Sorry I found no matches, Please try again. 176
vid = 338pws_id = 350576pws_id = 350576
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.118.162.8 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Siddick Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Siddick Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Cumbria    
Type of installation: Wind    on/offshore: on
Turbines :7  Capacity : 4.2 MW
Approx Date of 1st power generation: 1996

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Adjacent to Oldside Wind Farm

 Turbine Make and Specs

Model: Vestas V42 Start Speed: 4
Capacity: 0.6 Optimal Speed: 15
Rotor Diameter: 42 Stop Speed: 25
Hub Height 40   Avg for all turbines:40 Avg. Elevation: 5
Web Page:
Comment:

 Address

Workington Cumbria Workington CA14 1JU England

 Associated Companies.

Relationship Company (For: Siddick )
OperatorE.on UK
OwnerE.on UK
DeveloperWind Prospect

 DECC Data on this Project: Siddick :2624

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Siddick Wind Farm     4.2 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: Allerdale Borough Council
Site ID and Reference: 2624 / 07124W3     District:
Applicant: Windprospect / Windcluster     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 0.59999999999999998
Height of Turbines: Calculated capacity: 4.2
Site Address: Siddick Wind Farm Siddick Workington Cumbria
 
County: Cumbria Region: North West
OS Coordinates: 300600 / 300600
Development Status: Operational
Application Submitted: 4/21/1995 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 8/1/1996 This Record Last Updated: 10/30/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Siddick: Wind : G00220NWEN

Site Name: SIDDICK
Generator Type: Wind
Scheme : REGO Generator ID: G00220NWEN
Capacity: 4196.5 Status: Live
Accreditation Date: 4/21/1995    
Commission Date: 8/1/1996    
Applicant: Curlew Power Limited
Applicant Address: 85 Verdayne Avenue CROYDON CR0 8TW England
Address: Workington Cumbria Workington CA14 1JU England
 
Assumptions: Capacity: 4196.5kW 4.1965 MW,
Thus over the month Capacity * 720 hours per month = 3021.48 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 738 17.59% Issued
01/03/2018 681 16.23% Issued
01/02/2018 581 13.84% Issued
01/01/2018 1153 27.48% Issued
01/12/2017 890 21.21% Issued
01/11/2017 937 22.33% Issued
01/10/2017 1233 29.38% Issued
01/09/2017 645 15.37% Retired
01/08/2017 700 16.68% Retired
01/07/2017 565 13.46% Issued
01/06/2017 859 20.47% Issued
01/05/2017 482 11.49% Issued
01/04/2017 566 13.49% Issued
01/03/2017 740 17.63% Redeemed
01/02/2017 814 19.40% Redeemed
01/01/2017 689 16.42% Redeemed
Dec-16 0981 981 23.38% Issued
Nov-16 0651 651 15.51% Issued
Oct-16 0302 305 7.27% Retired
Sep-16 0848 848 20.21% Retired
Aug-16 0680 680 16.20% Retired
Jul-16 0615 615 14.66% Retired
Jun-16 0300 302 7.20% Retired
May-16 0662 662 15.78% Issued
Apr-16 0558 558 13.30% Issued
Mar-16 0575 575 13.70% Retired
Feb-16 0947 947 22.57% Retired
Jan-16 0999 999 23.81% Retired
Dec-15 01398 1398 33.31% Retired
Nov-15 01121 1121 26.71% Retired
Oct-15 0315 317 7.55% Retired
Sep-15 0323 325 7.74% Retired
Aug-15 0629 629 14.99% Retired
Jul-15 611610 610 14.54% Redeemed
Jun-15 624624 624 14.87% Redeemed
May-15 962961 961 22.90% Redeemed
Apr-15 564564 564 13.44% Redeemed
Mar-15 979978 978 23.31% Redeemed
Feb-15 779780 1 0.02% Redeemed
Jan-15 13341334 945 22.52% Redeemed
Dec-14 11461146 636 15.16% Redeemed
Nov-14 386385 385 9.17% Redeemed
Oct-14 863864 864 20.59% Redeemed
Sep-14 165162 165 3.93% Redeemed
Aug-14 752752 752 17.92% Redeemed
Jul-14 344342 344 8.20% Redeemed
Jun-14 150147 150 3.57% Redeemed
May-14 477477 477 11.37% Redeemed
Apr-14 517517 517 12.32% Redeemed
Mar-14 941941 941 22.42% Redeemed
Feb-14 12641264 1264 30.12% Redeemed
Jan-14 778778 778 18.54% Redeemed
Dec-13 15431543 1543 36.77% Redeemed
Nov-13 868867 867 20.66% Redeemed
Oct-13 968968 968 23.07% Redeemed
Sep-13 552552 552 13.15% Redeemed
Aug-13 653653 653 15.56% Redeemed
Jul-13 239235 238 5.67% Redeemed
Jun-13 412411 413 9.84% Redeemed
May-13 834834 834 19.87% Redeemed
Apr-13 952952 952 22.69% Redeemed
Mar-13 518518 518 12.34% Redeemed
Feb-13 417415 417 9.94% Redeemed
Jan-13 835835 835 19.90% Redeemed
Dec-12 873873 873 20.80% Redeemed
Nov-12 943943 943 22.47% Redeemed
Oct-12 540540 540 12.87% Redeemed
Sep-12 978978 978 23.31% Redeemed
Aug-12 464464 464 11.06% Redeemed
Jul-12 485485 485 11.56% Redeemed
Jun-12 495495 495 11.80% Redeemed
May-12 433433 433 10.32% Redeemed
Apr-12 607607 607 14.46% Redeemed
Mar-12 423420 422 10.06% Redeemed
Feb-12 659660 660 15.73% Redeemed
Jan-12 10661066 1066 25.40% Redeemed
Dec-11 14811481 1481 35.29% Redeemed
Nov-11 869869 869 20.71% Redeemed
Oct-11 11031103 1103 26.28% Redeemed
Sep-11 10231023 1023 24.38% Redeemed
Aug-11 465466 466 11.10% Redeemed
Jul-11 238234 237 5.65% Redeemed
Jun-11 318316 318 7.58% Redeemed
May-11 737737 737 17.56% Redeemed
Apr-11 473473 473 11.27% Redeemed
Mar-11 419417 420 10.01% Redeemed
Feb-11 651651 651 15.51% Redeemed
Jan-11 507507 507 12.08% Redeemed
Dec-10 170167 170 4.05% Redeemed
Nov-10 597597 597 14.23% Redeemed
Oct-10 683682 682 16.25% Redeemed

 Calculations


Capacity: 15.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 15.6 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350576

Project Info
Wind Prospect

E.on Renewables

SIDDICK and Oldside

TURBINE PLAN FOR WORKINGTON FACTORY
Iggesund Paperboard has applied for council permission to erect the turbines at its SIDDICK plant. But Allerdale council’s new policy calls for a distance of at least 800 metres between new turbines and homes.

Biomass plans gather steam
ALL the major components of a new biomass power plant at a Workington paper mill are now in place. Iggesund Paperboard in SIDDICK reached a milestone in its project last month with the arrival of a 250-tonne steam turbine.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School