Page views this IP this session = 1 of 10 unsubscribed pagesSeagreen Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Seagreen Wind Farm (Wind , Active) Location in the UK : Scotland, carnoustie Type of installation: Wind on/offshore: off Turbines :114 Capacity : 1100 MW Approx Date of 1st power generation: August 2022
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Seagreen Wind Energy Limited, a joint venture partnership between SSE and Fluor, was awarded by The Crown Estate the exclusive development rights for the Firth of Forth Zone of the UK's Round 3 offshore wind farm development programme.
The Zone is located approximated 25km east of Fife and covers an area of 2,852km2 in the outer Firth of Forth. The zone has a potential installed capacity of 3.5GW which would significantly increase Scotland’s entire existing renewables capacity.
Model: |
Vestas V164-8MW
|
Start Speed: |
0
|
Capacity: |
8
|
Optimal Speed: |
0
|
Rotor Diameter: |
164
|
Stop Speed: |
0
|
Hub Height |
125 Avg for all turbines:0
|
Avg. Elevation: |
-21
|
Web Page: |
https://en.wikipedia.org/wiki/Vestas_V164 |
Comment: |
MHI VESTAS on the Isle of Wight has been selected as the preferred turbine supplier for the proposed Navitus Bay offshore wind farm.
The turbines’ 80m long blades will be made at the company’s factory, supporting the 200 local jobs currently being created there.
MHI Vestas will supply its latest V164-8MW wind turbine.
|
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Seagreen 1075 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: Scotland LPA: Marine Scotland
|
Site ID and Reference: |
2540 / B0267
District:
|
Applicant: |
SSE / Seagreen Wind Energy Ltd
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
114 |
Turbine Capacity: |
9.1999999999999993 |
Height of Turbines: |
|
Calculated capacity: |
1048.8 |
Site Address: |
Firth of Forth Wind Zone 2, Dundee, Tayside
|
|
DD4 0AD
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
404600 / 404600
|
Development Status: |
Operational
|
Application Submitted: |
10/23/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/1/2021
|
|
|
Generator Live |
10/16/2023
|
This Record Last Updated: |
10/18/2023
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
MW
|
Energy Type: |
|
County: |
Country: LPA:
|
Site ID and Reference: |
/
District:
|
Applicant: |
Application :
|
(Go to search to find Application) |
Site Address: |
|
|
|
County: |
Region:
|
OS Coordinates: |
/
|
Development Status: |
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 2140 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 0 m/s (0 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|