Page views this IP this session = 1 of 10 unsubscribed pagesGarreg Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Garreg Wind Farm (Wind , Active) Location in the UK : Wales, Type of installation: Wind on/offshore: on Turbines :23 Capacity : 46 MW Approx Date of 1st power generation: February 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Refused - Appeal Lodged
The proposed Garreg Lwyd Hill Wind Farm is situated between Felindre and Llanbadarn Fynydd in Radnorshire, Powys and is located in the Newtown South Strategic Search Area (SSA), for which is described by the Welsh Assembly in Technical Advice Note 8 (TAN8) - Renewable Energy. TAN8 has set out seven SSAs in Wales which were chosen for the good wind speeds and lack of statutory designations and are considered to be suitable for large scale wind farms, such as Garreg Lwyd Hill.
Model: |
Vestas V100
|
Start Speed: |
5
|
Capacity: |
2.6
|
Optimal Speed: |
15
|
Rotor Diameter: |
100
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:80
|
Avg. Elevation: |
408
|
Web Page: |
https://www.vensys.de/fileadmin/user_upload/Windkraftanlagen/2.5_MW-Plattform/Vensys_100/DS-VENSYS-100-2.5MW.pdf |
Comment: |
. The V10 2.6MW is based on the V90 3MW platform,
one of the most proven platforms in the industry, with more than 2,170 instalations since 202.
The Vestas V10 2.6MW machine has a hub height of 80m and a rotor diameter of 10m, taking
the maximum height when the blade is in a vertical positon to 130m.
|
Garreg Lwyd Hill Between Felindre and Llanbadarn Fynydd Newtown LD1 6YF Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Garreg Lwyd 34 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
3711 / A0287
District:
|
Applicant: |
Renewables Infrastructure Group (TRIG)
Application :
P/2008/0785
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
17 |
Turbine Capacity: |
2 |
Height of Turbines: |
137 |
Calculated capacity: |
34 |
Site Address: |
Garreg Lwyd Hill Between Felindre & Llanbadarn Fynydd, Llandrindod Wells, Powys
|
|
LD1 6YF
|
County: |
Powys Region: Wales
|
OS Coordinates: |
312758 / 312758
|
Development Status: |
Operational
|
Application Submitted: |
5/27/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
9/5/2013
|
Construction Date: |
1/11/2016
|
|
|
Generator Live |
2/22/2017
|
This Record Last Updated: |
10/4/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
3/4/2014 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
9/5/2013 |
Site Name: |
Garreg Lwyd Hill
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00205RQWA
|
Capacity: |
33000
|
Status: |
Live
|
Accreditation Date: |
5/27/2008
|
|
|
Commission Date: |
2/22/2017
|
|
|
Applicant: |
RES Ltd
|
Applicant Address: |
Beaufort Court
Egg Farm Lane
Kings Langley
WD4 8LR
England
|
Address: |
Garreg Lwyd Hill
Ddol
Llanbadarn Fynydd
Llanddrindon Wells
LD1 6YF
Wales
|
Site Name: |
Garreg Lwyd Hill
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01658NWWA
|
Capacity: |
33000
|
Status: |
Live
|
Accreditation Date: |
5/27/2008
|
|
|
Commission Date: |
2/22/2017
|
|
|
Applicant: |
RES Ltd
|
Applicant Address: |
Beaufort Court
Egg Farm Lane
Kings Langley
WD4 8LR
England
|
Address: |
Garreg Lwyd Hill
Ddol
Llanbadarn Fynydd
Llanddrindon Wells
LD1 6YF
Wales
|
|
Assumptions: Capacity: 33000kW 33 MW, Thus over the month Capacity * 720 hours per month = 23760 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 9538 | 28.90% | Issued | 01/02/2018 | | | 9382 | 28.43% | Issued | 01/01/2018 | | | 12517 | 37.93% | Issued | 01/12/2017 | | | 12312 | 37.31% | Issued | 01/11/2017 | | | 9804 | 29.71% | Issued | 01/10/2017 | | | 9734 | 29.50% | Issued | 01/09/2017 | | | 8411 | 25.49% | Issued | 01/08/2017 | | | 7533 | 22.83% | Issued | 01/07/2017 | | | 7345 | 22.26% | Issued | 01/06/2017 | | | 9649 | 29.24% | Issued |
|
Capacity: 68 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|