Loading
Page views this IP this session = 1 of 10 unsubscribed pagesShepham Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Shepham Wind Farm (Wind , Active) Location in the UK : England, polegate Type of installation: Wind on/offshore: on Turbines :3 Capacity : 6 MW Approx Date of 1st power generation: January 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Originally the five turbines were being planned as up to 140 metres high, but GTR has now concluded that turbines of around 125 metres would be most appropriate. Not sure which type, look like Vestas.
Model: |
Vestas V80
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
80
|
Stop Speed: |
25
|
Hub Height |
75 Avg for all turbines:75
|
Avg. Elevation: |
3
|
Web Page: |
|
Comment: |
|
Shepham Wind Farm Shepham Lane Polegate BN26 6QU England
Relationship |
Company (For:
Shepham
) |
Developer | Belltown |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Shepham Lane 7.5 MW
|
Energy Type: |
Wind Onshore |
County: |
East Sussex Country: England LPA: Wealden District Council
|
Site ID and Reference: |
4326 / B0671
District:
|
Applicant: |
Foresight
Application :
WD/2013/0346/MEA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
7.5 |
Site Address: |
Land off Shepham Lane, North of A27, Polegate
|
|
BN24 5BT
|
County: |
East Sussex Region: South East
|
OS Coordinates: |
560023 / 560023
|
Development Status: |
Operational
|
Application Submitted: |
2/18/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
5/9/2013
|
Construction Date: |
8/16/2016
|
|
|
Generator Live |
1/12/2017
|
This Record Last Updated: |
5/1/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
1/7/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
12/18/2013 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
5/9/2013 |
Site Name: |
Shepham Lane 12.5 MW
|
Energy Type: |
Wind Onshore |
County: |
East Sussex Country: England LPA: Wealden District Council
|
Site ID and Reference: |
3725 / A0401
District:
|
Applicant: |
Galliford Try Renewables (GTR)
Application :
WD/2011/2137/MEA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
12.5 |
Site Address: |
Land off Shepham Lane, North of A27, Polegate
|
|
|
County: |
East Sussex Region: South East
|
OS Coordinates: |
560069 / 560069
|
Development Status: |
Revised
|
Application Submitted: |
9/30/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
8/6/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
7/17/2012 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Shepham Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00390RQEN
|
Capacity: |
7460
|
Status: |
Live
|
Accreditation Date: |
9/30/2011
|
|
|
Commission Date: |
11/29/2016
|
|
|
Applicant: |
Second Generation Shepham Limited
|
Applicant Address: |
1A Petersham Mews
LONDON
SW7 5NR
England
|
Address: |
Shepham Wind Farm
Shepham Lane
Polegate
BN26 6QU
England
|
Site Name: |
Shepham Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G03014NWEN
|
Capacity: |
7460
|
Status: |
Live
|
Accreditation Date: |
9/30/2011
|
|
|
Commission Date: |
11/29/2016
|
|
|
Applicant: |
Second Generation Shepham Limited
|
Applicant Address: |
1A Petersham Mews
LONDON
SW7 5NR
England
|
Address: |
Shepham Wind Farm
Shepham Lane
Polegate
BN26 6QU
England
|
|
Assumptions: Capacity: 7460kW 7.46 MW, Thus over the month Capacity * 720 hours per month = 5371.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 1122 | 15.04% | Issued | 01/03/2018 | | | 1452 | 19.46% | Issued | 01/03/2018 | | | 1 | 0.01% | Issued | 01/02/2018 | | | 1363 | 18.27% | Issued | 01/01/2018 | | | 2251 | 30.17% | Issued | 01/12/2017 | | | 1753 | 23.50% | Issued | 01/11/2017 | | | 1132 | 15.17% | Issued | 01/10/2017 | | | 1354 | 18.15% | Issued | 01/09/2017 | | | 917 | 12.29% | Issued | 01/08/2017 | | | 841 | 11.27% | Retired | 01/07/2017 | | | 1056 | 14.16% | Issued | 01/06/2017 | | | 1181 | 15.83% | Issued | 01/05/2017 | | | 664 | 8.90% | Issued | 01/04/2017 | | | 489 | 6.55% | Issued | 01/03/2017 | | | 1452 | 19.46% | Redeemed | 01/02/2017 | | | 1260 | 16.89% | Redeemed | 01/01/2017 | | | 574 | 7.69% | Redeemed |
|
Capacity: 12 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|