Loading
Page views this IP this session = 1 of 10 unsubscribed pagesRoyal Seaforth Dock Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Royal Seaforth Dock Wind Farm (Wind , Active) Location in the UK : England, Merseyside Type of installation: Wind on/offshore: on Turbines :6 Capacity : 3.6 MW Approx Date of 1st power generation: April 1999
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
This scheme comprises 6 x Vestas V44 turbines (600 kW each) with an installed capacity of 3.6 MW. It is owned and operated by Peel Energy and has been running since 1999 under a NFFO contract.
Model: |
Vestas V44
|
Start Speed: |
5
|
Capacity: |
0.6
|
Optimal Speed: |
15
|
Rotor Diameter: |
0
|
Stop Speed: |
25
|
Hub Height |
50 Avg for all turbines:50
|
Avg. Elevation: |
5
|
Web Page: |
|
Comment: |
|
Royal Seaforth Docks Port of Liverpool Sefton Liverpool L20 1BG England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Royal Seaforth Dock Wind Farm 3 MW
|
Energy Type: |
Wind Onshore |
County: |
Merseyside Country: England LPA: Sefton Council
|
Site ID and Reference: |
2574 / 04076W3
District:
|
Applicant: |
Mersey Docks and Harbour Company and Windcluster Limited
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
0.5 |
Height of Turbines: |
|
Calculated capacity: |
3 |
Site Address: |
Royal Seaforth Dock Port of Liverpool Bootle, Sefton Merseyside
|
|
|
County: |
Merseyside Region: North West
|
OS Coordinates: |
331100 / 331100
|
Development Status: |
Operational
|
Application Submitted: |
10/12/1995
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
8/22/1997
|
Construction Date: |
|
|
|
Generator Live |
4/24/1999
|
This Record Last Updated: |
2/10/2003
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
8/22/1997 |
Site Name: |
ROYAL SEAFORTH DOCKS
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00031RQEN
|
Capacity: |
2970
|
Status: |
Live
|
Accreditation Date: |
10/12/1995
|
|
|
Commission Date: |
4/9/1999
|
|
|
Applicant: |
Seaforth Windfarm Ltd
|
Applicant Address: |
Peel Holdings Ltd
The Dome
MANCHESTER
M17 8PL
England
|
Address: |
Royal Seaforth Docks
Port of Liverpool
Sefton
Liverpool
L20 1BG
England
|
Site Name: |
ROYAL SEAFORTH DOCKS
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00219NWEN
|
Capacity: |
2970
|
Status: |
Live
|
Accreditation Date: |
10/12/1995
|
|
|
Commission Date: |
4/9/1999
|
|
|
Applicant: |
Seaforth Windfarm Ltd
|
Applicant Address: |
Peel Holdings Ltd
The Dome
MANCHESTER
M17 8PL
England
|
Address: |
Royal Seaforth Docks
Port of Liverpool
Sefton
Liverpool
L20 1BG
England
|
|
Assumptions: Capacity: 2970kW 2.97 MW, Thus over the month Capacity * 720 hours per month = 2138.4 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 532 | 17.91% | Issued | 01/02/2018 | | | 579 | 19.49% | Issued | 01/01/2018 | | | 959 | 32.29% | Issued | 01/12/2017 | | | 753 | 25.35% | Issued | 01/11/2017 | | | 749 | 25.22% | Issued | 01/10/2017 | | | 736 | 24.78% | Issued | 01/09/2017 | | | 585 | 19.70% | Issued | 01/08/2017 | | | 456 | 15.35% | Issued | 01/07/2017 | | | 384 | 12.93% | Issued | 01/06/2017 | | | 551 | 18.55% | Issued | 01/05/2017 | | | 300 | 10.10% | Issued | 01/04/2017 | | | 624 | 21.01% | Issued | 01/03/2017 | | | 615 | 20.71% | Redeemed | 01/02/2017 | | | 612 | 20.61% | Redeemed | 01/01/2017 | | | 636 | 21.41% | Redeemed | Dec-16 | 0 | 560 | 560 | 18.86% | Issued | Nov-16 | 0 | 458 | 458 | 15.42% | Issued | Oct-16 | 0 | 218 | 221 | 7.44% | Issued | Sep-16 | 0 | 543 | 543 | 18.28% | Issued | Aug-16 | 0 | 651 | 651 | 21.92% | Issued | Jul-16 | 0 | 507 | 507 | 17.07% | Issued | Jun-16 | 0 | 207 | 210 | 7.07% | Issued | Jun-16 | 0 | 207 | 210 | 7.07% | Issued | May-16 | 0 | 314 | 314 | 10.57% | Issued | Apr-16 | 0 | 519 | 519 | 17.47% | Issued | Mar-16 | 0 | 348 | 350 | 11.78% | Redeemed | Feb-16 | 0 | 620 | 620 | 20.88% | Redeemed | Jan-16 | 0 | 763 | 763 | 25.69% | Redeemed | Dec-15 | 0 | 932 | 932 | 31.38% | Redeemed | Nov-15 | 0 | 960 | 960 | 32.32% | Redeemed | Oct-15 | 0 | 347 | 349 | 11.75% | Redeemed | Sep-15 | 0 | 293 | 295 | 9.93% | Redeemed | Aug-15 | 0 | 368 | 368 | 12.39% | Redeemed | Jul-15 | 607 | 606 | 607 | 20.44% | Expired | Jun-15 | 461 | 461 | 461 | 15.52% | Redeemed | May-15 | 852 | 852 | 852 | 28.69% | Redeemed | Apr-15 | 437 | 435 | 437 | 14.71% | Redeemed | Mar-15 | 752 | 752 | 752 | 25.32% | Redeemed | Feb-15 | 558 | 558 | 558 | 18.79% | Redeemed | Jan-15 | 1120 | 1120 | 1120 | 37.71% | Redeemed | Dec-14 | 1047 | 1047 | 1047 | 35.25% | Redeemed | Nov-14 | 427 | 427 | 427 | 14.38% | Redeemed | Oct-14 | 665 | 665 | 665 | 22.39% | Redeemed | Sep-14 | 146 | 143 | 146 | 4.92% | Redeemed | Aug-14 | 778 | 778 | 778 | 26.20% | Redeemed | Jul-14 | 314 | 311 | 314 | 10.57% | Redeemed | Jun-14 | 190 | 188 | 190 | 6.40% | Redeemed | May-14 | 433 | 431 | 433 | 14.58% | Redeemed | Apr-14 | 440 | 440 | 440 | 14.81% | Redeemed | Mar-14 | 599 | 598 | 598 | 20.13% | Redeemed | Feb-14 | 1011 | 1011 | 1011 | 34.04% | Redeemed | Jan-14 | 847 | 847 | 847 | 28.52% | Redeemed | Dec-13 | 1053 | 1053 | 1053 | 35.45% | Redeemed | Nov-13 | 653 | 653 | 653 | 21.99% | Redeemed | Oct-13 | 691 | 691 | 691 | 23.27% | Redeemed | Sep-13 | 431 | 431 | 431 | 14.51% | Redeemed | Aug-13 | 54 | 54 | 54 | 1.82% | Redeemed | Jul-13 | 244 | 241 | 244 | 8.22% | Redeemed | Jun-13 | 550 | 550 | 550 | 18.52% | Redeemed | May-13 | 739 | 739 | 739 | 24.88% | Redeemed | Apr-13 | 722 | 722 | 722 | 24.31% | Redeemed | Mar-13 | 474 | 474 | 474 | 15.96% | Redeemed | Feb-13 | 534 | 535 | 535 | 18.01% | Redeemed | Jan-13 | 690 | 690 | 690 | 23.23% | Redeemed | Dec-12 | 946 | 946 | 946 | 31.85% | Redeemed | Nov-12 | 696 | 696 | 696 | 23.43% | Redeemed | Oct-12 | 538 | 538 | 538 | 18.11% | Redeemed | Sep-12 | 815 | 815 | 815 | 27.44% | Redeemed | Aug-12 | 472 | 469 | 472 | 15.89% | Redeemed | Jul-12 | 545 | 545 | 545 | 18.35% | Redeemed | Jun-12 | 663 | 664 | 664 | 22.36% | Redeemed | May-12 | 465 | 465 | 465 | 15.66% | Redeemed | Apr-12 | 649 | 649 | 649 | 21.85% | Redeemed | Mar-12 | 409 | 406 | 408 | 13.74% | Redeemed | Feb-12 | 594 | 595 | 595 | 20.03% | Redeemed | Jan-12 | 720 | 720 | 720 | 24.24% | Redeemed | Dec-11 | 1330 | 1330 | 1330 | 44.78% | Redeemed | Nov-11 | 695 | 695 | 695 | 23.40% | Redeemed | Oct-11 | 974 | 974 | 974 | 32.79% | Redeemed | Sep-11 | 905 | 906 | 906 | 30.51% | Redeemed | Aug-11 | 597 | 596 | 596 | 20.07% | Redeemed | Jul-11 | 455 | 452 | 455 | 15.32% | Redeemed | Jun-11 | 499 | 499 | 499 | 16.80% | Redeemed | May-11 | 1218 | 1218 | 1218 | 41.01% | Redeemed | Apr-11 | 429 | 427 | 429 | 14.44% | Redeemed | Mar-11 | 368 | 365 | 369 | 12.42% | Redeemed | Feb-11 | 729 | 729 | 729 | 24.55% | Expired | Jan-11 | 552 | 552 | 552 | 18.59% | Expired | Dec-10 | 385 | 382 | 384 | 12.93% | Expired | Nov-10 | 622 | 622 | 622 | 20.94% | Expired | Oct-10 | 641 | 641 | 641 | 21.58% | Expired |
|
Capacity: 7.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/26/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|