4
|
Optimal Speed: |
11
|
Rotor Diameter: |
104
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:80
|
Avg. Elevation: |
534
|
Web Page: |
http://www.repower.de/fileadmin/download/produkte/RE_PP_3.4M104_uk.pdf |
Comment: |
|
Beinneun Wind Farm Glenmoriston IV63 7YJ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Beinneun Windfarm Extension 23.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
3619 / B1325
District:
|
Applicant: |
Octopus Investments/Blue Energy
Application :
EC00002095
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
3.3999999999999999 |
Height of Turbines: |
136 |
Calculated capacity: |
23.8 |
Site Address: |
8km west of Invergarry
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
220442 / 220442
|
Development Status: |
Operational
|
Application Submitted: |
10/14/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
7/15/2015
|
|
|
Generator Live |
2/16/2017
|
This Record Last Updated: |
4/3/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
6/2/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Beinneun 85 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
3787 / AA182
District:
|
Applicant: |
Octopus Investments/Blue Energy
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
25 |
Turbine Capacity: |
3.3999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
85 |
Site Address: |
8km west of Invergarry
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
220442 / 220442
|
Development Status: |
Operational
|
Application Submitted: |
11/4/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
7/15/2015
|
|
|
Generator Live |
2/16/2017
|
This Record Last Updated: |
7/31/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Beinneun Wind Farm
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00262SQSC
|
Capacity: |
107473
|
Status: |
Live
|
Accreditation Date: |
11/4/2011
|
|
|
Commission Date: |
2/9/2017
|
|
|
Applicant: |
Beinneun Wind Farm Limited
|
Applicant Address: |
6th Floor
33 Holborn
London
EC1N 2HT
England
|
Address: |
Beinneun Wind Farm
Glenmoriston
IV63 7YJ
Scotland
|
Site Name: |
Beinneun Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02567NWSC
|
Capacity: |
107473
|
Status: |
Live
|
Accreditation Date: |
11/4/2011
|
|
|
Commission Date: |
2/9/2017
|
|
|
Applicant: |
Beinneun Wind Farm Limited
|
Applicant Address: |
6th Floor
33 Holborn
London
EC1N 2HT
England
|
Address: |
Beinneun Wind Farm
Glenmoriston
IV63 7YJ
Scotland
|
|
Assumptions: Capacity: 107473kW 107.473 MW, Thus over the month Capacity * 720 hours per month = 77380.56 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 20394 | 18.98% | Issued | 01/03/2018 | | | 12361 | 11.50% | Issued | 01/02/2018 | | | 8317 | 7.74% | Issued | 01/01/2018 | | | 12977 | 12.07% | Issued | 01/12/2017 | | | 11706 | 10.89% | Retired | 01/11/2017 | | | 15590 | 14.51% | Retired | 01/10/2017 | | | 33316 | 31.00% | Retired | 01/09/2017 | | | 15018 | 13.97% | Retired | 01/08/2017 | | | 14426 | 13.42% | Retired | 01/07/2017 | | | 15462 | 14.39% | Retired | 01/06/2017 | | | 16911 | 15.74% | Retired |
|
Capacity: 224 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|